For temporary use of a hard-standing area for the breaking-up of end-of-life aircraft for recycling purposes
To alter the size of the proposed extension and associated works as previously granted under planning permission P21-1222
For the following: Demolish existing dining room and conservatory. Construct new two-storey and single storey extension to the rear and side of existing dwelling (total area - 215sq.m) consisting of new living room, kitchen, bedroom, en-suites and utility. Conversion of existing garage into a Granny Flat connected to main house by a new entrance hallway (38sq.m.) Elevational changes to existing structure. New replacement sewage treatment system. Driveway alterations ancillary site works
For development - the development consists of the construction of an new entrance onto public road, the construction of a road from that entrance of a road from that entrance using inert soil and stone class (170504) and using concrete class (170101) into farmyard and associated site works
For the construction and operation of a concrete batching plant which will produce up to 50,000 m3 of ready-mix concrete annually over an area of circa 1.6 hectares within the southern portion of Bunratty Quarry, in the townland of Bunratty West, Co. Clare. The proposed concrete batching plant will include concrete plant (x 1), 100 tonne storage silos (x 4), 50,000L water tank1 (x 1), 80 tonne storage bins (x10), control cabin, admixture building, conveyor system, washout lagoons, attenuation tank, an access ramp and associated drainage infrastructure including a settlement tank. The proposed development will involve the utilisation of both virgin aggregates and recycled aggregates. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
To renovate and extend existing dwelling house, connect to new wastewater treatment system and carry out all ancillary site works
For development at this site in the townlands of Clonloghan and Caherteige, Co. Clare. The proposed development consists of an amendment to Condition No. 4 of the previously approved parent planning permission (Planning Ref. 18585), which relates to the operational life of the development. The proposed amendment seeks to extend the operational life of the permitted development from 25 years to 37 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
For the construction of an Advanced Aerial Mobility Research Lab with a new hard surfaced hangar apron and taxiway to existing taxiway. The works include connection to N19 for site access via currently approved Planning ref 23-96, the provision of 48No. carparking spaces which include accessible spaces, EV charging areas, set-down area, secure bicycle parking spaces, louvred plant/refuse store, photovoltaic array, reconfiguration of airside/landside boundaries, building signage and a single storey substation/switchroom with all ancillary landscaping and associated site works & services including rising main with installation of a new pumping station to facilitate connection to existing airport infrastructure. The planning application is accompanied by a Natura Impact Statement
For development at Rineanna South, Shannon Airport, Co Clare. The development consists of the construction of a single storey high-bay Air Cargo Hub and logistics/distribution facility (2705m2) with ancillary single storey office area (335 m2). The works include a new site access and the provision of 42 no carparking spaces which include accessible spaces, secure bicycle parking spaces, louvred plant/refuse store, photovoltaic array, building signage and a single storey substation. The construction of new hard surfaced ancillary delivery/service yard with vehicular and HGV parking all ancillary landscaping and associated site works and services including the decommission of adjacent septic tank and installation of a new pumping station to facilitate connection to existing airport infrastructure. The planning Application is accompanied by a Natura Impact Statement
To construct an extension to rear and side of existing cottage and associated works to include renovation of cottage, installation of a wastewater treatment system and site works
The development consists of the construction of a slatted unit and associated site works
To construct a single dwelling house, advanced water treatment system and ancillary site works.
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
Is sought for the proposed works: 1) removal from site and decommissioning of existing 3 No. overground fuel tanks and existing underground fuel tanks; 2) removal from site of existing washing machines facility and removal of unauthorised disused manual car wash; 3) removal of existing forecourt canopy and 4 No. fuel pumps; 4) proposed change of use from storage area to customer toilets, on the ground floor of the existing building, to include minor changes to elevations; 5) construction of new 3 No. dispenser pump islands, dispensing fuel on each side, with new canopy over; 6) installation of new underground fuel tanks, and all associated fuel pipework, off-fill points and vents and installation of new truck/HGV fuelling pump; 7) alterations to existing parking areas to provide new car parking layout, with provision of EV charging spaces and bicycle stands; 8) construction of new ESB sub-station; 9) concrete slab surfacing, asphalt surfacing and associated drainage with the provision of new Class A Petrol interceptor; 10) alterations to existing site entrances, to provide 2 No. vehicular site entrances to and from the site from public road, including alteration/extension of existing front boundary wall; 11) construction of all associated site features including public lighting and all associated ancillary site works. Planning permission for RETENTION is also sought for the existing works as constructed: 12) existing totem sign; 13) existing signage on front and side (east) elevation of amenity building; 14) existing block boundary walls along eastern and western site boundaries; 15) existing single-storey storage rooms to rear of amenity building, as constructed; 16) change of use from tea room use to residential use to provide 1 No. apartment at first floor level, inclusive of access stairs, as constructed; 17) change of use from storage areas to retail area at ground floor level of existing amenity building, as constructed; 18) existing outdoor seating areas, as constructed; 19) elevational changes to existing elevations, as constructed
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
For the development of an extension to existing dwelling which will include a side and rear extensions and all associated site works
To construct 4 dwelling houses together with all associated site works and services
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
To construct a dwelling house, garage, entrance, installation of a wastewater treatment system and associated site works
To construct a dwelling house, garage, entrance, wastewater treatment system, and associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
For development - the development consists of the construction of a slatted unit extension onto existing slatted unit and associated site works
For the construction of an extension to the Bunratty Manor Hotel consisting of 4 no suites, carparking an all ancillary site works
For a development comprising 48 no. residential units, (14 no. detached houses, 28 no. semi detached houses, 6no.terrace houses), ancillary surface car parking, vehicular, pedestrian access to the proposed development via a new junction off Bunratty West Holiday Village connecting to the L3126, connection to existing public water supply; foul water drainage services including the provision of surface water attenuation and all associated site development and landscape works on lands. The planning application is accompanied by a Natura Impact Statement.
