For construction of a single storey extension to the rear of existing school comprising classroom accommodation, sensory garden and play area, revised parking, landscaping, drainage, revised astro surfacing, hurling wall and related works to existing school
To demolish an existing dormer style dwelling constructed with defective concrete blocks, and to construct a replacement storey and a half style dwelling on the original dwelling footprint, with all associated site works
For (1) Retention permission for the change of use from an existing licensed store to a multi-purpose room associated with the existing bar and restaurant areas, including minor changes to elevations (2) PERMISSION for development which will consist of the following (a) A stretch tent sound absorbent fabric covering, as weather protection between the existing kitchen and toilet areas and the multi-purpose room. (b) Signage associated with the multi-purpose room. (c) A ten-year permission for a temporary car park to serve the existing bar, restaurant and multi-purpose room. (d) Ancillary site works
For development consisting of the following: (a) The demolition of part of the existing bar/restaurant toilets, including store and boiler house (b) The change of use of the existing living room to a restaurant area linked to the existing kitchen area, previously used by the existing bar/restaurant (c) The construction of new toilets, including wheelchair accessible toilet, store and ancillary areas, incorporating part of the existing toilet area, to serve the existing refurbished bar area (d) The construction of new toilets including wheelchair accessible toilet and ancillary areas to serve the new restaurant area (e) The provision of new boundary wall and fencing to part of the site curtilage (f) The provision of new roof lights over the existing bar/restaurant area (g) Changes to all building elevations and (h) Associated signage and ancillary site works.
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
To construct a dwelling house and garage, with wastewater treatment system of mechanical aeration system and polishing filter, and associated ancillary site works
Of the following (a) the existing Covid structure as covered external shelter and play area and (b) the use of the ground floor of existing house as a creche/montessori and removal of condition 3 of granted Planning Permission P04/626
Of the following works, (A) The use of the ground floor of the existing dwelling as a childcare / Montessori Centre, (B) The erection of a steel structure for use as a shade / covered play area, and (C) The erection of a steel shed for use as a store, all with associated site works
For a) To construct 8 No. semi-detached dwelling houses (16 houses in total) b) To amend access road and ancillary services permitted under planning ref P16/630 c) To provide temporary access road from public only in order to prevent machinery and builder providers accessing the site via the existing Maigh Dara housing estate
To construct an additional three no. dwelling houses within the existing development currently under construction, previously authorised under planning permissions ref no’s P22/1039 and P24/60359, along with all associated site works and services
To construct an additional two no. dwelling houses within the existing development, previously authorised under planning permissions ref no’s P22/1039, P24/60359 and P25/60299 along with all associated site works and services
To make alterations to the development previously authorised under planning permission ref no. P22/1039, to include: (a) minor amendments to the house positions on site; (b) amendments to the house floor plans and layouts; (c) amendments to fenestration and elevational treatments of dwellings; and (d) all associated site works and services
To change the site boundaries as granted under P99-780, demolish 2 existing on-site sheds, and to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
Will consist of the following: The installation of a new window in the living room on the ground floor. The window will be located on the south east elevation of the dwelling.
To erect a 24m high lattice telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing
To retain existing portacabin (granted planning under reference number P21/471) which is being used as a pre-school Building on site
To RETAIN existing portacabin (granted planning under reference number P16/227 which is being used as a pre-school building
To construct an agricultural storage barn including all ancillary site works and services
To (a) Construct extensions to front and rear of existing dwellinghouse, (b) Reconstruct existing conservatory (c) Carry out fenestration changes together with all associated site development works and services
To construct a dwelling house, garage, waste water treatment system, upgrade existing entrance/exit and all ancillary works
The development will consist of a dwelling house with proprietary wastewater treatment system & polishing filter together with ancillary site works
To construct a new dwelling house, site entrance, wastewater treatment system and all other associated site works
To construct a steel shed and all associated site works
The development will consist of alterations and an extension to the existing dwelling house, including the use of the existing foundations granted under Planning Ref. 19-201, all ancillary site works
The development will consist of the construction of a 64 square meter single storey freestanding music/exercise space and study to the rear of the existing dwelling house with alterations to site works and services
For the construction of a detached single storey garage with single storey granny flat appended, connection to existing wastewater treatment system and percolation area, and all ancillary site and landscaping works
For the construction of a domestic garage to the rear of the existing dwelling including ancillary site works
For a one storey dwelling house and garage with wastewater treatment system and polishing filter and associated site works
For the construction of a single storey extension to side of existing school building comprising of classroom accommodation together with additional parking, minor landscaping, drainage, plant and related works
To construct a new dwelling house with attached carport and private garage, site entrance, access road, on-site wastewater treatment system and all other associated site works
To construct a detached garage to rear of existing dwelling house, with all associated site works
To construct a single storey extension to the rear of the existing dwelling house and to install new effluent treatment system with all associated site works
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works
For (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.
