(1) DEMOLITION OF EXISTING DWELLING, (2) CONSTRUCTION OF A REPLACEMENT DWELLING WHICH WILL ALSO PROVIDE FOR SELF - CONTAINED FAMILY ACCOMMODATION, (3) CONNECTION TO ALL EXISTING SERVICES AND ALL ASSOCIATED DEVELOPMENT WORKS IN LIEU OF THAT PREVIOUSLY PERMITTED UNDER PLANNING REF NO: 22/51332Decision record indexed
CONSTRUCTION OF AN EXTENSION WHICH INCLUDES ELEVATIONAL CHANGES TO EXISTING DWELLING TO PROVIDE FOR SELF CONTAINED FAMILY ACCOMMODATION AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CONVERSION OF EXISTING GARAGE INTO 2 NO. INDIVIDUAL COMMUNAL DWELLING UNITS WITH WORKS TO INCLUDE INTERNAL ALTERATIONS TO PROVIDE LIVING, DINING, AND BATHROOM FACILITIES FOR PERSONS WITH INTELLECTUAL OR PHYSICAL DISABILITIES, ALONG WITH MODIFICATIONS TO EXTERNAL ELEVATIONS AND ALL ASSOCIATED SITE WORKS. THE PROPOSED UNIT WILL HAVE A GROSS FLOOR AREA OF 122 SQM AND WILL BE LOCATED TO THE REAR OF THE EXISTING MAIN RESIDENTIAL CARE UNIT AND (2) INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND SAND POLISHING FILTER, INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
(1) RAISING THE MAIN ROOF TO PROVIDE ATTIC ACCOMMODATION INCLUDING THE ADDITION OF DORMERS, (2) DEMOLITION OF THE FRONT OUTSHOT AND ERECTION OF A NEW ONE, (3) ALTERATIONS TO THE REAR PORCH TO PROVIDE STAIRS TO THE NEW ATTIC SPACE, (4) ALTERATIONS TO THE FRONT WINDOWS AND (5) UPGRADING EXISTING SEPTIC TANK WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONVERSION OF EXISTING GARAGE INTO A SELF-CONTAINED FLAT AUXILIARY TO EXISTING DWELLING HOUSE INCLUDING ALL OTHER SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING POLYTUNNEL WITH SILAGE PIT AND ERECTION OF A NEW SLATTED AGRICULTURAL SHED WITHIN EXISTING FARMYARD COMPLEX INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
7 SILVER BIRCH, BALLYARR GLEBE, RAMELTON LETTERKENNY PO
DEMOLITION OF EXISTING TWO STOREY DWELLING DUE TO THE PRESENCE OF DEFECTIVE CONCRETE BLOCKS AND CONSTRUCTION OF A NEWLY DESIGNED REPLACEMENT STOREY AND A HALF DWELLING MAKING USE OF EXISTING SITE SERVICES AND INCLUDING ANY NECESSARY SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE AND GARAGE AND CONSTRUCTION OF A NEW DWELLING HOUSE AND GARAGE AND CONNECTION TO EXISTING SERVICESDecision record indexed
GROVEHALL OR NEWTOWN GROVE, RAMELTON, LETTERKENNY PO
AGRICULTURAL SHED AND PERMISSION FOR CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC SHED, INSTALLATION OF WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKSDecision record indexed
SINGLE STOREY DOMESTIC GARAGE AND PERMISSION FOR (A) DEMOLITION OF EXISTING MICA DEFECTIVE BLOCK TWO STOREY DWELLING GRANTED UNDER PLANNING REF. NO. 04/8078, (B) CONSTRUCTION OF A REPLACEMENT TWO STOREY DWELLING, (C) REPLACEMENT DWELLING STORM AND FOUL DRAINAGE TO BE CONNECTED TO EXISTING PREVIOUSLY APPROVED STORM AND FOUL SYSTEM GRANTED UNDER PLANNING REF. NO. 04/8078 AND (D) ALL ASSOCIATED WORKS AND SITE WORKSDecision record indexed
