to
to

Planning records

Showing 301-350 of 29,704 public records
Page 7 of 20
SD25B/0606W

Attic conversion with dormer window to the rear. Flat-roof porch extension to the front. Single-storey flat-roof extension to the rear. Installation of two garden rooms to the rear of the property with a pergola linking both.

9, Tullyhall Green, Lucan, Co. Dublin, K78 CP59South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted24 November 2025
SD23A/0249

Remove section of existing grass margin and replace with a concrete apron, install accessible kerb and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath 21.0 metres east of existing bus stop pole with 2 no. LED illuminated advertising panels each of 2.0 square metre area.

At Bus Stop No. 7803, Balgaddy Road (outside Tor an Rí Lane), Balgaddy, Dublin 22.South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted21 November 2023
SDZ23A/0040

Temporary permission for the erection of 2 no. temporary advertising / information signs and 12 no. flags, on 2 no sites, both measuring 67 sq.m, located at (i) Fonthill Road (R113) roundabout, to the west of permitted development granted under Ref. SDZ22A/0010, and (ii) adjacent to the Ninth Lock Road, to the south-east of permitted development granted under Ref. SDZ22A/0010, all within the townland of Cappagh, Dublin 22. The proposed development is comprised of 2 no. advertising / information signs measuring approximately 6.0 m x 4.5 m, on metal structures of 2.4 m. in height. The 2 no. advertising / information signs will face: (i) southwest towards the Fonthill Road roundabout and, (ii) east towards the Ninth Lock Road. The 2 no. advertising / information signs will be accompanied with 12 no. advertising flags approx. 1.0 m x 3.5 m in length, supported by a 6.1 m steel flagpole. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area as defined by Statutory Instrument No. 604 of 2015.

The Fonthill Road (R113) roundabout, adjacent to the Ninth Lock Road, all within the townland of Cappagh, Dublin 22.South Dublin County CouncilSDZ Application Clonburris0 reasons0 conditions2.0 km away
Granted12 January 2024
SD21A/0353

Retention permission for the existing telecommunications compound, including enclosure and ground mounted equipment; Permission for the replacement of a 25m high lattice tower with a new monopole carrying antennae, dishes and associated equipment with ground works, including foundation (overall height of 20m, excluding lightning finial).

ESB Clondalkin 38kV Substation, Ninth Lock Road, Clondalkin, Dublin 22.South Dublin County CouncilPermission and Retention0 reasons0 conditions2.0 km away
Refused23 February 2022
SD23A/0251

Remove section of existing grass margin and extend concrete apron to rear of existing public footpath and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area.

At Bus stop No. 5121 Green Isle Road, (outside Corkagh Park), Kingswood, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted22 November 2023
SD22B/0475

Removal of existing front boundary wall and replace with new selected stone boundary wall with new extended front vehicular access opening and widen existing front driveway.

St. Gabrial's, Boot Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted07 December 2022
SD20A/0277

Change of use from offices at first floor level to residential one bedroom apartment; reconfiguration of an existing layout to accommodate new apartment and a new private open space with 1.8m high timber screen on existing flat roof at first floor level and a new window and terrace door to the rear and side and all associated site development works.

3-4, Convent Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted04 January 2021
SD25B/0311W

Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, flat roof dormer to the rear and installation of 2no. roof windows to the front

8, Oldbridge Court, Grifeen, Lucan, K78PW83South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted18 July 2025
SD20B/0129

Single storey front and side extension (28sq.m) consisting of front porch, playroom and utility room; external wall and roof finishes to match existing dwelling.

8, Oldbridge Court, Lucan, Co. DublinSouth Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted10 July 2020
SD23A/0297

Installation of a 1.4m x 0.51m x 1.8m (LxWxH) above ground enclosure, to house a new natural gas DRI (District Regulating Installation) and a 3m high 'lamp post' style relief vent stack with all ancillary services and associated site works.

Lands along the eastern boundary of, James Connolly Park, Neillstown, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted12 January 2024
SD20B/0266

Construction of a single storey pitched roof (with 'Velux' roof windows) extension to the side of house and conversion of attic space to include a dormer type roof window to side and 'Velux' windows to rear of existing roof.

15, Haydens Park Glade, Lucan, Co. DublinSouth Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted14 December 2020
SD22A/0025

Retention and continuance of the use for a further two years of the temporary gas powered generation plant, that is located to the rear of the Takeda Ireland complex, that is sited within a walled year of 2,836sq.m containing 12 generator units with associated flues (each 15m high), which was permitted initially for a period of three years under Reg Ref. SD16A/0345 and was subsequently extended for an additional period of 2 years from the 4th February 2020 under Condition no. 2 of permission granted under SD19A/0342 Vehicular access to the generation plan will remain from the permitted service road into Edgeconnex site and Grange Castle Business Park as originally permitted.

