  1. © OpenStreetMap
    20/4235Granted

    17 Ross Park Ballymacmoy Killavullen Co. Cork

    The completion of a partially constructed dwelling house as permitted under Planning Ref: N/98/2629 and extension of duration of planning - Planning Ref. No. 04/6556.Decision record indexed
    Decision03 September 2020View record
  2. © OpenStreetMap
    24/4243Granted

    Spa Glen Mallow Co.Cork

    Permission for following Large Scale Residential Development (LRD) comprising the demolition of the existing farmhouse/buildings and the construction of 186 no. residential units, 1 no creche and all associated ancillary development works including the signalisation of the N72/L5331 junction to provide improved sightline visibility, amendments to part of the existing hedgerow along the N72 to improve sightline visibility, 2 no. vehicular access points, 1 no. toucan and 3 no. uncontrolled pedestrian and cycle crossing points on the L5331, footpaths, parking, drainage, landscaping/amenity areas and the undergrounding of existing 38KV overhead electricity lines. A Natura Impact Statement is submitted to the planning authority with this application.Decision record indexed
    Decision19 July 2024View record
  3. © OpenStreetMap
    23/5197Granted

    "Clonmore" Ballyviniter Lower Mallow Co.Cork

    1) the construction of 108 no. dwelling houses, consisting of 3 no. 4 bed detached, 2 no. 3 bed detached, 68 no. 4 bed semi-detached, 32 no. 3 bed semi-detached and 3no. 3 bed terraced houses. These houses area to be assessed through the existing completed part of the housing development; 2) A crèche of 380 sqm of single/two storey construction, also accessed from the existing completed part of the housing development, including 11 carparking spaces and associated works; 3) the provision of a 1.2m diameter culvert within this development. This leads to an open water course which is to be provided in lieu of the existing pipeworks along the western boundary of the site; 4) all associated site development works. Extension of Duration to Permission granted under Planning Ref. No. 16/6949, ABP-301221-18Decision record indexed
    Decision08 August 2023View record
  4. © OpenStreetMap
    23/4342Refused

    Toureen North Burnfort, Mallow Co.Cork

    For construction dormer dwelling house, domestic garage, new vehicular entrance, provision of a wastewater treatment system and all associated site worksGrounds not yet categorised
    Decision24 April 2023View record
  5. © OpenStreetMap
    23/5805Granted

    Ballyvinter Lower Mallow Co. Cork

    Permission for 1- Construction of a new single storey extension to the side (South Facing) elevation of the existing dwelling. 2- Construction of a new single storey extension to the rear (West Facing) elevation of the existing dwelling. 3- The relocation of the existing garden storage shed to facilitate the proposed side extension. 4- All ancillary site works.Decision record indexed
    Decision01 November 2023View record
  6. © OpenStreetMap
    22/4372Granted

    Scoil Íosagáin Infant School Spa Glen Mallow Co.Cork

    Permission for construction of a two storey extension for the delivery of Special Needs Education on grounds of the existing Scoil Iosagain Infant school, construction of a single storey extension for circulation link to connect the new accommodation to the existing school, permission for new external play area, sensory garden and all associated site works.Decision record indexed
    Decision15 August 2022View record
  7. © OpenStreetMap
    22/4373Refused

    Ballymacmoy Killavullen Co. Cork

    Construction of 23 no. residential units (12 no. 3 Bed Semi-Detached dwellings, 8 no. 4 Bed Semi-Detached dwellings and 3 no. 2 Bed Terraced dwellings), associated car parking, landscaping, amenity and local play areas, foul and storm water drainage, including attenuation, new vehicular entrance and all associated site, boundary treatment, and development works. A Natura Impact Statement will be submitted to the Planning Authority with the applicationGrounds not yet categorised
    Decision11 August 2022View record
  8. © OpenStreetMap
    20/5711Granted

