To construct a new dwelling house and private garage, new entrance and install a new wastewater treatment system along with all associated site works
For a development comprising 20 no. residential units, (6 no. detached houses, 10 no. semi-detached houses, 4 no. Duplex units), ancillary surface car parking, vehicular & pedestrian access to the proposed development via the existing residential development to the north of the site which is under construction (planning ref; 19/939), connection to public water supply; foul water drainage services including the provision of surface water attenuation and all associated site development and landscape works on lands at Bunratty West, Bunratty, Co. Clare. Works to Include alterations to the previously approved planning ref; 19/939, alterations include revised parking, road, footpath and open space where both residential schemes ajoin. The planning application is accompanied by a Natura Impact Statement (NIS)
For internal changes, replacement of thatch roof with natural slate and to retain external dining area with retractable roof and windows
For demolition of existing dwelling house, construction of a new dwelling house and garage along with all associated works
To make the following changes to the existing dwelling house a) demolish existing rear extension; b) construct new rear extension; c) elevational changes; d) all associated site works
Of dwellinghouse, garage, septic tank, site boundaries and public road access, as constructed
To construct an extension to the rear of the existing dwelling house along with all associated site works and services
To construct a new dwelling house to include a waste water treatment system, new entrance to dwelling site to include reconfiguration of the existing site entrance, driveway and associated site works
For development which will consist of alterations, rear extension and change of use of existing domestic garage to a granny flat accommodation, along with ancillary works
To construct an extension incorporating existing garage space into extended ground floor by means of a new extension
For development which will consist of the construction of a dwelling house, a proprietary waste water treatment system and ancillary site works
To build an extension to the rear of the existing dwelling house and all associated site and ancillary works
For refurbishment works to existing coastal defence embankments at Shannon Airport, Shannon, Rineanna South, Co Clare. The proposed works include different combinations of armouring, top-soiling and grassing along the embankments. A Natura Impact Statement has been prepared and is included in the application. An Environmental Impact Assessment screening report has been prepared and is included in the application. It concluded that an Environmental Impact Assessment is not required
For development, the development consists of the construction of a milking parlour, slatted cubicle unit and associated site works
To construct 2 no. detached dwelling houses complete with detached domestic garages, effluent treatment systems, vehicular entrances, including all associated site works and services at Deerpark / Corlack Cluster, Sixmilebridge (as defined in the Clare County Development Plan 2017-2023)
Is sought to construct a detached dwelling house, domestic garage, effluent treatment system, vehicular access including all associated site works & services
For development comprising the regeneration of an existing brownfield site at the site of the former Shannon Shamrock Hotel at Bunratty, Co. Clare. A seven year planning permission is sought to demolish the existing hotel and ancillary outbuildings and to provide for the phased delivery of a mixed use development including provision of: (a) 67 no. residential units comprising 20 no. 2 bed houses and 47 no. 3 bed houses; (b) 1 no. convenience retail store of 470sqm (net) floor area; (c) 6 no. retail / office units including 4 no. units of 167sqm (net) floor area and 2 no. retail / office units of 231sqm (net) floor area intended to accommodate Class 1 & Class 2 Uses; (d) a bat house; and (e) all ancillary site development works including (i) car & bicycle parking; (ii) bin storage; (iii) signage; (iv) 2 no. ESB sub-stations; and (v) public lighting. The existing conference centre building shall be retained on site and shall form part of a future phase of development. The application is accompanied by a Natura Impact Statement
The development consists of the erection of a 68m linear, glazed and covered passenger walkway from departure gates area 1-5 to aircraft parking stand 26B
For the change of use of existing detached garage to granny flat with disabled access including alterations to existing building, connection to existing services & all ancillary site works
For the demolition of existing metal framed cladded canopy within their lands at Shannon Airport and associated site clearance works along with all other site works to allow for future development on the site
The development will consist of: (A) Works to the existing two storey, stone building, to the north-east of the site which is located within the curtilage of a protected structure. The renovation and general repair to the existing stone building; the provision of a new sanitary facility and entrance lobby, confined to a single storey, timber clad extension to the north façade of the existing structure, increasing the total floor area of the structure from 47sqm to 58sqm; the provision of an external stairs to the west of the stone building; the provision of 3 No. Car Parking Spaces (Includes 1 No. Disabled Car Parking Space); the provision of street lighting to the north of the existing structure; the change of use of the existing stone structure from its former use as an art gallery, to its proposed use as a bar. (B) The provision of a pergola structure, with an overall height of 3.43m, and with a footprint of 41m2, positioned adjacent to the existing entrance to the bar at Bunratty Castel Hotel on the south façade of the hotel. The pergola structure will consist of a powder-coated finish with a timber soffit, works include all associated site and development works above and below ground. (C) The provision of a 4no. street lamps, with an overall height of 5.5m to the rear entrance road on the North of Bunratty Castle hotel. Works to include all associated site and development works above and below ground.
