For the construction of an extension to existing dwelling house to comprise of Sunroom including ancillary site works
For the following: a) to construct a new multi-purpose community building b) to install a playground, sensory garden, landscaped areas and gravel walking paths with low level bollard lights. c) to construct a new site entrance, footpath, car parking area, community signage and public lighting d) to link in with new pedestrian crossing on public road. e) to install an effluent folding tank along with ancillary site works
Of alterations consisting of ground and first floor extension to dwellinghouse and private garage, as constructed, with existing connections to public sewer and water
To renovate an existing cottage and construct an extension to the rear along with an effluent treatment system and associated site works
To change layout and design of dwelling house approved under planning permission Ref: P23-612 together with all changes to approved associated site development works and services
To construct a private dwelling house, wastewater treatment system along with all associated ancillary site works
Of alterations from previously granted Planning Ref: 02/1810, including relocation of the site entrance and alterations to the ancillary entrance walls, pillars and gates and alterations to the front elevation of the dwelling, along with all associated site works and services
Of the construction of a garage building larger than that granted under existing permission P01-682, the construction of an extension to the side of the garage, and the change of use of the garage to use as a granny flat, associated with the on-site dwelling, all with associated site works
For a change of house design granted planning permission under Planning Reference No. P21/217
To construct a single dwelling house, connection to public services and ancillary site works
For development to extend existing livestock slatted unit with associated ancillary siteworks
For the construction of a single storey extension to the side, rear and front of an existing dormer bungalow and the construction of a new domestic garage
For the construction of a dwelling house and garage with effluent treatment system, using the existing farm entrance as a means of access, and all associated site works
To construct a dwelling house and domestic garage including all associated site development works and services
To construct a new dwelling house, private garage, site entrance and wastewater treatment system along with all associated site works
To build a new dwelling, install a wastewater treatment system & all other associated site and ancillary works
To construct two detached dwelling houses, wastewater pumping station, new boundary walls and entrances and all associated services
To construct a new dwelling house, site entrance, wastewater treatment system and all associated site works
On the Grant of Outline Permission Reference Number P23-60003 to construct a single dwelling house, attached garage and the advanced wastewater treatment system, along with ancillary site works
To Extend the Appropriate Period of Planning Permission for P15/766 to construct a dwelling house, detached garage, waste water treatment system and soil polishing filter with associated site works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
For development in the townland of Formoyle Eighteragh (West), Inagh, Co. Clare. The development will consist of the construction of a 36m high lattice support structure carrying antennas and dishes together with associated ground-based equipment all enclosed in security fencing.
To carry out the following development: The proposed development will include: 1) Construction of Mini Roundabout at the junction of the N85 and the L4601 Shanaway Road. 2) 2 No. raised controlled pedestrian crossings on the N85 with central Islands. 3) 1 No. uncontrolled pedestrian crossing on the L4601 Shanaway Road. 4) Installation of additional public lighting columns and associated ancillary works to tie into existing public lighting system. 5) Installation of new gullies, tapping into existing surface drainage system. 6) Provision of associated Signage and Road Markings. 7) All associated and ancillary site works. In accordance with the Birds and Natural Habitats Directive, Screening for Appropriate Assessment has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.
For a single storey, four-bedroom dwelling, with new entrance, driveway, garage, boundary walls, wastewater treatment system with associated site works
To RETAIN existing single storey storage building (c. 52 sq.m) and PERMISSION for (i) construction of a single storey extension to the rear of the existing convenience shop building (c. 95 sq.m) including provision of drive thru coffee window, (ii) relocation of existing carwashing facility and provision of automatic brush wash, (iii) construction of brush wash control room (c. 8 sq.m), (iv) alterations to existing carparking layout, site services, landscaping, connection to public services and associated works
To construct dwelling house, garage, treatment system, create new entrance to public road and carry out ancillary site works
Of a) site boundaries b) position of house, septic tank and percolation area, c) attic conversion and installation of additional windows d) side entrance and ancillary accommodation as constructed together with all associated site development works and services
For development, the development consists of the construction of a slatted unit and associated site works
To construct a dwelling house, garage and a waste water treatment system and percolation area
Proposes to carry out the following development at Claureen, Ennis, Co Clare under the Local Infrastructure Housing Activation Fund (LIHAF). The proposed development is to provide for a link road between the existing N85 roundabout and the junctions of Lees Road (L4180)/Drumcliffe Road (L4599)&(L4182)/ Drehidnagower Road (L4587) and includes for the following works: 1) Link road and associated cycle paths and footpaths 2) The creation of new junction/roundabout and improvements on the Lees Road/ Drumcliffe Road Junction; 3) The creation of new junction and improvements on Lahinch Road onto the existing N85 roundabout; 4) The provision of trunk water and drainage services and other services; 5) Public lighting installation; 6) The connecting of existing services to the site; 7) Ancillary site works, ground works and landscaping. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.