    Bridhaven Nursing Home Spa Glen Mallow Co. Cork

    Retention of modifications to the existing nursing home including alterations to the permitted site layout plan, changes to the permitted design and all ancillary site development works. 1. The changes in design consist of: (a) a ground floor boiler room extension with rooftop plant, (b) 2 no. first floor extensions, and (c) elevations changes including (i) modifications to the permitted entrance including a lift core and roof lights, (ii) changes to windows and doors at lower ground floor level, (iii) changes to the eastern and southern elevations. 2. Alterations to the permitted site layout include: 1 no. gas tank cage, 1 no. ESB kiosk, 1 no. water tank, 1 no. underground fire water tank, 1 no. boiler house, 1 no. plant building/store, 1 no. shed.Decision record indexed
    Decision05 October 2020View record
  9. © OpenStreetMap
    22/5956Granted

    Barrinclay Mourneabbey Co. Cork

    Construction of an agricultural shed comprising of cubicles, feeding area with underground slatted slurry storage tanks in place of existing silage pit and construction of a new silage pit and all associated siteworks.Decision record indexed
    Decision21 November 2022View record
  10. © OpenStreetMap
    20/5951Granted

    No. 36 Beechwood Park Spaglen Mallow Co. Cork

    The widening and reconstruction of vehicular entrance and driveway to existing dwellinghouse and all associated site works.Decision record indexed
    Decision27 October 2020View record
  11. © OpenStreetMap
    20/6954Granted

    Caranora House Rock Road Mallow Co. Cork

    (A) Demolish existing single storey annex (B) Refurbish existing dwelling (C) Construct a two storey extension to existing dwelling (D) Construct a new storage shed and (E) All ancillary site works.Decision record indexed
    Decision20 April 2021View record
  12. © OpenStreetMap
    24/5483Granted

    The Mallow South Town Centre Development, (under construction), bounded by West End & Park Road, Annabella, Mallow, Co. Cork.

    Permission for the construction of a single storey retail warehouse (unit 3) to the immediate east of retail unit 2 permitted under application reference 20/4925; roller shutter door to the rear elevation; signage; rooftop plant; extension to the delivery yard area permitted under application register reference 20/4925; and all associated site development and drainage works on a site that forms part of the Mallow South Town Centre Development (under construction). The proposed development will modify condition no. 2, which omitted the proposed retail units 3 and 4, attached to application reference 20/4925. The proposed modified condition no. 2, will exclude the omission of retail unit no. 3. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.Decision record indexed
    Decision04 July 2025View record
  13. © OpenStreetMap
    19/6689Refused

    Saint Jude 53 Beechwood Park Spaglen Mallow, Co. Cork

    A) The construction of a granny flat ancillary to the main residence b) the demolition of existing boundary wall to the north and east boundaries and the construction of a new two metre high boundary wall to the north and east boundaries c) all associated ancillary site works.Grounds not yet categorised
    Decision15 January 2020View record
  14. © OpenStreetMap
    26/0299Granted

    West End And Park Road, Annabella, Mallow, Co.Cork

    Permission for Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. Extension of Duration to Permission granted under Planning Ref. No. 20/4925Decision record indexed
    Decision07 April 2026View record
  15. © OpenStreetMap
    20/4925Granted

    West End and Park Road Annabella Mallow Co. Cork

    Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.Decision record indexed
    Decision26 July 2021View record
  16. © OpenStreetMap
    20/5063Granted

