Change of use from a Bookmakers (from last used) to a community -based Resource Centre/Wellness Centre to be operated by Dublin Vineyard CLG. Internal alterations and modifications, including removal of internal walls and part levelling of floors to assist with achieving universal access. New hardwood sign fitted to the existing signage frame. Replacement of the two external doors to the street with new painted hardwood doors.
The development will consist of a side and rear extension, a porch and all ancillary works necessary to facilitate the development.
Change of use of existing bookmakers to a café; opening hours Mon - Fri 8:00am - 12:00am, Sat - Sun 12:00pm - 12:00am including raising the height of the front entrance door.
Change of use of existing ground floor retail unit to a restaurant with ancillary take away option; related extract system venting out roof level and all associated site works.
Change of use from existing office use to a two bedroom residential dwelling house.
Two side-facing Velux windows on the front dormer and a Velux window on the front roof slope. New front-facing fenestration on the front dormer. A new dormer to the rear at attic level. A flat-roof single storey extension to the rear.
The demolition of three existing apartment units (c. 239sq.m) and bin store (c.18sq.m) and the construction of a residential development arranged in two building blocks (Block A & Block B) ranging from 3 to 6 storeys in height over basement level (c. 3,728sq.m, including basement). Block A comprises 11 residential apartments (c. 1256sq.m) in a 5 to 6 storey building and including a ground floor level cafe (c. 93sq.m) at the buildings south eastern corner; Block B comprises 15 residential apartments (c.1393sq.m) in a 3 to 5 storey building; The proposed development will comprise 26 new residential units (5 studio apartments, 6 1-bedroom apartments, 7 2-bedroom apartments & 8 3-bedroom apartments) with associated balconies and terraces. The proposed development will comprise a total of 40 apartment units derived from 26 new apartments and 14 existing apartments; relocation of existing basement access on Old Greenhills Road and the upgrade and extension of the existing basement level; provision of internal footpaths; landscaped communal open space (including outdoor gym equipment, children's play area and 'working from home' area); public open space; 13 car parking spaces and 74 long-stay bicycle parking spaces and 1 motorcycle parking spaces at basement level; 2 shared car parking spaces and 20 short-stay bicycle parking spaces at surface level (15 car parking spaces, 94 cycle parking spaces and 1 motorcycle parking in total); all piped infrastructure and ducting; elevation treatments; plant room; lift access and stair cores; hard and soft landscaping and boundary treatments; changes in level; waste management areas; attenuation tank; backup generator; solar photovoltaic panels; lighting; and all associated site development and excavation works above and below ground. The subject site is currently partly developed with an existing residential scheme known as Greenhill's Court comprising 17 apartment units in 4 apartment blocks ranging in height from 2 to 4 storeys, including basement car park all on a site of approximately 0.23ha. on lands bounded to the north by St Basil's Training Centre, to the east by Greenhills Road, to the west by Old Greenhills Road, and to the southeastern corner by Main Street, Tallaght, Dublin 24
Two bedroom, double storey house.
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
(1) Rear extension consisting of a store on the ground floor, a surgery and autoclave room on the first floor; (2) replacement of existing (old) roof slate tiles with matching new slate tiles of a semi-detached 'Protected Structure'.
Two storey extension to side; single storey extension to rear and porch to front.
Porch to front.
The development will consist of the provision of a new glazed entrance lobby (24sqm) at the existing west entrance to the Square Shopping Centre (Level 3) and all associated site and development works.
Roof dormer to the rear aspect of the roof and retention of the 'Velux' rooflight to the front aspect of the roof.
Extension to the side at first floor level only comprising a staircase from the rear first floor bedroom to attic level; the enclosure to the stairs to be 1m wide external with off-white T&G effect cedral cladding finish.
Two storey 44sq.m extension to the rear accommodating a ground floor kitchen extension and new first floor bedroom with roof to be pitched; wall and roof finishes to match existing dwelling.
Provision of a roof dormer to the rear of aspect of the roof.