Of additional internal floor area and alterations to the side and rear elevations of existing dwelling
For a renewable energy development on a 3.5 hectare site in the townland of Stonehall, Newmarket on Fergus, Co Clare. The proposed development will constitute the provision of the following: Construction of a Biomass processing and storage area utilising forestry products. Construction of a Gasification and Methanation Plant for the production of advanced biofuels. Construction of a Gasification and Combined Heat Power Plant for production of electricity and heating. Construction of a Battery Storage Facility (20MW). Construction of a Thermal Energy recovery and storage facility for district heating distribution. Construction of new on site 38kV substation. Creation of a new access road from the L-3169-0. All ancillary development including the provision of site office, car parking, internal access roads, perimeter landscaping, fencing, lighting, and on sire drainage. The Planning application is accompanied by a Natura Impact Statement.
For amendments to the site layout as permitted (P19-939 and ABP-309278-21 Refer) comprising the reconfiguration and removal of a portion of the pedestrian footpaths as previously permitted together with all associated ancillary and incidental site works
For a 1.2mW PV solar farm development. The proposed works will consist of a 1.2mW PV solar farm located within the airfield, with an area of approximately 2.25 hectares, comprising of linear arrays of solar photovoltaic panels on ground mounted frames (with associated cabling and ducting), a modular substation, inverters, new internal site access road and all associated ancillary development works
For change of use of part of the existing Guesthouse B&B to a Tea Room Café, for use by members of the public between the hours of 10am - 5pm daily, internal modification of building consisting of construction of a double door access between proposed tea room Café and existing Guesthouse dining area together with associated site works
To RETAIN a 99m2 single storey extension to the airport fire station fire tender bays. PERMISSION for development consists of the further construction of a 128m2 single storey extension to the airport fire tender bays
To demolish existing substandard garage and Permission for the construction of a domestic garage and store including ancillary site works
For a development comprising 20 no. residential units, (6 no. detached houses, 10 no. semi-detached houses, 4 no. Duplex units), ancillary surface car parking, vehicular & pedestrian access to the proposed development via the existing residential development to the north of the site which is under construction (planning ref; 19/939), connection to public water supply; foul water drainage services including the provision of surface water attenuation and all associated site development and landscape works on lands at Bunratty West, Bunratty, Co. Clare. Works to Include alterations to the previously approved planning ref; 19/939, alterations include revised parking, road, footpath and open space where both residential schemes ajoin. The planning application is accompanied by a Natura Impact Statement (NIS)
To construct 2 no. two-storey detached dwellings and 2 no. ancillary single storey garages to the rear along with 2 no. individual vehicular and pedestrian accesses, parking, boundary treatment and connections to adjacent services/utilities inclusive of all associated site works
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works
For internal changes, replacement of thatch roof with natural slate and to retain external dining area with retractable roof and windows
Of dwellinghouse, garage, septic tank, site boundaries and public road access, as constructed
For works carried out to existing dwelling to include increased ridge height and reconfiguration of roof to single storey element, demolition of boiler room and replacement with new bathroom, raised balcony to Southern Elevation, alterations to window opes together with all associated ancillary and incidental works
To construct a dwelling house, domestic garage, waste-water treatment system and soil polishing filter together with all associated site development works and connections to public services
Of a portal frame type shed and all associated development works
Of a) retain entrance as constructed. b) PERMISSION to install roadside pipe / culvert under entrance together with all associated site development works and services
For refurbishment works to existing coastal defence embankments at Shannon Airport, Shannon, Rineanna South, Co Clare. The proposed works include different combinations of armouring, top-soiling and grassing along the embankments. A Natura Impact Statement has been prepared and is included in the application. An Environmental Impact Assessment screening report has been prepared and is included in the application. It concluded that an Environmental Impact Assessment is not required