    West End Road and Park Road (N72) Annabella Mallow Co. Cork

    Development comprising the construction of a new Licenced Discount Foodstore with ancillary infrastructure and associated site development works (all totalling 2,254.4 sq m Gross Floor Area and ranging in height equivalent from 1 to 2 storeys), at a site of approximately 1.476 hectares. The construction of the proposed Licenced Discount Foodstore (2,215 sq m gross floor area) comprises of: A retail sales area with ancillary off-licence use and bakery (total Net Retail Sales Area of 1,420 sq m), entrance pod, public facilities (incl. lobby and toilets), staff facilities (incl. lobbies, operations office, meeting room, canteen, locker room, showers and toilets), storage (incl. cold storage), IT room, plant room, and delivery area; Rooftop photovoltaic solar panel array extending to a maximum of 907.5 sqm; Corporate signage consisting of 4 no. building mounted corporate internally illuminated signs, 1 no. free standing internally illuminated flagpole sign at the site entrance from Park Road, and 1 no. free standing externally illuminated poster display boards; 1 no. covered trolley bay structure (39.4 sq m Gross Floor Area); Surface car park providing a total of 127 no. car parking spaces (4 no. disabled, 12 no. parent and child, 12 no. EV charging spaces and 101 no. regular) and 14 no. motorcycle parking spaces and 16 no. bicycle parking spaces; Primary vehicular and pedestrian access to the proposed Licenced Discount Foodstore will be provided via an existing site entrance (serving the Dairygold Co-Op Superstore) onto Park Road (N72), which is to be enhanced as part of the proposed development; Pedestrian access will be provided via a new plaza area along the northern boundary of the site with West End Road; and Boundary treatments, hard and soft landscaping, services (including 2 no. below ground attenuation tank) and all other ancillary and associated site development works above and below ground level. This Planning Application will be accompanied by a Natura Impact Statement.Decision record indexed
    Decision03 August 2021View record
  17. © OpenStreetMap
    24/5478Granted

    Annabella, West End & Park Road (N72), Mallow, Co. Cork.

    Permission for development at this site of approximately 0.0352 hectares located at the permitted pharmacy and office units (totalling 317.3 sq.m gross floor space) of the newly constructed Lidl licensed discount foodstore (granted permission under Cork County Council Planning Reg. Ref. No.: 20/05063). The proposed development consists of the change of use of the constructed pharmacy unit (173.8 sq.m) to shop as defined by Article 5(1) of the Planning and Development Regulations 2001(as amended); the change of use of the constructed office unit (139.7 sq.m) to shop as defined by Article 5(1) of the Planning and Development Regulations 2001 (as amended); and associated signage (totalling 6.12 sq.m).Decision record indexed
    Decision26 September 2024View record
  18. © OpenStreetMap
    21/6750Granted

    Ballyviniter Lower Mallow Co. Cork

    The construction of a proposed single storey extension to the rear of the existing dwelling, material alterations to the existing side elevation, new rooflights on the existing rear roof and all associated site works.Decision record indexed
    Decision01 December 2021View record
  19. © OpenStreetMap
    20/5200Granted

    Rock Road Mallow Co. Cork

    To construct a dwelling and carry out all associated site works including a new site entrance and boundary walls.Decision record indexed
    Decision31 July 2020View record
  20. © OpenStreetMap
    24/4713Granted

    Annabella Mallow Co Cork

    Permission for the construction of a new Biomass Plant for the generation of steam as part of the decarbonisation road map for the business. The development will consist of the construction of a single storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height of 27.292m above ground level, the construction of an extension to the existing pipe bridge, new internal access road and yard to facilitate vehicle movements and associated site works. The application relates to an establishment which has an Industrial Emissions Licence, Ref.No. P0403-03. A Natura Impact Statement (NIS) will accompany the application.Decision record indexed
    Decision18 February 2025View record
  21. © OpenStreetMap
    22/6867Granted

    Ballyviniter Lower Mallow Co. Cork

    Permission for retention for conservatory to side of existing dwelling as constructed on site. Permission is also sought for a new extension to side of the existing dwelling and extension and alterations to existing detached domestic garage on site and all associated site works.Decision record indexed
    Decision17 April 2023View record
  22. © OpenStreetMap
    25/5629Granted

    Co-Op Store West End and Park Road Annabella Mallow, Co. Cork

    Permission for the construction of an ancillary bulk storage building and all associated site development works (change of elevational treatment of the southern and western elevations of the ancillary bulk storage building previously permitted under application register reference 20/4925) on a site to the south of, and attached to, the Co-Op store at West End and Park Road, Annabella, Mallow, Co. Cork.Decision record indexed
    Decision06 October 2025View record
  23. © OpenStreetMap
    23/5095Granted

    Tooreen North Burnfort Mallow Co. Cork

    Retention for as built agricultural yard including agricultural machinery store and workshop, pump house, washer house, existing yard and entrance as built, also as built domestic garage and store and all associated site worksDecision record indexed
    Decision21 July 2023View record
  24. © OpenStreetMap
    25/4689Granted

    'Sun-Villa' Spaglen Mallow Co. Cork.