1. The construction of 289 no. residential units comprising a mixture of 12 no. 1 bed apartments, 78 no. 2 bed townhouse/duplex/apartment units, 165 no. 3 bed dwelling houses, and 34 no. dwelling houses which will have an option of a 3 or 4 bedroom house-type; 2. A 400.7m2 creche/childcare facility; 3. The provision of landscaping, open space and amenity areas, including play/exercise equipment, a linear amenity walkway, informal play areas and local play areas; 4. The provision 2 no. pedestrian connections to the existing public footpath along the N85, 2 no. pedestrian connections into Ballymacaula View Estate, improvements/upgrades to the pedestrian footpaths along Circular Road including an uncontrolled pedestrian crossing and pedestrian footpath provision along part of the Drumbiggle and Cahercalla Roads; 5. All associated infrastructure and services including 1 no. vehicular access point onto Circular Road, car and bicycle parking and bin storage, lighting, 2 no. ESB substations, drainage and 1 no. pumping station, boundary treatments.
For a Large-Scale Residential Development (LRD) at this site at Ballymacaula, Drumbiggle, Keelty, Circular Road, Ennis, Co. Clare. The development will consist of 1. The construction of 300 no. houses comprising 14 no. 1 beds, 91 no. 2 beds, 164 no. 3 beds, and 31 no. 4 beds; 2. 1 no. creche/childcare facility; 3. The provision of landscaping, open space and amenity areas, including a linear amenity walkway, footpaths, cycleways and play areas; 4. The provision of 3 no. pedestrian connections to the existing public footpath along the N85, 2 no. pedestrian connections into Ballymacaula View Estate, improvements/upgrades to the pedestrian footpaths along Circular Road including a raised pedestrian crossing and pedestrian footpath provision along part of the Drumbiggle and Cahercalla Roads; 5. All associated infrastructure and services including 1 no. vehicular access onto Circular Road, car and bicycle parking, bin storage, lighting, 3 no. ESB substations, drainage,1 no. pumping station, boundary treatments. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development. The application may be inspected online at the following website set up by the applicant: www.ennislrd.ie
For development which will consist of the replacement of 2 no dwelling houses on sites 41 and 42 with one no. detached 2 storey dwelling house including services connections and site works, all to that previously granted under Planning Ref. 17-237.
For development which will consist of the replacement of 2 no dwelling houses on sites 39 and 40 with one no. detached 2 storey dwelling house including services connections and site works, all to that previously granted under Planning Ref. 17-237.
For development which will consist of the replacement of 2 no dwelling houses on sites 37 and 38 with one no. detached 2 storey dwelling house including services connections and site works, all to that previously granted under Planning Ref. 17-237.
For development which will consist of (1) A revised house design on sites 41/42 to that previously granted under Planning Ref. 20-377. The revisions will include for (a) changes to elevations (b) Changes to internal layout (c) First floor accommodation over single storey annex (d) Changes to front gable projection. 2. Services connections and site works, all to that previously granted under planning Ref. 17-237
For development which will consist of the construction of a new farm entrance gate at the southern end of the site off Bealcragga, together with the construction of a new pitched roof barn on the southwestern side of the site for winter storage and the housing of farm machinery
For development which will consist of the replacement of 2 no dwelling houses on sites 35 and 36 with one no. detached 2 storey dwelling house including services connections and site works, all to that previously granted under Planning Ref. 17-237.
To construct a dwelling house and garage, with effluent treatment system, and new entrance from public road, with all associated site works
To RETAIN the existing entrance piers, gates and railing constructed to the front of the property including al ancillary site services and works
For development which will consist of the permission to construct a granny flat to the rear of the existing dwelling along with any other ancillary works
To renovate and extend existing derelict cottage and all associated site works
Ar chead chun síneadh cúil a thógáil ar an teaghais atá ann cheana, garáiste baile chun gairdín cúil móide gach saothar coimhdeach láithreáin ag an seoladh thuas
To construct a Livestock Holding Yard with cattle crush and effluent tank with associated ancillary site works
Planning ref: P22/72 for the construction of a new two-storey 4 bedroom detached dwelling house with new garage, water treatment system, vehicular access, and the carrying out of all other ancillary works on site.
To construct dwelling house, garage, treatment system and carry out ancillary site works
To construct a silage base and a dungstead on farm
To construct a dwelling house and garage, with effluent treatment system, accessed by means of an existing entrance and driveway from the public road to the family home and farm, all with associated site works
For the construction of a new dwelling house and garage complete with a sewage treatment system and ancillary works
For alterations to the front elevation along with internal alterations to improve accessibility and all associated site works