To construct a Dwelling House, Sewage Treatment System and Domestic Garage. Gross floor space of proposed works: H: 277 sqm, G: 60 sqmDecision record indexed
For the construction of a new private dwelling house, proprietary effluent treatment unit, percolation area and domestic garage along with all ancillary site worksDecision record indexed
For (a) ground floor extensions, first floor level conversion of attic area and minor elevation alterations to dwelling house, and (b) separate domestic garage and all associated services on site previously approved under 27693, 34889, 49301, 60063, 70818, 98/3168 and 02/4255. Gross floor space of proposed works: 55.78 sqm. Gross floor space of work to be retained: 122.27 sqmDecision record indexed
For the construction of a dwelling house, domestic garage, effluent treatment plant and all associated site services. Gross floor space of proposed works: 207 sqm (House) & 60 sqm (Garage)Decision record indexed
For the demolition of an existing feed storage shed and the construction of 2 no. loose animal houses and all associated works; Gross floor space of proposed works; 341sqm, Gross floor space of any demolition; 28sqmDecision record indexed
For the construction of a dwelling house, domestic garage, effluent treatment plant and all associated services. Gross floor space of proposed works: 144.2 sqm (House) & 60 sqm (Garage)Decision record indexed
To retain and complete existing dwelling and associated effluent treatment system on revised site boundaries from that granted under Pl. Ref: 99/5194 and for Permission to construct a domestic garage/shed. Gross floor space of proposed works: Garage 60 sqmDecision record indexed
For development consisting of (1) to construct a dwellinghouse and domestic garage/garden store. (2) New sewage treatment system and (3) all associated site works and services. Gross floor space of proposed works: House: 262 sqm, Garage: 60 sqmDecision record indexed
For change of house plans and garage from those previously approved under planning reference 23/61224 along with associated siteworksDecision record indexed
To replace existing conservatory with a new sun room and to create a en-suite overhead at the first floor level. Gross floor space of proposed works: 26 sqm. Gross floor space of any demolition: 12.96 sqmDecision record indexed
For the construction of: 1. dwelling house and garage, 2. installation of a treatment system and percolation area, 3. to fill the site using inert materials (soil and stone) and all associated site worksDecision record indexed
Rinn na hAirne, Rinnaharney Corrandulla, Co. Galway
Of the existing dwelling house, septic tank & percolation area and all ancillary site works, all on revised site boundaries (previous planning application reference number 6187 & 95/1079). Full planning permission to construct a first floor extension toward the northeast side of the existing dwelling house. Gross floor space of proposed works: 25.00 sqm. Gross floor space of work to be retained: 152.00 sqmDecision record indexed
For the construction of a serviced dwelling with effluent treatment system and a garage/shed. Gross floor space of proposed works, 235sqm + 50.76sqmDecision record indexed
To operate a reception/temporary storage and recovery yard for scrap metal, including end of life vehicles. The Class(es) of Activity at the site, as specified in Part 1 of the third Schedule of the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended) will be as follows; Class 4: The reception, storage and recovery of scrap metal, including scrap metal arising from end-of-life vehicles (other than end-of-life vehicles) and WEEE where scrap metal from - (a) end-of-life vehicles shall be subject to appropriate treatment an recovery in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (b) waste vehicles (other than end-of-life vehicles) shall be subject to appropriate treatment and recovery having regard to the provisions of articles 14 and 15 of the Waste Management (End-of-Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (c) WEEE shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 20, 21 and 22 of the Waste Management (Waste Electrical and Electronic Equipment) Regulations 2005 (S.I. No. 340 of 2005) prior to acceptance at the scrap metal facility. Class 12: The collection and storage (including the temporary storage) and the appropriate treatment and recovery of end-of-life vehicles in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006).Grounds not yet categorised
Of extension to the rear of the existing shed (granted under historical planning Ref No 57783) on a site with revision of boundaries from that previously granted under historical planning Ref No 33420. For provision of a new site entrance, new front boundary wall set back 3m from the existing road edge along the entire frontage of the additional site extension, to operate a reception/temporary storage and recovery yard for scrap metal, including end of life vehicles. The Class(es) of Activity at the site, as specified in Part 1 of the third schedule of the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended) will be as follows; Class 4: The reception, storage and recovery of scrap metal, including scrap metal arising from end-of-life veh2qAQicles (other than end -of-life vehicles) and WEEE where scrap metal from - (a) end-of-life vehicles shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 14 and 15 of the Waste Management (End-Of-Life Vehicles) Regulations 2006 (S.I No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (b) waste vehicles (other than end-of-life vehicles) shall be subject to appropriate treatment and recovery having regard to the provisions of articles 14 and 15 of the Waste Management (End-Of-Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (c) WEEE shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 20, 21 and 22 of the Waste Management (Waste Electrical and Electronic Equipment) Regulations 2005 (S.I. No. 340 of 2005) prior to acceptance at the scrap metal facility. Class 12: The collection and storage (including the temporary storage) and the appropriate treatment and recovery of end-of-life vehicles in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006). Treatment system / septic tank, percolation area and all ancillary site development works. Gross floor space of work to be retained: 78 sqmGrounds not yet categorised