    Permission to demolish the existing attached garage and rear extension, for alteration and extension to the existing dwelling house, alteration of the existing entrance and all associated site works.Decision record indexed
    Decision06 June 2025View record
  25. © OpenStreetMap
    25/6675Granted

    Sun-Villa, Spa Glen, Mallow, Co. Cork. P51 NV3P.

    Permission to demolish the existing attached garage and rear extension and for alteration and extension to the existing dwelling house (change of plan from that permitted under planning reg. 25/4689), alteration of the existing entrance and all associated site works.Decision record indexed
    Decision05 February 2026View record
  26. © OpenStreetMap
    23/5077Granted

    West End & Park Road Annabella, Castlelands Mallow Co.Cork

    Alterations to Co-op store and café permitted, not yet constructed, under application register reference 20/4925, which will comprise: 1) the construction of a first floor internal mezzanine to the Co-op store to accommodate a staff area (offices, staff canteen and welfare facilities); 2) the construction of a first floor bulk store mezzanine to accommodate an additional bulk storage area; 3) all ancillary works including internal stairs and a lift; and 4) the construction of a ground floor extension to the café and associated extended external canopyDecision record indexed
    Decision31 August 2023View record
  27. © OpenStreetMap
    22/4911Granted

    O'Mahony's Centra Spa Glen Mallow Co.Cork

    Permission to (1) install rooftop photovoltaic solar panel arrays consisting of approximately 364 Sqm of solar panels and associated fall arrest system fixed to the Western and Eastern roof slopes of existing main building and (2) carry out elevational changes to the front (Southern) façade of the existing main building. All of these works are proposed at O'Mahonys CentraDecision record indexed
    Decision14 June 2022View record
  28. © OpenStreetMap
    20/6143Granted

    O'Mahony's Centra Spa Glen Mallow Co. Cork

    (1) Retention of 1 no. fuel pump including ancillary signage, (2) retention of 1 no. electric vehicle charge point including ancillary signage and (3) permission to relocate said 1 no. electric vehicle charge point including ancillary signage.Decision record indexed
    Decision24 November 2020View record
  29. © OpenStreetMap
    20/4178Granted

    O'Mahony's Centra Spa Glen Mallow Co. Cork

    (1) Extend the existing hard standing area, (2) construct 1 no. rollover car wash and 1 no. jet car wash, (3) install 2 no. sheds (29 Sqm) containing plant associated with the car wash operations, (4) provide 3 no. additional car parking spaces, (5) provide new boundary treatments to northern and eastern site boundaries, (6) install new light pole and (7) carry out all associated site works.Decision record indexed
    Decision27 October 2020View record
  30. © OpenStreetMap
    24/6169Granted

    St. Anthony's 41 Spa Glen Mallow Co.Cork

    Permission for the demolition of an existing front garden wall and entrance gateway and the erection of a new front garden wall with a repositioned entrance gateway and all associated site worksDecision record indexed
    Decision16 January 2025View record
  31. © OpenStreetMap
    25/4564Granted

    28 Clonmore Ballyviniter Lower, Ballyviniter Mallow Co.Cork

    Permission for the construction of a single storey extension to the side of existing dwelling, minor alteration to existing front elevation and all associated site worksDecision record indexed
    Decision23 May 2025View record
  32. © OpenStreetMap
    21/7004Refused

    Mountnagle Mallow Co. Cork

    The construction of a new rugby sports grounds consisting of (1) three full size playing pitches with floodlighting, (2) one smaller sized training pitch with floodlighting, (3) clubhouse, (4) car park and access roads with public lighting, (5) surround walkway with lighting, (6) private on-site waste water treatment system, (7) storm water soak-pits, (8) entrance, (9) terraced viewing areas, (10) ball-stop netting and (11) all associated site works.Grounds not yet categorised
    Decision10 January 2022View record
  33. © OpenStreetMap
    22/5737Granted

