Retention for single storey building to rear garden for home office / playroom use and all associated site works.
First floor extension over existing ground floor extension to rear of house, consisting of two bedrooms and a bathroom and all associated site works.
Provision of an ancillary off-license sales area of c. 63.61 sq.m in the ground floor retail unit.
Retention of Veterinary Centre use in Unit 14 and change of use from shop to Veterinary Centre in Unit 15.
Change of use of 2 existing ground floor retail units to a Day Service Centre; new internal partitions to accommodate meeting rooms; open plan learning spaces and toilet and staff facilities; external works comprise replacement of the existing shopfront at ground floor level incorporating new windows, doors, fascia and signage.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Installation of roof mounted solar panels over an existing Waste Transfer/Recycling building and all associated site works and services; the proposed development relates to an activity covered by an existing Waste Licence issued by the Environmental Protection Agency.
Conversion of attic with consequential alterations to existing rear roof to include a contemporary dormer to create a habitable bedroom with ancillary works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Retention of vehicular access/egress and associated parking provided for the former temporary school accommodation on vacant site to rear.
Single storey rear extension, also attic conversion with lean-to dormer to rear for storage.
Planning permission is sought for the following alterations: • Internal alterations at the ground floor level of the permitted warehouse/logistics unit, including a change of use of 310 sq.m, to provide additional ancillary staff welfare facilities and ancillary office accommodation; • Provision of an additional 158 sq.m at first floor level for ancillary office accommodation; • Amendments to façade treatment including signage and louvres; • Repositioning of the roof mounted Solar PVs; • Other associated alterations including to the landscaped areas; and • All associated development works Retention permission is sought for the following: • Reconfiguration of car parking layout, including amendments to circulation arrangements adjacent to the building entrance. No change is proposed to the overall number of car parking spaces; • Repositioning of the bicycle shelters; • Amendments to façade treatment, including: o Reconfiguration of glazing mullion centres and incorporation of additional opening sections; o Provision of a first-floor opening vent window to Staircore 2; o Minor adjustments to the cladding arrangement at parapet level; • Repositioning of the roof mounted AOVs; and • All associated site development works. The proposed alterations result in an overall increase of 158 sq.m in the total GFA of the warehouse/logistics unit from 3,026 sq.m to 3,184 sq.m (including ancillary office and staff welfare facilities).
A) Alterations to existing south elevation including removal of window, widening of existing window opening, installation of new entrance door and glazed screen; b) Reconfiguration of existing ramp and steps; c) Relocation of existing ATM and canopy from south elevation to the west elevation including new stone surround to match existing; d) Alterations to existing signage to include relocation of existing sign over entrance to over new entrance and relocation of existing projecting sign to new position on south elevation.
The demolition of the existing garage to the side and small extension to the rear, and the erection of a ground floor granny flat to the front side and rear with a first floor two bedroom dormered extension over the proposed granny flat, also a single storey porch and sitting room extension to the front and a kitchen extension to the rear
Alterations to Unit 6 permitted under Reg. Ref.: SD22A/0099 The proposed alterations to the permitted Unit 6 are as follows: Internal alterations at the ground floor level of the permitted warehouse/logistics unit to provide additional ancillary staff welfare facilities, an ancillary trade counter and associated office and storage area, and an ancillary innovation area / testing room; Repositioning of Stair Core 2 at ground and first floor level and proposed extension to the ancillary office floorspace at first floor level, with an additional gross floor area of 110 sq.m; Provision of a first-floor mezzanine level of additional warehouse/logistics floorspace with a GFA of 1,180 sq.m, accessed by new stairs from ground floor level; Alterations to the permitted elevational treatment, including: Reconfiguration and additional glazing on the south-east, south-west and north-east elevations as a result of the proposed internal layout alterations; Removal of the office entrance on the south-east elevation and opaque glazing screen from the WC core on the south-west elevation; Alterations to the cladding arrangements and parapet levels on all elevations (no increase in permitted building height); Central repositioning of grade and dock loading doors on the north-west elevation; Additional entrance doors along the south-west elevation to align with the revised internal layout; Other associated alterations including to the landscaped areas and the extent of boundary fencing; Reconfiguration of the car parking layout, including provision of 3 no. additional parking spaces (40 no. spaces in total, including 2 no. accessible spaces and 8 no. EV charging car parking spaces); Provision of 6 no. additional EV charging spaces for delivery vans to the north of the unit within the service yard; All associated site development works. The proposed alterations result in an overall increase of 1,279 sq.m in the total GFA of the warehouse/logistics unit from 3,997 sq.m to 5,276 sq.m (including ancillary office, trade and staff welfare facilities).
Construction of additional floor area of 192.43sqm to existing warehouse and office building of 1658.44sqm, alterations to layout of 152.11sqm of existing warehouse and alterations to existing parking layout to accommodate disabled parking. New first floor of 169.75sqm internally in existing warehouse, internal alterations at ground level, 2 storey extension to southern elevation of existing warehouse to accommodate new entrance lobby and all associated site works.
Two side-facing Velux windows on the front dormer and a Velux window on the front roof slope. New front-facing fenestration on the front dormer. A new dormer to the rear at attic level. A flat-roof single storey extension to the rear.
First floor extension (4sq.m) to rear of dwelling.
Single storey extension (18.0sq.m) to side of dwelling; enlarge existing front porch (2.4sq.m) to front; associated site works.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
Change of Use of a 117sq.m Shopping Centre Unit from Doctor's surgery use to unit for Day Care Centre Use
Provision of off licence subsidiary to the main retail use.