Takeda Ireland Limited, Grange Castle Business Park, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted28 March 2022
SD25B/0029

Retention permission will consist of a ground floor only extension to the side/rear of the existing house. A new storage shed at rear of site and all ancillary works.

23A, Oldbridge Park, Lucan, Dublin, K78 P529South Dublin County CouncilRetention0 reasons0 conditions2.0 km away
Refused25 March 2025
SD24B/0321

Retention permission will consist of Ground floor only extension to the side/rear of the existing house. A new storage shed at rear of site and all ancillary works.

23A, Oldbridge Park, Lucan, Co. DublinSouth Dublin County CouncilRetention0 reasons0 conditions2.0 km away
Refused09 September 2024
SD23B/0170

Kitchen Extension

1, Oldbridge Green, Lucan, Co. DublinSouth Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted30 May 2023
SD22B/0326

Extension and refurbishment of existing dwelling to include construction of two storey extension to side and rear; internal alterations to existing layout; alterations to front, side and rear elevations including canopy area and roof to existing dwelling; alterations to side boundary; maintenance works and all associated site works.

1, Rossberry Avenue, Lucan, Co DublinSouth Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted16 March 2023
SD24A/0010

The construction of a tarmac finish off-road parking area in front of the property on the open space lands owned by the local authority, and all the necessary ancillary site development works to facilitate development.

90, Open Space Lands in front of, Boot Road, Clondalkin, Dublin 24South Dublin County CouncilRetention0 reasons0 conditions2.0 km away
Refused08 March 2024
SD25A/0021W

Planning Permission for Retention sought for the construction of a tarmac finish off-road parking area in front of the property on the open space lands owned by the Local Authority, and Planning Permission sought for the replacement of the tarmac finish with a grass paving system, and all necessary ancillary site development works to facilitate this development

Lands in front of 90 Boot Road, Clondalkin, Dublin 22, D22 P8F8South Dublin County CouncilPermission and Retention0 reasons0 conditions2.0 km away
Refused27 March 2025
SD22A/0120

Retention for Click and Collect signage in the existing Tesco car park; construction of a sheltered canopy (c. 35sq.m) in the existing car park for the purpose of providing 2 dedicated Click and Collect spaces for the existing Tesco store and all associated site development works.

Tesco, Clondalkin Shopping Centre, Convent Road, Clondalkin, Dublin 22South Dublin County CouncilPermission and Retention0 reasons0 conditions2.0 km away
Granted16 June 2022
SD23B/0496

The construction of a new single storey extension to the side of the existing house to facilitate family flat

15, Foxborough Rise, Lucan, DublinSouth Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Refused21 March 2024
SD21B/0142

Demolish an existing single storey glazed conservatory to the rear. Erection of a new single storey flat roof extension to the rear. Erection of a new single storey porch structure and flat roof canopy to the front. Widening of existing vehicular entrance and all associated alterations & site works to the existing two storey house.

58, St Brigids Road, Brideswell Commons, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted12 May 2021
SD20A/0197

Replacement of 1 existing sign on the front elevation with individually mounted internally illuminated letters (sign A: 1855mm x 7250mm), the provision of a new signage panel (sign B: 1200mm x 6355mm); and the provision of a new fascia sign (sign C: 370mm x 4235mm) at the shared entrance/exit; the removal of the existing entrance lobby and reconfiguration of the existing exit lobby to provide for an enlarged internal entrance/exit; other minor elevational changes including the provision a new cladding treatment to the exiting parapet wall and a new glazed MOE door and all ancillary site services and site development works.

Tesco, Clondalkin Shopping Centre, Convent Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.0 km away
Granted28 September 2020
SD24A/0147W

The development consists of the retention of a single story pavilion structure (floor area 203 sq.m) and will consist of two proposed acoustic lobbies (floor area 11.6 sq.m) at the rear of the existing premises. The use of the pavilion structure is ancillary to the existing bar and restaurant use on the site. Permanent permission is being sought for the pavilion structure.

The Blacklion Public House ( A Protected Structure), Orchard Lane, Clondalkin Village, Dublin 22, D22E642South Dublin County CouncilPermission and Retention0 reasons0 conditions2.1 km away
Refused06 August 2024
SD26A/0025W

Planning permission for the variation of Condition No. 2 of planning permission (An Coimisiún Pleanála Ref. ABP-320719-24, Planning Authority Ref. SD24A/0147W) at The Black Lion Public House (a Protected Structure),The application seeks permission for the controlled use of amplified sound, including live music, within the existing pavilion structure, while retaining its approved use as a beer garden ancillary to the existing public house/restaurant. The application is accompanied by an Acoustic Consultant's Report.