For PERMISSION for development and RETENTION permission for development at a 3.078 Ha site at Bunratty Castle Hotel, Bunratty, Co Clare V95 DW9N (a Protected Structure) The development consists of the RETENTION of works which were undertaken to rationalise, upgrade and repair (principally required as a result of fire damage) part of the existing hotel which has resulted in an increase in Ground Floor Area from c. 1,457 sq m to c1,681 sq m. The works subject to RETENTION permission principally include: the removal of selected internal and external walls, and external structures (c. 120 sq m); the reconfiguration of selected internal spaces; the construction of a single storey extension which links to a fire escape core to the rear of the hotel (totalling c. 150 sq m); the infilling of an internal courtyard to provide an internal extension (c. 56 sq m): the removal of 3 No. bedrooms, 2 No. offices and 2 No. stores at First Floor Level to provide a double height space below (c. 162 sq m); the removal of external fire escape stairs; the removal of proprietary metal steps on roof; the removal of plant including a water storage tank and enclosure and kitchen extract plant on roof; the removal of part of flat roof and associated roof lights and the provision of new flat roof; elevational changes; and landscaping. The development will also consist of: the provision of a new extended(c. 10.5 sq m) frontage to bar/bistro with full height doors/glazing panels and an entrance lobby with retractable awning on the southern elevation; the reconfiguration of selected internal spaces; the insertion of new windows in lieu of selected existing windows; the provision of part new flat roof; the provision of rooflights; the provision of plant including a new water storage tank and enclosure, and fire escape walkway on roof; the reconfiguration of the existing car parking resulting in an increase in the number of spaces from 140 No. to 152 No.; the provision of bicycle parking spaces; elevational changes; boundary treatments and landscaping; and all associated site and development works above and below ground
For development and RETENTION permission for development at a 0.153 Ha site at Bunratty Castle Hotel, Bunratty, Co Clare V95 DW9N (a Protected Structure). The development will consist of: the construction of a single storey extension (150 sq m) to the front (south) of the existing function room to be used as a pre-function room; the provision of an external terrace principally to the south and east of the pre-function room; the provision of an extension to the existing raised terrace to the front (south) of the bar/bistro; elevational changes to the existing function room; plant; hard and soft landscaping; boundary treatments; signage; and all associated site and development works above and below ground. The development subject to RETENTION permission consists of: the removal of 5 No. car parking spaces; and the provision of a retaining wall which will form the boundary of the external terrace to the pre-function room
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services
For development - the development consists of the construction of a calving unit, extension to existing silage slab with new silage wall and associated site works
To construct an extension to existing dwelling to comprise of kitchen/dining room/livingroom, W.C. & utility. Application also for permission to demolish existing utility at rear of dwelling including all associated site development works
To construct a domestic garage to the rear of the existing dwelling including all associated site development works
For permanent retention of prefabricated single storey flat roof extension to rear and side of the existing school house building previously granted temporary permission under planning permission Ref: P19/878 and for the provision of additional prefabricated single storey flat roof extension to side of existing school building and all ancillary site works at School House, Bunratty Castle & Folk Park, Bunratty, Co. Clare.
To construct a single storey dwelling house, wastewater treatment system /soil polishing filter and all associated site works.
To carry out - A number of internal layout modifications within the existing building, - Construct a bar / restaurant area extension with associated external terrace areas, - Remove the various existing service yard structures to the north, - Construct a new service and keg room building, service yard wall, bin compound wall and universal access WC, - Refurbish and reuse the existing Keg Room building as a Tea / Coffee / Snack / Merchandise Outlet at ground and first floor level (public road level) and to construct a storage room extension at ground floor level and a new shopfront / entrance extension, balcony and stairs at first floor level (public road level) and a new pedestrian access and crossover from the public footpath on the old Limerick / Shannon Road (L3126). - Install new signage, new connections to existing site services and all associated site works
Of a food truck and associated seating area.