For PERMISSION for development and RETENTION permission for development at a 3.078 Ha site at Bunratty Castle Hotel, Bunratty, Co Clare V95 DW9N (a Protected Structure) The development consists of the RETENTION of works which were undertaken to rationalise, upgrade and repair (principally required as a result of fire damage) part of the existing hotel which has resulted in an increase in Ground Floor Area from c. 1,457 sq m to c1,681 sq m. The works subject to RETENTION permission principally include: the removal of selected internal and external walls, and external structures (c. 120 sq m); the reconfiguration of selected internal spaces; the construction of a single storey extension which links to a fire escape core to the rear of the hotel (totalling c. 150 sq m); the infilling of an internal courtyard to provide an internal extension (c. 56 sq m): the removal of 3 No. bedrooms, 2 No. offices and 2 No. stores at First Floor Level to provide a double height space below (c. 162 sq m); the removal of external fire escape stairs; the removal of proprietary metal steps on roof; the removal of plant including a water storage tank and enclosure and kitchen extract plant on roof; the removal of part of flat roof and associated roof lights and the provision of new flat roof; elevational changes; and landscaping. The development will also consist of: the provision of a new extended(c. 10.5 sq m) frontage to bar/bistro with full height doors/glazing panels and an entrance lobby with retractable awning on the southern elevation; the reconfiguration of selected internal spaces; the insertion of new windows in lieu of selected existing windows; the provision of part new flat roof; the provision of rooflights; the provision of plant including a new water storage tank and enclosure, and fire escape walkway on roof; the reconfiguration of the existing car parking resulting in an increase in the number of spaces from 140 No. to 152 No.; the provision of bicycle parking spaces; elevational changes; boundary treatments and landscaping; and all associated site and development works above and below ground
For the construction of an extension to existing shed/studio to comprise of home gym including ancillary site works
For development comprising the regeneration of an existing brownfield site at the site of the former Shannon Shamrock Hotel at Bunratty, Co. Clare. A seven year planning permission is sought to demolish the existing hotel and ancillary outbuildings and to provide for the phased delivery of a mixed use development including provision of: (a) 67 no. residential units comprising 20 no. 2 bed houses and 47 no. 3 bed houses; (b) 1 no. convenience retail store of 470sqm (net) floor area; (c) 6 no. retail / office units including 4 no. units of 167sqm (net) floor area and 2 no. retail / office units of 231sqm (net) floor area intended to accommodate Class 1 & Class 2 Uses; (d) a bat house; and (e) all ancillary site development works including (i) car & bicycle parking; (ii) bin storage; (iii) signage; (iv) 2 no. ESB sub-stations; and (v) public lighting. The existing conference centre building shall be retained on site and shall form part of a future phase of development. The application is accompanied by a Natura Impact Statement
For development and RETENTION permission for development at a 0.153 Ha site at Bunratty Castle Hotel, Bunratty, Co Clare V95 DW9N (a Protected Structure). The development will consist of: the construction of a single storey extension (150 sq m) to the front (south) of the existing function room to be used as a pre-function room; the provision of an external terrace principally to the south and east of the pre-function room; the provision of an extension to the existing raised terrace to the front (south) of the bar/bistro; elevational changes to the existing function room; plant; hard and soft landscaping; boundary treatments; signage; and all associated site and development works above and below ground. The development subject to RETENTION permission consists of: the removal of 5 No. car parking spaces; and the provision of a retaining wall which will form the boundary of the external terrace to the pre-function room
The development will consist of: (A) Works to the existing two storey, stone building, to the north-east of the site which is located within the curtilage of a protected structure. The renovation and general repair to the existing stone building; the provision of a new sanitary facility and entrance lobby, confined to a single storey, timber clad extension to the north façade of the existing structure, increasing the total floor area of the structure from 47sqm to 58sqm; the provision of an external stairs to the west of the stone building; the provision of 3 No. Car Parking Spaces (Includes 1 No. Disabled Car Parking Space); the provision of street lighting to the north of the existing structure; the change of use of the existing stone structure from its former use as an art gallery, to its proposed use as a bar. (B) The provision of a pergola structure, with an overall height of 3.43m, and with a footprint of 41m2, positioned adjacent to the existing entrance to the bar at Bunratty Castel Hotel on the south façade of the hotel. The pergola structure will consist of a powder-coated finish with a timber soffit, works include all associated site and development works above and below ground. (C) The provision of a 4no. street lamps, with an overall height of 5.5m to the rear entrance road on the North of Bunratty Castle hotel. Works to include all associated site and development works above and below ground.
For new domestic entrance and all associated site works
The development consists of the erection of a 68m linear, glazed and covered passenger walkway from departure gates area 1-5 to aircraft parking stand 26B
To change the site boundaries as granted under P99-780, demolish 2 existing on-site sheds, and to construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works