Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
Development on a site of c. 0.021 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground fire fighting storage tank.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs and flat roof dormer to the rear.
The development will consist of converting the existing two bedroom detached single storey bungalow to a two storey three bedroom detached house and all associated site works, through the construction of a new additional first floor storey to the existing single storey house with a new pitched roof over, consisting of an attic conversion and rear roof dormer.
Retention planning permission for widened vehicle access to front of existing house
Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.
Change of use from cold storage to light industrial use.
The development seeking permission will consist of the widening the existing vehicular entrance at the front of the property to 3.5m in width.
The sub-division of a vacant commercial/retail unit measuring 309.4 sq.m m; the change of use of Unit No. 2 to an education/day centre use (142.3 sq.m m); and associated signage.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Part off-licence use in existing retail unit.
1) The expansion of the existing Warehouse facility through the construction of a 2320m2 x 1Sm high single storey structure to the West of and adjoining the existing facility. This extension shall house ambient and temperature controlled storage zones and shall be served by three Articulated Vehicle loading docks on its Northern elevation as well as on grade loading doors on the Western Elevation. The building shall be clad in plastisol coated insulated metal cladding and shall house solar panels on its roof. 2 )The rationalisation of the existing delivery vehicle loading area through the expansion of the existing loading docks on the Northern elevation measuring 536.28m2 x 6.9m high and containing individual Rigid vehicle loading docks. The building shall be ct4 in plastisol coated insulated metal cladding. 3) The extension of the existing yard area on the Western side of the site to accommodate Vehicle loading and the relocation of the existing Compactor Building and workshop to the South West comer of the site 4) The extension of the existing Staff and Visitor car park on the Eastern side of the site 5) Alteration to Boundary treatment to Robinwood Road through the realignment of the existing wall and the installation of a new pedestrian and bicycle access at the North West Comer of the site. 6) The installation of two levels of new fenestration to the Eastern Elevation of the existing building. 7) The installation of a new underground surface water attenuation system beneath the new Western yard complete with petrol interceptor and hydro brake to augment the existing site systems.
Mabelground Limited intend to apply for permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.2 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. The proposed amendments comprise revisions to the permitted site entrance from Airton Road to the north including the provision of a new island and dished kerbs.
Demolition of the existing industrial buildings on site (4,800sq.m) and the construction of 2 blocks comprising: 328 apartments (93 1-bed, 222 2-bed and 13 3-bed), ancillary residential support facilities and commercial floorspace measuring 31,147sq.m gross floor space above a single basement level measuring 5,861sq.m. Block A is a part-5 to part-7 storey (13,710sq.m) over basement block comprising 149 apartments with office space (222sq.m). Block B is a part-6 to part-9 storey (17,437sq.m) over basement block comprising 179 apartments, 2 double-height retail/commercial (Class 1/Class 2) units (354sq.m), a café/restaurant (313sq.m), a creche (360sq.m), internal residents amenity area (644sq.m) at ground floor including reception (37.7sq.m), residents lounge (91.3sq.m), private dining area (52.6sq.m), co-working space (45.5sq.m), games room (47.3sq.m), gym (80sq.m) and communal lounge (220sq.m) at 6th floor level. The development also consists of the provision of a landscaped courtyard; public plaza at the corner of Airton and Belgard Road; pedestrian access from Airton Road to the Technological University campus; balconies; landscaped roof terrace at 6th floor level (7th Storey) of Block B (671sq.m); 184 car parking spaces at basement level including 14 club car spaces, 10 disabled parking spaces and 4 creche parking spaces; 727 basement and surface bicycle parking spaces; 4 motorbike parking spaces; bin storage; boundary treatments; green roofs; hard and soft landscaping; plant; lighting; Vodafone cabin sub-station; ESB sub-stations, switch rooms and generators; and all other associated site works above and below ground.