    Hazel Brooke Spa Glen Mallow Co. Cork

    Installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new natural gas District Regulating Installation including a 3m high ‘lamp post’ style relief vent stack with all ancillary services and associated site works to alter the network pressure.Decision record indexed
    Decision19 October 2022View record
  34. © OpenStreetMap
    22/6814Granted

    O'Mahony's Centra Spa Glen, Spaglen Td. Mallow Co.Cork

    Permission for retention of (1) an existing refuse shed (25.3 sqm), (2) Electric vehicle charge point cabinet, (3) above ground 1600 litre LPG tank with associated works. Permission is also sought for (1) an AD BLUE fuel pump cabinet and ancillary 5000 litre above ground AD BLUE tank, (2) the construction of 2.5m high hit and miss fencing to screen existing 2 no. sheds and refuse shed and (3) the removal of condition no.3 attached to planning ref no. 20/4178, which called for the removal of the two sheds, (29 sqm) containing plant associated with the car wash operations on the expiration of the period of 3 no. years beginning on date of the grant of this permission, to allow for the 2 no. sheds to remain on site.Decision record indexed
    Decision23 August 2023View record
  35. © OpenStreetMap
    25/5765Granted

    The Old Course Spaglen Mallow Co. Cork

    Permission for the construction of 28 no. dwelling houses at The Old Course, Spaglen, Mallow, Co. Cork. The application is for a change of plan to part of development containing units 43-58 and 65-76 previously permitted under Plg. Reg No. 22/4676. The changes include: A) Estate road serving the south-eastern portion of the development moved north and road levels updated due to site topography constraints. B) Updated FFL’s for houses 43-46 and 69-76, C) Updated FFL’s, house positioning and elevational treatments for houses 47-58. D) Alterations to rear garden dimensions for houses 47-58 and 65-76 to accommodate new proposed estate road position. The Car parking allocation, landscaping, boundary treatments, and all ancillary site development works remain as per previously permitted Plg. Reg No.22/4676.Decision record indexed
    Decision27 November 2025View record
  36. © OpenStreetMap
    23/4303Granted

    26 Eglantine Crescent Quartertown Mallow Co.Cork

    Permission for Retention of 2 No. Domestic 'Timber Garden Sheds', an 'Enclosed Domestic Storage Area', a 'Covered Garden Area', an 'Existing Dining Room Extension' an 'Attic Storage Area', modifications to roof design previously permitted under Planning Reference PD2493(formerly Mallow Town Council) and 1 No. additional rooflight on the eastern elevation of the existing roofDecision record indexed
    Decision19 May 2023View record
  37. © OpenStreetMap
    23/6340Granted

    No.7 Eglantine Drive Quartertown Lower Mallow Co.Cork

    Permission for retention of minor alterations to existing granny flat extension permitted under planning reference number 22/4364 consisting of the following alterations: 1) retention of the additional floor area provided to the rear single storey extension between the previously permitted living room and the existing rear sunroom, 2) retention of change of roof type to the rear single storey extension from a permitted pitched roof to a flat roof and all associated site worksDecision record indexed
    Decision25 January 2024View record
  38. © OpenStreetMap
    22/4364Granted

    No.7 Eglantine Drive Quartertown Lower Mallow Co.Cork

    Permission to construct a two storey extension to the side of existing dwelling for use as a granny flat and all associated site worksDecision record indexed
    Decision28 June 2022View record
  39. © OpenStreetMap
    25/4831Refused

    Clonmore Ballyviniter Lower Mallow Co.Cork

    Permission for the construction of 3 no. 2 storey detached dwelling house to replace 1 no. creche permitted under reg ref. 16/6949 and extended under reg ref 23/5197 and including all associated site worksGrounds not yet categorised
    Decision26 June 2025View record
  40. © OpenStreetMap
    22/4676Granted