For the construction of single dwelling house, domestic garage, proprietary effluent treatment system, percolation area and all associated site services. Gross floor space of proposed works: 239 sqm (dwelling) & 60 sqm (garage)Decision record indexed
To construct dwelling house, domestic garage, wastewater treatment system percolation area and all associated services. Gross floor space of proposed works: 248 sqm (house) & 50 sqm (garage)Decision record indexed
To construct a dwelling house, sewage treatment system and garage, together with all associated site works. Gross floor space of proposed works: House: 198sqm, Garage: 60sqmGrounds not yet categorised
To construct a dwelling house, sewage treatment system and garage, together with all associated site works. Gross floor space of proposed works: 198 sqm (house) & 60 sqm (garage)Grounds not yet categorised
To construct a dwelling house, sewage treatment system and garage, together with all associated site works. Gross floor space of proposed works: 198 sqm (house) & 60 sqm (garage)Grounds not yet categorised
Of a domestic garage, and to retain relocated entrance to dwelling house. Gross floor space of work to be retained: 97.4 sqm.Grounds not yet categorised
To erect dwelling house, domestic garage, wastewater treatment system, percolation area and all associated services. Gross floor area of proposed works: 243sqm (dwelling house) and 58.9sqm (domestic garage)Decision record indexed
To construct a dwelling house, domestic garage, effluent treatment system, percolation area and all associated works. Gross floor space of proposed works: 247.50 sqmDecision record indexed
To construct new dwelling house, domestic garage, wastewater treatment system and percolation area along with associated site works. Gross floor space of proposed works: 276 sqmDecision record indexed
To construct dwelling house, garage, treatment system and percolation area and associated services. Gross floor space of proposed works is; dwelling 199 sqm & garage 60 sqm.Decision record indexed
For the construction of a storey and a half, dormer bungalow dwelling house and detached garage, with a domestic wastewater treatment system, and all associated site services Incl connectionsDecision record indexed
To construct a dwelling house, sewage treatment system and garage, together with all associated site works. Gross floor space of proposed works: 218 sqm (house) & 60 sqm (garage)Decision record indexed
To construct a dwelling house and domestic garage with a waste water treatment plant, percolation area and all associated site works. Gross floor space of proposed works: House: 211 sqm, Garage: 60 sqm.Decision record indexed
To construct a rear split level two-storey extension to existing bungalow including the demolition of a single storey lean-to extension at the rear of the existing bungalow and complete all associated site works. Gross floor space of proposed works: 109.8 sqmDecision record indexed
To construct a dwelling house and domestic garage with a waste water treatment plant, percolation area and all associated site works. Gross floor space of proposed works: 221.5 msq & 60 msq.Decision record indexed
For the construction of a two-storey dwelling house, detached garage, entrance, boundary fence/wall, suitable on-site treatment system with polishing filter, and all ancillary site worksDecision record indexed
To construct a serviced dwelling with effluent treatment system and garage/shed. Gross floor space of proposed works: 274 sqm (house) & 60 sqm (garage)Decision record indexed
To erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services (previously approved under planning reg. ref. no. 24/61596)Decision record indexed
To erect dwelling house, domestic garage, wastewater treatment system, polishing filter and all associated services. Gross floor space of proposed works: 208.00 sqm(house), 59.40 sqm(garage)Decision record indexed
To construct a dwellinghouse, domestic garage/fuel store, septic tank, treatment system, percolation area & all ancillary site works. Gross floor space of proposed works 269.4 sqm (house) & 60 sqm (garage)Decision record indexed
To remodel and extend existing vacant old dwelling house, to construct a domestic garage, new effluent system, new percolation area and all associated works. Gross floor space of proposed works: 99 msq h & 60 msq GDecision record indexed
To construct a fully serviced private dwelling house waste water treatment system and private garage/store to include all associated site works. Gross floor space of proposed works: 164. 20 sqm (house) & 53.94 sqm (garage/fuel shed)Decision record indexed
To construct a dwellinghouse, domestic garage/fuel store, septic tank, treatment system & percolation area & all ancillary site works. Gross floor space of proposed works: 220 sqm (house) & 40 sqm (garage)Decision record indexed