Mabelground Limited intend to apply for retention permission for development (Large-scale Residential Development (LRD)) comprising amendments to a permitted Strategic Housing Development (SHD) as granted under ABP Reg. Ref. ABP-305763-19 at this c. 1.19 Ha. site at the corner of Airton Road and Belgard Road, Tallaght, Dublin 24, D24 HD35. Retention permission is sought for the following modifications: The amalgamation of 2 No. retail/commercial units (178.5 sq m and 175.4 sq m) to create one larger unit, and the relocation of the ESB substation and switch room from the southern boundary into the retail/commercial floorspace (total retail/commercial unit floorspace is 310 sq m); shell and core provided to the permitted creche (fit-out subject to tenant requirements); modifications to the height of the scheme including a minor increase to the finished floor levels, minor adjustment to the parapet heights including a slight increase of one section of roof by 125mm in Block B, minor increase in the height of the roof level amenity space by 500mm, and increase in the height of a staircore by 2.3 metres at roof level; revised roof design layout including an amended PV panel layout, increased green roof provision from 2,490 sq m to 2,576 sq m (increase of 86 sq m), reduction in plant, and provision of railings to the roof terrace amenity space; removal of the second private terrace accessed from bedroom No. 3 of Unit No. AG.105; removal of en-suite bathrooms from Unit Nos. B1.302, B1.303, B1.307, B2.301, B2.302, B2.303, B2.307, B3.301, B3.302, B3.307, B4.301, B4.302, B4.307, B5.301, B5.302 and B5.307; removal of stairs leading from the surface level courtyard to the basement; modifications to the landscaping strategy for fire safety including the addition of ventilation for the basement and adjustments to the landscaping layout at surface level; elevational changes including amendments to the material finishes, and provision of additional fire escapes on the western elevation; minor internal design changes including the provision of a metering room in lieu of 9 sq m of creche floor area, reconfiguration of staircores, reconfiguration of the refuse store, bicycle parking and disabled parking at basement level, and the provision of an attenuation tank at basement level; and all associated development works above and below ground.
Construction of a new bus interchange to replace that existing at Red Cow Luas park and ride car park. The proposed works consist of the provision of 9 new sawtooth type bus bays, bus shelters, overhead canopies, a bicycle building, passenger and driver welfare facilities, and an electrical substation. A new carriageway arrangement for bus access and circulation including a reconfiguration of the western car park layout to allow for provision of taxi and drop off facilities is also proposed. The proposed works also include minor realignment of the park and ride access road between the mini roundabout entrance to the western car park and the mini roundabout entrance to the eastern car park. The existing Luas stop, depot building, surface parking facilities and bus interchange were originally granted permission under LRO 59 of 1999.
Construction of single storey extension to the front, rear and side comprising of storage, utility, living and dining area; Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, flat roof dormer to the rear & WC; Conversion of front garden driveway with modification to front wall and public path.
Provision of 1 approx. 100sq.m single storey temporary prefab (prefab 01 comprising 1 classroom & 3 resource rooms) adjacent to the south-east boundary of the site and 1 approx. 70sq.m single storey temporary prefab (prefab 02 comprising 1 classroom) adjacent to the north-west boundary of the site and all associated site works.
Construction of a new approx. 592 sqm single storey extension to the Junior National School to provide a new SEN suite comprising 2 no. classroom bases, a central activities space, shower & WC facilities, ancillary spaces and a new external play areas and a new approx. 345 sqm part-two storey extension to the Senior National School comprising 3 no. en-suite new mainstream classrooms and 2 no. resource rooms. Along with a remodelled car park increasing the number of car spaces from 35 no. to 45 no. and associated site works.
Sud-division of unit previously granted planning permission under planning Ref. SD16A/0065 into two separate units; minor internal alterations to layout of the previous grant.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
Alterations to the building to facilitate the conversion of the existing Test Centre into a ''Drive - Through'' Test Centre in line with incoming RSA/CVRT regulatory policy. The alterations are mostly internal, including the re-positioning of partitions and the vehicular test equipment to facilitate the proposed 'drive - through' circulation route. Externally, there are alterations to the front facade including the removal of the glazed screen of the existing disused showroom and the insertion in that area of two new vehicular openings that will be similar to the one existing vehicular opening.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
Extend the existing service workshop to provide additional service bays and covered secure parking.
Extend the existing service workshop to provide additional service bays and covered secure parking.