The development seeking retention consists of the construction of a fence on top of the existing block wall along the side and rear boundaries of the property
(i) Demolition of existing single storey ESB substation (3.5sq.m) on the north western site boundary; (ii) South building ranging from 5 storeys to 8 storeys (max. height c.26.40m) with a total gross floor area of 2663sq.m comprising; (a) 28 residential units comprising 17 1-bedroom apartments, 10 2-bedroom apartments and 1 3-bedroom apartment; (b) At ground floor and with frontage onto Main Road, 3 commercial units to facilitate a range of uses: Unit B (73sq.m) - Class 1, shop (newsagent, parcel delivery drop store) or Class 10 (Community Centre); Unit C (49sq.m) - Class 1 shop (cycle store/Charity Shop); Unit D (74sq.m) - Class 1, shop, Class 2 (financial/professional services) or Class 8 (Healthcare); (c) Also at ground floor, a management office (17sq.m), a maintenance office (12.5sq.m), ESB substation and switch room (combined 22sq.m) and commercial bin storage area (12.5sq.m); (iii) West building ranging from 4 storeys to 5 storeys (max. height c.16.07m) with a total gross floor area of 1441sq.m comprising (a) 15 residential units including 4 studio units; 5 1-bedroom units, 3 2-bedroom units and 3 3-bedroom units; (b) tenant amenity floorspace (42sq.m) at ground floor;(c) 1 92sq.m commercial unit (Cafe/restaurant/Deli) at the corner of Old Greenhills Road and Main Road; (iv) A communal amenity courtyard (459sq.m) and public open space in the form of a new civic plaza (337sq.m) at the corner of Old Greenhills Road and Main Road and public realm improvements at the southern end of Old Greenhills Road including improvement works to the Katherine Tynan memorial (505sq.m); (v) A basement (1298sq.m) incorporating 25 residents car parking spaces (including 4 Go-Car spaces, 2 electric vehicles spaces and 2 accessible spaces), residents long stay cycle parking (50 spaces) and residents waste management facilities (49sq.m); (vi) A new vehicular entrance from the Old Greenhills Road to the proposed basement; (vii) A total of 24 surface level short stay cycle parking spaces comprising 4 spaces at the Katherine Tynan Memorial, 8 spaces within the residents communal courtyard and 12 spaces at the new civic plaza; (viii) Removal of 2 on-street car parking spaces on Old Greenhills Road to facilitate access to the proposed basement and installation of a raised pedestrian crossing at the southern end of Old Greenhills Road and (ix) All ancillary site development works including installation of drainage and water supply infrastructure, installation of rooftop solar photovoltaics panels (128sq.m) and lighting.
2 number signs (1 main fascia sign & 1 menu sign) to the front elevation of the oriental take away business
Permission for retention of 2 no signs (main sign & menu sign) to the front elevation of the oriental take away business.
Roof dormer to the rear aspect of the roof and construction of a single storey 18sqm rear extension with flat roof.
Attic conversion for storage with dormer window to the rear with 2 Velux windows to the front roof area. First-floor extension to the rear. Demolition of the existing shed to the rear and replacement with new shed with a pitched roof
3 signs (1m metre high x 4.5 metres wide aluminium back panels with individual raised illuminated lettering) on the existing tower feature on the western elevation of The Square; 1 sign (1.2m meter high x 6.1 metres wide aluminium back panel with individual raised illuminated lettering) positioned externally on the southern elevation of The Square (south eastern corner).
(a) the construction of a two storey mezzanine floor structure, (b) the installation of a new escape door to the rear elevation, and (c) all associated site works.
A) Alterations to existing south elevation including removal of window, widening of existing window opening, installation of new entrance door and glazed screen; b) Reconfiguration of existing ramp and steps; c) Relocation of existing ATM and canopy from south elevation to the west elevation including new stone surround to match existing; d) Alterations to existing signage to include relocation of existing sign over entrance to over new entrance and relocation of existing projecting sign to new position on south elevation.
The change of use and conversion of existing attic space to storage space with dormer window to the rear, hipped roof to new gable wall, with ground floor single storey extension to the rear, and conversation of the side garage to habitable space with minor alterations to the front elevation, internal layout adjustments and all associated ancillary site works at 30 Bancroft Avenue Dublin 24, D24 XWE0.
Detached two storey house with new vehicular entrance to side of 54 Fernwood Avenue as per previously granted application SD16A/155
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
Carry out external works for the removal of an ATM, to be infilled with panelling to match the existing; The removal of the night safe front plate, replacing with a blank steel plate, as well as the removal of the Ulster Bank raised lettering shop signs and the removal of the Ulster Bank general blue signage; Carry out internal works for the removal of the ATM's in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors.
Demolition of the existing former Ulster Bank building and the construction of two new buildings: a mixed-use building (Block A) and a residential building (Block B). Block A is a proposed 3-storey accessed by Old Blessington Road (Main Street) and will consist of 1no. retail unit ( 76.5 sqm ) at the ground-floor and 4 no. apartment units ( 4 No. 1-bed units). Block B is a proposed 5-storey located to the rear of the site, accessed by a side lane connected to Old Blessington Road, consisting of 22 no. apartment units (8 No. 1-bed units, 4 No. 2-bed units, and 10 No. 3-bed units). The vehicular and pedestrian entrance is accessed by a side lane connected to Old Blessington Road. The development will also include associated private and communal open spaces, landscaping, bicycle storage, bin storage, retail storage, and all associated site works.