For development which will consist of a single-storey extension to existing Gates 1 to 5 departures terminal, provision of external plant area and covered external circulation routes. Other works include minor elevational changes to adjacent areas and alterations to personnel access/egress locations and routes with all associated site works
For development which will consist of the demolition of existing single storey administration offices, consolidation/protection works to the western end of the shared services building, the removal and upgrade of the facade to the eastern end of the main terminal building over 2 no. stories, the reconfiguration of the existing Airside personnel and passenger entrance/egress locations, new security fencing, hard and soft landscaping, with the provision of wayfinding and branding signage, including all associated site works. Demolition works will be carried out within the curtilage of a Protected Structure (RPS No.: 328)
To a) demolish existing detached garage, b) construct single storey extension to the existing dwelling house and c) make modifications to the internal layout of the existing dwelling house including all ancillary site services
For the change of house design to comprise of extension to rear to incorporate bathroom, ensuite and redesign of utility and also including minor front elevation changes from that granted under planning permission reference Number 18/374
The development which will consist of the installation of a compact modular substation and ancillary site development works; to facilitate 4 no. shared electric vehicle charging units and 8 no. charging bays; and ancillary site works within a partially reconfigured area; and the installation of signage. This site is located within the curtilage of Bunratty Castle Hotel (Protected Structure, RPS No. 077).
To construct a granny flat to the rear of the existing dwelling along with any other ancillary works
For development at both the Shannon College of Hotel Management Trust Building and the Shannon College of Hotel Management Food & Beverage buildings, located at Shannon Airport, Rineanna South, Shannon, Co. Clare, which will consist of the following: 1. Removal of all current signage on the exterior of both buildings. 2. Erection of 1 no. signage (5.89m x 2.745m) on the southeast elevation of the Shannon College of Hotel Management Food and Beverage Building. 3.Erection of 1 no. signage (14.505m x 1.86m) on the northeast elevation of the Shannon College of Hotel Management Trust Building. 4. Erection of 1 no signage (5.925m x 2.87m) on the southeast elevation of the Shannon College of Hotel Management Trust Building.
Of existing canopy, food truck and coffee dock and signage for the same in front of the Jilly & Joe's Restaurant & Courtyard at the Meadows & Byrne Courtyard as well as external toilets in container at the back of Jilly & Joe's Restaurant & Courtyard near the chocolate shop at the Meadows & Byrne Courtyard
To (a) Construct and extension to existing warehouse facility which will consist of offices, warehousing / distribution space along with sanitary and welfare facilities, (b) Construct increased parking and turning areas (c) Install new wastewater treatment system and soil polishing filter together with all associated site development works and services
For the following items: RETENTION of a later edition extension to the rear of an existing original house, consisting of 1 additional bedroom at ground floor level and additional bedrooms at first floor or attic level when the new roof was being constructed (Circa 15 years ago), including velux roof lights to the side and a minor modification to the site boundary to ensure the septic tank and its associated percolation area fall within the house lands, and all associated site works on and under land
For development, the development will consist of the construction of a private single dwelling house, detached garage, waste water treatment system, percolation area and all other ancillary site works associated with this proposed development
Of an enclosed Garden Centre comprising 2 repurposed shipping containers and clear covered plant area, along with benches and plant display tables.
For the construction of a storey & half extension to existing dwelling to include 3 no. bedrooms, 2 bathrooms, utility, study, store & link corridor. Permission is also sought for the demolition of rear extension & side extensions & for permission for alterations and renovation of existing dwelling house & for the installation of treatment plant & percolation area including all ancillary site works
To Extend the Appropriate Period for Planning Permission P16/555 for the construction of a tyre repair and replacement garage facility including ancillary site works
To RETAIN the use of part of existing retail shop for off-licence use and to RETAIN new exterior signage and all ancillary site works
For ground investigation (GI) works, to inform the option selection and design of the proposed Shannon Town and Environs Flood Relief Scheme at Rineanna South, Shannon, Co Clare. The objective of the GI works is to establish ground conditions within the study area and contribute towards the option selection process for the proposed FRS. The GI sites are primarily located within or adjacent to existing flood embankments on the edge of the River Shannon estuary in proximity to residential and industrial areas. The proposed preliminary GI works will consist of the following: a) 54 No Borehole Cable Percussion (BHCP) (shell and auger); b) 65 No. Rotary Cores; c) 62 No. Cone Penetration Tests (CPTS); and, d) 25 No. Groundwater Standpipes. This application is accompanied by a Natura Impact Statement (NIS)
To A) Retain existing Granny Flat, garage & sheds. B) Construct extension and carry out alterations and fenestration changes to existing granny flat together with all associated site development works and services
To construct a new dwelling house, domestic garage, and a wastewater treatment system with percolation area and soil polishing filter, along with a new vehicular entrance/exit to serve the proposed dwelling. The application will also include modifications to the existing entrance serving the existing cottage, connection to the public water supply, and all associated site development works and services necessary to facilitate the proposed development
For the following 1. Replacement of existing rear extension with new two storey extension to rear and side, 2. new entrance gate, piers and parking area, including adjustment to existing boundary wall 3. minor modifications to existing elevations 4. demolition of single storey flat roof garage to side of dwelling 5. replace existing effluent with new effluent treatment system and percolation area 6. and all necessary site works and services