    Old Course Spaglen Mallow Co.Cork

    The construction of a residential development of 96 no. dwelling units and all associated site development works. The proposed development consists of the construction of 24 no. 4-bed semi-detached houses, 30 no. 3-bed semi-detached houses, 16 no. 3-bed townhouses, 14 no. 2-bedtownhouses and 6 no. 2-bed duplex units, 4 no. 2-bed apartment units and 2 no. 1-bed apartments units contained in 3 no. 3 storey apartment blocks. Vehicular access to the proposed development will be via the existing entrance from the L-1207. The proposed development also includes open space, landscaping, bicycle parking facilities, bin stores, public lighting and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority.Decision record indexed
    Decision10 November 2022View record
  41. © OpenStreetMap
    19/6344Refused

    Old Course Spaglen Mallow Co. Cork

    The construction of a residential development of 95 no. dwelling units and all associated site development works. The proposed development consists of the construction of 32 no. 4-bed semi-detached houses, 36 no. 3-bed semi-detached houses, 8 no. 3-bed townhouses, 7 no. 2-bed townhouses and 6 no. 2-bed duplex units, 4 no. 2-bed apartment units and 2 no. 1-bed apartment units contained in 3 no. 3 storey apartment blocks. Vehicular access to the proposed development will be via the existing entrance from the L-1207 and provision will be made for a pedestrian link with the River Valley housing estate (as previously permitted under Cork County Council Planning Reference 045426). The proposed development also includes open space, landscaping, bicycle parking facilities, bin stores, public lighting and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with this application.Grounds not yet categorised
    Decision20 April 2020View record
  42. © OpenStreetMap
    20/6459Granted

    5 Cairn Woods Ballyviniter Lower Mallow Co. Cork

    Construction of a single storey extension to existing dwelling, along with associated site works.Decision record indexed
    Decision08 January 2021View record
  43. © OpenStreetMap
    21/5876Granted

    6 Lacknalooha Lackanalooha,Mallow Co. Cork

    Demolition of existing garage and single storey shed and construction of a single storey extension to the rear and side of the existing dwelling house, replacement of windows, widening of front gate access, a new garden shed and all ancillary works.Decision record indexed
    Decision24 August 2021View record
  44. © OpenStreetMap
    22/5012Granted

    Tooreen North Burnfort Mallow Co.Cork

    Permission to construct a bungalow, domestic detached garage, installation of waste water treatment unit and associated site works.Decision record indexed
    Decision03 October 2022View record
  45. © OpenStreetMap
    23/5186Granted

    Carrigpark Mallow Co. Cork

    The construction of a livestock underpass, an effluent holding tank and all associated site works.Decision record indexed
    Decision09 April 2024View record
  46. © OpenStreetMap
    21/5573Granted

    Mallow Business and Technology Park Quartertown Lower Mallow Co. Cork

    Install a rooftop photovoltaic solar panel array consisting of approximately 280 square meters of solar panels on the eastern roof slope and approximately 808 square meters of solar panels on the western roof slope of the existing building.Decision record indexed
    Decision16 July 2021View record
  47. © OpenStreetMap
    19/6927Granted

    6 Clonmore Ballyviniter Mallow Co. Cork

    To construct a new single storey extension to existing dwelling house and all ancillary site works.Decision record indexed
    Decision05 February 2020View record
  48. © OpenStreetMap
    25/4336Granted

    51 Beecher Street Lackanalooha Mallow Co. Cork

    Permission for Retention of change of use of the existing attic space to habitable use, Permission for Retention of the partially constructed extension to the rear of the existing dwelling house and permission to complete same extension and alterations to the existing dwelling house and all associated site and ancillary works.Decision record indexed
    Decision24 April 2025View record
  49. © OpenStreetMap
    23/5695Granted

    51 Beecher Street Lackanalooha Mallow Co.Cork

    Permission for demolition of a single storey building at the rear of the existing dwelling house and construction of a new single storey extension to rear of the existing dwelling, to install 3 number roof windows on the rear elevation of the existing roof with alterations and all associated site and ancillary worksDecision record indexed
    Decision01 December 2023View record
  50. © OpenStreetMap
    24/6166Granted

    Tooreen North Burnfort Mallow Co.Cork

    Permission for construction of a dwelling and detached domestic garage, installation of a septic tank and percolation area and carrying out of all associated site worksDecision record indexed
    Decision14 March 2025View record