The Blacklion Public House (A Protected Structure), Orchard Lane, Clondalkin Village, Dublin 22, D22 E642South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Refused26 March 2026
SD21B/0514

Retention of single storey extension to front, side and rear of existing house, extension with new utility, bedroom and games/storage room; all associated site works.

35, Foxborough Road, Lucan, Co. DublinSouth Dublin County CouncilRetention0 reasons0 conditions2.1 km away
Granted09 March 2022
SD24B/0276W

1. Retention for 11.4sq.m side extension 2. Permission for construction of a 3.7sq.m ground floor extension to the side of existing dwelling.

73, Boot Road, Clondalkin, Dublin 22, D22 N6W2South Dublin County CouncilPermission and Retention0 reasons0 conditions2.1 km away
Granted30 July 2024
SD25A/0270W

Retention of raised illuminated signage to existing shopfront, and projecting illuminated signage. The property is within an Architectural Conservation Area.

5, Main Street, Clondalkin, Dublin 22, D22 PY83South Dublin County CouncilRetention0 reasons0 conditions2.1 km away
Refused06 January 2026
SD24B/0137W

Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, flat roof dormer to the rear and installation of 2no. roof windows to the front

1, Oldbridge Close, Lucan, Co. Dublin, K78 W427South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted22 May 2024
SD23B/0396

Proposed dormer roof window on rear slope of roof & roof light on front slope of roof all at attic level

7, Tullyhall Court, Lucan, Co. DublinSouth Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted07 November 2023
SD21A/0339

Demolition of existing single storey side extension and permission to sub-divide existing house to construct a two storey, semi-detached (end of terrace) house to side; connection to public foul sewer, shared parking space to front and all associated site works.

29, Boot Road, Brideswell Commons, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Refused07 September 2022
SD23B/0424

Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear

14, Orchard Road, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted23 November 2023
SD21B/0357

Construction of new second floor extension to the side of existing dwelling comprising of 2 bedrooms and bathroom and single storey extension to the rear comprising of family room, kitchen and dining room.

14, Orchard Road, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted12 October 2021
SDZ25A/0019W

The proposed development consists of the construction of 233 no. dwellings which are comprised of: 78 no. 2 & 3 bed, 2 storey, detached, semi-detached and terraced houses, 56 no. 2 & 3 bed duplex units in 8 no. 3 storey buildings and 99 no. 1, 2 & 3 bed apartments in 2 no. 3-5 and 4-6 storey buildings. Access to the development will be from two new vehicular accesses from the Ninth Lock Road to the east and via the permitted road network i.e. the Clonburris Northern Link Street, (under Ref. SDZ24A/0033W) which provides access from the Ninth Lock Road to the east and the R113, Fonthill Road to the west. The proposed development will connect into the permitted infrastructural works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) and permitted under Ref. SDZ24A/0033W. The proposed development also provides for all associated site development works and infrastructure to facilitate the development (above and below ground), public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (192 no. spaces), bicycle parking (351 no. spaces), bin & bicycle storage, public lighting, plant (M&E) etc.

West of the Ninth Lock Road and east of the R113, Fonthill Road, Clonburris, Dublin 22South Dublin County CouncilSDZ Application Clonburris0 reasons0 conditions2.1 km away
Granted23 March 2026
SD23A/0246

Remove section of existing grass margin and extend existing concrete apron, install accessible kerb, relocate existing litter bin and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre.

At Bus stop No. 4619 Balgaddy Road (eastbound), Foxborough, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted16 November 2023
SD23A/0247

Remove section of existing grass margin and extend existing concrete apron, extend existing accessible kerb to end of concrete apron and erect a proposed new stainless steel and glass bus shelter, 2.5m x 1.85 x 2.8m high on the public footpath with 2 No. LED illuminated advertising panels each of 2.0 square metre area

Bus Stop No.7386, Balgaddy Road Westbound near No 25 Foxborough Rise ), Balgaddy, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted21 November 2023
SD21A/0282

Retention permission sought for 4 external signs at HSE Primary Healthcare Centre; sign 1 located on right hand side of main entrance pillar from Ninth Lock Road (0.348sq.m); sign 2 located at the left hand side of south-west facade at under-croft archway (1.32sq.m); sign 3 located on the right hand side of the south-west facade at under-croft archway (2.4sq.m); sign 4 located on north-east facade on right hand side of the building (1.109sq.m); total area (5.1773sq.m).