Retention of Veterinary Centre use in Unit 14 and change of use from shop to Veterinary Centre in Unit 15.
Installation of a new external door in the Northwest Elevation to access a new ESB meter enclosure at ground floor of Unit 26C Fashion City, Ballymount Road Upper, Dublin 24
Erect 728.41sq.m of photovoltaic panels on the roof of existing building with all associated site works.
(1) Change of use of the existing ground floor (411sq.m) and first floor (401sq.m) levels from previously granted Showroom/Warehouse storage under Reg. Ref. S01A/0173 and further extended under Reg. Ref. SD02A/0514 to office use. (2) Modifications to the front facade comprising the replacement of the main entrance doors at ground floor level with glazing to match the existing, the installation of a new window to match existing at first floor level and new signage (2sq.m). (3) Modifications to the rear facade comprising the replacement of the existing roller shutter at ground floor level with fixed curtain wall glazing to match existing and the installation of new fixed louvres to match existing at first floor level.
Erection and installation of 124 photovoltaic solar panels with an area of 235.6sq.m (with average size of 1.9sq.m per panel) on the existing roofslope and all associated alterations to existing elevations, site and ancillary works.
Permission is sought by Cleargate Limited for (1) retention of change of use from Cafe/Restaurant to wholesale outlet (25A - unit50sqm) (2) Retention of change of use of Cafe/restaurant to wholesale outlet (unit 25B - 63smq) and (3) Permission for change of use of cafe unit (unit 25 - 61sqm) to wholesale outlet and incorporation into Unit 25B at Fashion City, Ballymount Road Upper, Ballymount Road Upper, Ballymount Dublin 24.
Erect 1,063.05sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Erection of a pergola structure with retractable roofing system including sliding glazed screens and doors to west perimeter over proposed new external dining area, the widening of existing external access door, the construction of new accessible external steps and ramps and all other associated site works.
Creation of an outdoor dining area; erection of a pergola retractable roofing system over the outdoor dining area and removable glazed screens and doors to the perimeter; erection of an extension to accommodate a new entrance lobby; forming a new entrance into the existing premises at an existing window opening and construction of a flat roof canopy over with signage; construction of new accessible external steps and ramps and all other associated site works.
Single storey extension to the front of the existing two storey terraced dwelling with a tiled roof and external finishes to match existing; internal alterations and associated site works.
Erect 525sq.m. of photovoltaic panels on the roof of existing unit with all associated site works.
Retention for 2 bay portal frame, additional floor area to existing industrial unit. Permission for roofing of 2 bay portal frame structure; extension to existing industrial unit; construction of a concrete resurfaced area in main yard; minor internal layout and elevational revisions to existing industrial unit and all associated site works including underground surface water attenuation and related utilities and works.
Retention permission and permission for development at the existing shotblasting facility. The total planning application site area extends to approximately 0.92 Ha. Retention permission is sought for: a 2 bay portal frame structure at the northern end of the facility and a 153 sq.m floor area extension at the southern end of the facility. Permission is sought for: a 716 sq.m floor area extension at the southern end of the facility; roof to enclose the 2 bay portal frame structure (for which retention permission is sought) minor changes to the internal layout including relocation of toilet and provision of ancillary office space; concrete resurfacing of the main yard area; minor elevational changes; and all associated site and development works above and below ground.
Single storey porch and kitchen extension to the front, convert existing garage to a study, erect a single storey extension to the rear and widen the existing vehicular entrance from 2.5 metres to 4.0 metres.
Erect 1050sq.m of photovoltaic panels on the roof of existing warehouse unit with all associated site works.
Dishing of public footpath, verge and kerb. Retention of widening of vehicular entrance and all associated site works.
Change of use of the fifth floor level from office to hotel use to provide for 26 hotel suites; Associated modifications to the layout and elevations at fifth floor level and to the stair cores at ground to fifth floor levels to facilitate access and egress; Introduction of lobbies to the stair cores at basement level; Provision of a green roof to the existing building on site; Revisions to the existing car and bicycle parking arrangements at basement level; All associated site development works.
Install a second cremator within the existing crematorium building to be powered with electricity; the new unit will be located beside the existing unit within the building (the building was originally designed and built for 2 units); internal alterations to the building including removal of non-load bearing block walls to facilitate the new unit; extension to the west side of the building to provide staff changing facilities and a cremulator room (20.2sq.m); extract system to be connected to the existing flue; partial demolition of existing boundary wall to facilitate a new sub-station/switch room, the laying of underground ducts for ESB connection, underground cabling and all ancillary works to facilitate the development.