Construction of a single storey one bedroom dwelling attached to the existing dwelling with new vehicular entrance to both existing and proposed dwellings; new boundary walls and all associated works.
Front extension to the existing garage converting the space into a gym and office, new windows to the side of the garage and access door to the rear garden, including all associated site works.
Construction of new front door structure to front elevation; single storey rear extension extending existing kitchen space and widening of the existing front entrance pillars with new solid gates and associated works
Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
Change of use in Unit 2 from previously permitted (Refs. SD16A/0060 & SD19A/0371) from retail unit to a food take away outlet.
Single storey pitched roof extension to side.
Change of use from office to medical/dentist use with revisions to front elevation.
Retention of retention permission to retain the existing as constructed self-contained family flat to the side of existing house and all associated site works.
New rear dormer structure at attic level and conversion of the attic space to habitable space with ensuite
Demolish single storey garage to side of house; construct new one and half storey, end terrace dwelling with dormer windows to front and rear (85sq.m); alterations to the existing vehicular entrance for the proposed dwelling; new vehicular entrance for existing dwelling and all ancillary site development works.
Change of use of existing open plan 997sq.m shell and core retail unit to the use as a spa/recreational facility to include swimming pool area; relaxation areas; treatment rooms; associated office/administration areas; changing facilities; internal dining/restaurant area; associated kitchen facilities; plant areas; associated ducting/extraction vents with associated elevational changes; connections to all services and site development works; new internal mezzanine floor to provide additional 602sq.m at new first floor level and on-street bicycle parking outside the building for 18 bicycles at the corner of Abberley Square and Abberley Square East.
Construction of single storey garden room. Consisting of home office & gym & all associated site works.
The construction of a two storey, mixed use, development consisting of a public house at ground floor level with a gross floor area of 359sqms. The public house includes internal bin storage and other ancillary rooms. The construction of 4 residential apartments (Gross floor area 374sqms) at first floor consisting of 2no. one bed units; 1no. two bed unit; and, 1no. 3 bed unit. All apartments have private space in the form of balconies with a common area at first floor for access to each apartment with access to this common area off the internal entrance lobby; internal, residential, bike storage room and bin storage room at ground floor level. The proposed development includes communal amenity spaces located to the west of the block and at first floor level; parking of 8 spaces including 1 no mobility space, 2 electric vehicle spaces and is accessed via a new vehicle entrance from the Old Belgard Road. New boundary treatments proposed along with a drop off area and wider soft and hard landscaping including a plaza area which ties into the public footpath on the Old Belgard Road; external bike parking areas within these external spaces; and, a connecting footpath to the established local centre to the north. Associated mechanical plant, PV panels at roof level, groundworks, landscaping, drainage including SUDS measures, lighting, engineering and ancillary works necessary to facilitate the development.
Alterations to previously approved design (Reg.Ref:SD25A/0001W) comprising modified internal apartment layouts, additional window/door ope to terraces in Apts 1 & 2, fenestration alternations to southern and eastern facades, additional floor area to Apt. 4 to northern elevation, additional of 2 no. AOV's to roof level and all associated site works.
Change of use of a vacant unit to four one bedroomed apartments.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached dormer bungalow in rear garden with partial 2 storey area, alterations to existing driveway, construction of new vehicular entrance with partial dishing of kerbs & all ancillary site work.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached dormer bungalow in rear garden with partial 2 storey area, alterations to existing driveway, construction of new vehicular entrance with partial dishing of kerbs & all ancillary site works.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached Dormer Bungalow in rear garden with partial 2 storey area, alterations to existing driveway, constriction of new vehicular entrance with partial dishing of kerbs & all ancillary site works
Planning permission is sought by The KSL Clinic (Ireland) Limited at Unit C15 The Exchange, Calmount Park, Calmount Avenue, Dublin 12, D12 NT29 for the change of use from existing Offices (class 3) to mixed-use of commercial Offices (class 3) / Medical Use (class 8a; Health Centre or Clinic). Works will include internal works only.
1. Construction of a two storey side extension with a gable ended roof to consist of a living room, WC and utility at ground floor and master bedroom with a walk-in wardrobe and a bathroom on the first floor. 2. Modifications to the existing side boundary wall for provision of a new pedestrian access exiting onto Kingswood Heights Grove. 3. Modifications to the existing front and side walls boundary treatments for provision of a new vehicular access including dished public footpath exiting on The Grove, Kingswood Heights. General remodel and partial upgrade of the existing dwelling to suit the proposed layouts. 5. All drainage, structural and associated site works to be implemented.
Replace condition 4 (stating a limit of 15 children) Ref. SD03A/0384 with a new limit of 32 children in sessional care in compliance with current ratios of floor area to number of children as set out in the childcare act 1991 (Early Years Service) Regulations 2016.
Construction of new side dormer structure at attic level and conversion of the attic space to a bedroom and bathroom. The dormer structure allows for stair access and a functioning bedroom and bathroom with limited space available from the existing hipped roofed structure
Conversion of existing attic space comprising of modification of existing hipped roof structure to form a gable end design; construction of flat roof dormer to the rear with dormer windows and new internal access stairs.
Change of use from coffee shop to hot food takeaway.
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.
Demolition of single storey timber frame extension; demolition of disused chimney stack both to side of existing dwelling; construction of single storey ground floor extension to front; construction of ground floor extension to rear of existing dwelling with first floor extension partially over and all associated site works.