REFURBISHMENT AND EXTENSION OF EXISTING DERELICT DWELLING WITH (1) A NEW PORCH AND LOBBY TO THE FRONT, ADDITION OF A FIRST FLOOR WINDOW AND MODIFICATION TO EXISTING FIRST FLOOR WINDOWS, (2) EXTENSION TO THE RIGHT HAND SIDE AND REAR OF THE ORIGINAL DWELLING AND (3) ALL ASSOCIATED SITE WORKS, ABOVE AND BELOW GROUND WITH CONNECTION TO EXISTING SEPTIC TANKDecision record indexed
(1) REFURBISHMENT OF EXISTING DERELICT DWELLING HOUSE, TO INCLUDE ALTERATIONS TO EXISTING ELEVATIONS AND AN INCREASE TO THE OVERALL RIDGE HEIGHT, (2) DEMOLITION OF EXISTING ATTACHED SHEDS TO THE NORTH AND SOUTH GABLE WALLS OF THE EXISTING DWELLING, AND DEMOLITION OF AN EXISTING STAND-ALONE AGRICULTURAL SHED TO THE SOUTH-WEST OF THE DWELLING, (3) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO ABOVE MENTIONED EXISTING DWELLING, (4) INSTALLATION OF A NEW SEPTIC TANK SYSTEM TO SERVICE THE PROPOSED DEVELOPMENT, (5) UPGRADE AND WIDENING OF EXISTING ENTRANCE ACCESSING THE SITE AND (6) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM AND A DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A PART SINGLE STOREY, PART TWO-STOREY DWELLING HOUSE WITH INTEGRATED DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, NEW VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF A DWELLING HOUSE WITH WASTE WATER TREATMENT SYSTEM AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
CONVERSION OF EXISTING DOMESTIC GARAGE TO RESIDENTIAL ACCOMMODATION TO FACILITATE OCCUPANCY FOR THE DEMOLITION AND RECONSTRUCTION OF THE CURRENT ON SITE DWELLING, DUE TO THE PRESENCE OF DEFECTIVE CONCRETE BLOCKS, MAKING USE OF EXISTING SEWAGE SYSTEM, SITE SERVICES AND INCLUDING ANY NECESSARY SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING TWO STOREY DWELLING DUE TO THE PRESENCE OF DEFECTIVE PRECAST CONCRETE BLOCKS AND CONSTRUCTION OF A TWO STOREY REPLACEMENT, REPOSITIONED DWELLING TO MAKE USE OF ALL EXISTING SITE SERVICES INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONTINUATION OF THE EXISTING OPERATIONAL QUARRY FOR A 25-YEAR PERIOD. OPERATIONS WILL INCLUDE: 1) EXTRACTION, BLASTING AND ROCKING BREAKING WITHIN THE 2.62 HECTARES PREVIOUSLY PERMITTED QUARRYING AREA IN A DOWNWARD DIRECTION; 2) PROCESSING OF ROCK, SCREENING & WASHING OF MATERIAL INCLUDING SAND; 3) THE CONTINUATION OF USE OF ALL STRUCTURES AND OTHER ANCILLARY FACILITIES; 4) PROPOSED WATER TREATMENT PLANT TO CLEAN & RECYCLE WATER; 5) PREVIOUSLY PERMITTED SITE ACCESS AND 6) ALL RELATED OPERATION INCLUDING BLASTING AND EXTRACTION WITH ALL ASSOCIATED SITE WORKS; AND 7) ANCILLARY AND ASSOCIATED DEVELOPMENTS; ALL AT THE PERMITTED/OPERATIONAL QUARRY (PREVIOUS REFS: 09/40336, 13/50841 & 07/51043). A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATIONDecision record indexed