Demolition of an existing single storey office building (total area of 647.62m2, 4.38m high) ancillary to the existing crane hire business with this area returning to yard area.
Removal of existing shed; construction of a detached two storey, three bedroom dwelling with rooflights to front; reconfiguration and widening of existing vehicular access; new vehicular access to the new house and all associated site works.
Retention permission for partial Ground Floor side extension with flat roof over. Permission for partial ground floor side extension with flat roof over, ground floor front extension with pitched roof over. Attic conversion with WC, Window in gable wall at attic level &dormer roof window on rear slope of roof at attic level
The provision of a single storey prefabricated Dublin Bus Drivers welfare facility to incorporate a self - cleaning unisex WC, this facility is approx. 7.13 square meters together with all associated site works
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
New vehicular access to driveway and all associated works to front of existing house.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
The relocation of the use of the existing apprentice joinery workshop training centre for young apprentices from its existing location on site to warehouse unit 2 involving the change of use from warehouse to apprentice joinery workshop training centre and all ancillary internal and external works including the extension of the first floor mezzanine of 747sq.m, minor modifications of the front entrance and provision of a canopy with integrated signage and provision of a waste wood store for recycling as fule for the boiler 29sq.m and dust containment at the rear, the overall GFA is 2,319sq.m; The use of the existing joinery workshop training centre will remain as a training centre for Sisk employees use and include general storage area at ground floor and minor internal and external works will be carried out comprising internally the extension of the first floor level mezzanine by 291sq.m from the existing mezzanine of 234sq.m to 525sq.m and externally the upgrading, cladding and improvements to fenestration of the external elevations, the overall GFA is 1346sq.m.
Single-storey, flat-roof front extension with two rooflights and a new side door at ground level.
Erection and installation of an exhaust ventilation duct to the front of existing Community, Cultural and Sports Club Facility including the installation of a new exhaust duct from the ground floor kitchen existing through to the existing front elevation and extending past the roof; all associated ancillary site works.
Replacement of existing asbestos roof covering with a new Kingspan insulated roof panels; replacement of rooflights with new and installation of a roof mounted solar photovoltaic panels to include all ancillary works and services.
Installation of a new canopy roof to the south side of the existing Heiton Steel warehouse and all associated site works.
A bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new window to front gable; new access stairs; new roof window to the front and rear; flat roof dormer to rear.
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.
A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.
Construction of additional floor area of 192.43sqm to existing warehouse and office building of 1658.44sqm, alterations to layout of 152.11sqm of existing warehouse and alterations to existing parking layout to accommodate disabled parking. New first floor of 169.75sqm internally in existing warehouse, internal alterations at ground level, 2 storey extension to southern elevation of existing warehouse to accommodate new entrance lobby and all associated site works.
A new single storey side and rear extension, with new flat roof, and flat roof windows, comprising of a family room, raise existing garage wall to meet new roof level and all associated site works.
Provision of a vehicle entrance door to the front elevation.
Erection of signage on the front (southern elevation) of the building, including a trough light for external illumination of the sign at first floor level; reuse of the existing signage structure at the southern, roadside boundary of the site for user and directional signage; this will be a double sided sign; all associated works. The proposed signage relates to the use permitted under Reg. Ref. SD21A/0003.
The change of use and conversion of existing attic space to storage space with dormer window to the rear, hipped roof to new gable wall, with ground floor single storey extension to the rear, and conversation of the side garage to habitable space with minor alterations to the front elevation, internal layout adjustments and all associated ancillary site works at 30 Bancroft Avenue Dublin 24, D24 XWE0.
Conversion of existing attic space to habitable space; works include 1 new window to the front elevation; 1 new window with obscured glazing to the side elevation and 2 'Velux' windows to the rear roof.
Change of use of the second floor of the subject building to a Dental Practice comprising of 2 surgery rooms, offices, waiting room/reception, sterilisation room and toilets and ancillary site works.
Construction of 2 office rooms at attic level with dormer structure to the rear, 2 rooflights to the front, 1 rooflight on the side and relocation of solar panels to south elevation and all associated site works.