For development which will consist of the construction of a dwelling house, garage, ancillary site works and connection to public services
To RETAIN increased number of children enrolled at MaryK's Childcare, Preschool and Montessori facility. This application is necessary to facilitate significant changes in childcare including the addition of education, inclusion and access to the childcare model system since planning PERMISSION was previously granted, including hours of operation and all associated works
(a) to RETAIN minor internal layout changes and minor elevational changes to existing as built building, including existing as built site works adjustments (b) To RETAIN existing detached prefabricated multipurpose room and prefabricated storage shed including all associated site works/services
For the following works, (a) Modify the internal layout and make changes to the elevations of both the existing dwelling and granny flat. (b) Construct extension to rear and porch to front of dwelling, and (c) Construct extension to side of granny flat, all with associated site works
To erect signage to logistics (warehouse and distribution) building
To construct logistics (warehouse and distribution) building with photo-voltaic arrays on the roof with supporting offices, signage, flag poles, HGV, car and cycle-parking, service yard, new vehicular entrance/exit, connection to existing estate sewers, ESB sub-station, landscaping, boundary treatment and all ancillary site works necessary to facilitate the proposed development
For the construction of a dwelling house with garage, ancillary site works and connection to public services
For development at this site in the townlands of Clonloghan and Caherteige, Co. Clare. The proposed development consists of an amendment to Condition No. 4 of the previously approved parent planning permission (Planning Ref. 18585), which relates to the operational life of the development. The proposed amendment seeks to extend the operational life of the permitted development from 25 years to 37 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
To construct an extension to existing dwelling to comprise of kitchen / dining / livingroom and utility including the refurbishment and modification of existing dwelling and permission to demolish existing extension to west of dwelling including all associated site development works
For the proposed installation of solar panels on a steel frame structure to be erected over the roof of an existing telecommunication cabin (covering an area of approximately 48 sq.m to a maximum height of 4.8 metres above ground level). To include all ancillary development works and landscaping to the southwest of the telecommunications compound
To extend the existing 30 metre high, free standing lattice communication structure by an additional 3 metres in height to allow for additional antennae, dishes and all ancillary equipment at ESB Telecoms Ltd Telecommunications Compound at ESB Drumline 110kV Substation
Permission for the following changes which are at variance with the grant of planning permission 18-851 (a) Changes to roof structure to the north and west elevations of the dwelling (b) Changes to window fenestrations on all elevations (c) Change to stone surround on the east elevation (d) Omission of wall recess on south elevation (e) Revised site entrance location (f) Change to boundary fence on the western boundary 2. PERMISSION for development which will consist of the completion of the site entrance, wing walls and piers
To Extend the Appropriate Period of Planning Permission P11-447 to construct dwelling house, garage, entrance, effluent treatment system including all associated site works and services
Proposes to carry out the following development. The development consists of a flood defence protecting three properties in Quin Co Clare. The defence consists of two sections of earthen embankment and a reinforced concrete wall. The reinforced concrete wall section is approximately 120m long, with a maximum height of 2.2m. To the south a 2m high embankment extends approximately 80m to higher ground. To the north a less than 1m high embankment extends approximately 20m to highter ground. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project and has determinined that a full Appropriate Assessment is not required in respect of the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of signigicant effects on the environment arising from the proposed development.
For an external plant compound enclosed with a security fence to include Air Conditioning Units with condensers and dedicated outdoor air system on existing roof plant area, Chillers, Thermal Storage Tanks, Pump house, Generators, Transformers, and all ancillary site works
To retain air handling unit located to rear of building and 2 no. chiller units with shed located to side of building; and planning PERMISSION for generator located to rear of building, 5 no. chiller units with new shed to side of building, high level louvre panels to existing building and all ancillary site works