HSE Primary Care Centre, Steeple House, Thornfield Square, Clondalkin, Dublin 22South Dublin County CouncilRetention0 reasons0 conditions2.1 km away
Granted09 December 2021
SD23A/0106

Installation of telecommunications equipment including a pole mounted tri-sector antenna and dish, remote radio units (RRU's), GPS, latchways system, cabinet, steelwork and all associated site development works on the rooftop; The development will provide for high speed wireless data and broadband services.

Steeple House, Thornfield Square, Clondalkin, Dublin 22South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted28 September 2023
SD24B/0461

Planning permission sought for to remove the existing garage to the side of the existing dwelling & replace with a new extended ground floor extension with a new first floor extension over with tiled roofs over to match existing to the side of the existing dwelling; internal alterations to include new attic conversion and associate site works.

54 St. Brigid's Road, Clondalkin, Dublin 22.South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted05 December 2024
SD25B/0672

Planning Permission for a two-storey side and rear extension, along with a single -storey infill rear extension and all associated site works

13, Oldbridge Park, Lucan, Co Dublin, K78NT73South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted30 January 2026
SD26B/0129W

Conversion of existing attic to non-habitable space including raised gable to mini-hip, dormer to rear, window to side & velux to front of existing dwelling.

2, Oldbridge Green, Lucan, DublinSouth Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted14 May 2026
SD18A/0134/EP2

Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.

Grange Castle Business Park, Clondalkin, Dublin 22South Dublin County CouncilExtension Of Duration Of Permission0 reasons0 conditions2.1 km away
Granted08 November 2023
SD18A/0134/EP

Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.

Grange Castle Business Park, Clondalkin, Dublin 22South Dublin County CouncilExtension Of Duration Of Permission0 reasons0 conditions2.1 km away
Refused07 September 2023
SD23B/0026

Demolish existing rear store, partial deconstruction of single storey rear extension and some internal elements; New two storey frontal extension and first floor extension over existing garage attached to the side of house with partial garage conversion to habitable space, front section of garage retained as store area, modifications to existing rear extension, such alterations include new window and door arrangement with a floating window / seat feature to its side elevation, some general internal alterations and improvements on ground and first floor levels, attic conversion to storage space.

7, Saint Anthony’s Avenue, Clondalkin, Dublin 22, D22FH66South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted23 March 2023
SD21B/0336

Construction of an attic conversion along with rear dormer and associated alterations to the profile of the existing roof and retention of the covered area / lean to roof to the side of the house.

19, Haydens Park Glade, Lucan, Co. DublinSouth Dublin County CouncilPermission and Retention0 reasons0 conditions2.1 km away
Granted03 August 2021
SD20A/0295/EP

Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.

Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22South Dublin County CouncilExtension Of Duration Of Permission0 reasons0 conditions2.1 km away
Granted26 May 2026
SD20A/0295

Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.

Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22South Dublin County CouncilPermission and Retention0 reasons0 conditions2.1 km away
Granted16 March 2021
SD21A/0236

Amalgamation of units F2 and F3 (with connecting doors at ground and first floor levels) and its use for warehouse and distribution with ancillary trade counter and showroom at ground and first floor levels; Retention of offices at second floor level which are ancillary to the overall warehouse operation; Retention of all signage and external illumination of the signage.

Units F2 & F3, Weatherwell Business Park, Clondalkin, Dublin 22South Dublin County CouncilRetention0 reasons0 conditions2.1 km away
Granted24 November 2021
SD24B/0034

Single storey extension to front; Two storey extension to side; New pedestrian access to rear from side and all associated site works.

33, Rossberry Avenue, Lucan, Co. DublinSouth Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Refused27 March 2024
SD21A/0183

Retention of internal layout changes which include removal of internal walls to extend class 2; modification to toilet to classroom 2 to extend toilet area; addition of corridor with addition of office and storage to class 1; external change of south elevation change from window to external door to access class 3 all with ancillary works.

29, Boot Road, Brideswell Commons, Dublin 22South Dublin County CouncilRetention0 reasons0 conditions2.1 km away
Granted26 August 2021
SD21A/0317

Demolish part of the modern extension constructed at the southern end of the original school building in order to construct a new single storey extension to accommodate a unit for children with special needs; ancillary works will include modifications to the original classroom block and the provision of new car parking spaces in the western forecourt area.

St Joseph's Boys National School, Boot Road, D22PY13South Dublin County CouncilPermission0 reasons0 conditions2.1 km away
Granted24 August 2022
Showing 301-350 of 29,704
Page 7 of 20