(A) RELOCATION OF THE SAND AND WASH PLANT FROM CURRENT QUARRY FLOOR TO THE EXISTING COMPOUND LEVEL (PREVIOUS PA REG. REF. NOS. 20/50298 AND 23/51505 SCHEDULE B REFER), (B) DOWN-SIZING OF THE EXISTING PERMITTED ELECTRICAL CONTROL BUILDING, (C) REDUCTION OF GROUND LEVELS AT MAIN QUARRY ENTRANCE AND ACCESS ROAD, INCLUDING RELOCATION OF WHEEL WASH AND WEIGH BRIDGE, (D) DEMARCATION OF CAR PARKING SPACES AT MAIN ENTRANCE AND ACCESSIBLE PARKING SPACE PROVIDED CLOSE TO THE EXISTING OFFICE BUILDING AND (E) ALL ASSOCIATED AND RELATED SITE WORKS, OPERATIONS, ANCILLARY AND DEVELOPMENT ASSOCIATED WITH THE ABOVE PROPOSED WORKSDecision record indexed
ERECTION OF A ONE AND A HALF STOREY DWELLING HOUSE AND DOMESTIC GARAGE INCLUDING SEPTIC TANK, PERCOLATION AREA, ASSOCIATED SITE WORKS AND SERVICESGrounds not yet categorised
CONSTRUCTION OF A PART STOREY AND HALF, PART DORMER DETACHED DOMESTIC DWELLING, DOMESTIC DETACHED GARAGE WITH PROVISION OF A WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS TO BE ACCESSED VIA EXISTING LANEDecision record indexed
CONSTRUCTION OF AN EXTERNAL CLAD ENCLOSURE STRUCTURE TO COVER EXISTING STEEL STAIRS FIRE ESCAPE STAIRWAY TO REAR OF EXISTING MULTI-PURPOSE COMMUNITY CENTREDecision record indexed
CHANGE OF USE OF PART OF EXISTING COMMUNITY BUILDING TO PROVIDE PRESCHOOL AND CHILDCARE FACILITIES AND CONSTRUCTION OF A NEW OUTDOOR PLAY AREADecision record indexed
CRANFORD STONE QUARRY, DEVLINMORE, CRANFORD LETTERKENNY PO
(1) EXISTING COMPOUND (FORMER BATCHING PLANT COMPOUND), (2) OFFICE BUILDING INCLUDING CONNECTION OF THE WASTE WATER DISCHARGE TO EXISTING APPROVED SEPTIC TANK, (3) ELECTRICAL CONTROL BUILDING INCLUDING THE ATTACHED STORE ROOM AND LIGHT POLE, (D) POND, AND (E) ENTRANCE INTO THE COMPOUND AND PERMISSION FOR (1) THE CONTINUED USE OF EXISTING COMPOUND AS A COMPOUND / STORAGE YARD FOR THE ADJOINING CRANFORD STONE QUARRY, (2) STAFF CAR PARKING WITHIN THE EXISTING COMPOUND, AND (3) DECOMMISSIONING OF EXISTING ON-SITE METAL CONTAINERS CONTAINING THE CURRENT SITE OFFICE AND CANTEENDecision record indexed
(1) EXISTING TEMPORARY MOBILE HOME WITH ATTACHED DOMESTIC SHED, (2) EXISTING SEPTIC TANK WHICH WILL BE USED FOR THE PROPOSED NEW HOUSE AND INSTALLATION OF A PERCOLATION AREA AND (3) ALL EXISTING GROUND WORKS INCLUDING THE HARDSTAND AND VEHICULAR ENTRANCE AND PERMISSION FOR ERECTION OF A NEW DWELLING HOUSE WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
EXTENSION AND REFURBISHMENT OF EXISTING DWELLING HOUSE AND DECOMMISSIONING OF EXISTING SEPTIC TANK SYSTEM WITH NEW CONNECTION TO PUBLIC SEWERAGE SYSTEM, AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF EXISTING MICA DEFECTIVE BLOCK TWO STOREY DWELLING HOUSE, (2) CONSTRUCTION OF REPLACEMENT TWO STOREY DWELLING HOUSE WITH ATTIC BEDROOMS AND SANITARY FACILITIES AND (3) CONNECTION TO EXISTING FOUL SYSTEM AND PUBLIC MAINS PREVIOUSLY USED BY EXISTING HOUSE AND ALL ASSOCIATED SITE WORKSDecision record indexed