Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Change of use of the fifth floor level from office to hotel use to provide for 26 hotel suites; Associated modifications to the layout and elevations at fifth floor level and to the stair cores at ground to fifth floor levels to facilitate access and egress; Introduction of lobbies to the stair cores at basement level; Provision of a green roof to the existing building on site; Revisions to the existing car and bicycle parking arrangements at basement level; All associated site development works.
Conversion of existing attic space comprising of modification of existing roof structure; raise existing gable c/w window; new access stairs and flat roof dormer to the rear.
The development will consist of the conversion of existing attic space to a new dormer bedroom with ensuite bathroom and storage. The work includes a 3-meter-wide box dormer to the front elevation and Velux windows to rear of the existing roof, together with all associated site works and services
Amendment to existing planning permission: change of style of the new house already granted under SD21A/0233 in the side garden to have a more traditional design and layout.
Erection of a detached, 2 storey 4-bedroom dwelling (154.87sq.m); a new single disabled car parking space; solar PV panels (10.3sq.m); new entrance and amended drainage landscape and boundary treatment to facilitate the development.
Erection of two semi-detached two storey dwellings; one three bedroom house and one two bedroom house with adjacent two car space garage; drainage and amendments to existing landscape and boundaries.
Double height single storey extension for use as a reception area, waiting area and ancillary storage space; external modifications to the existing building facade including upgrading the existing facade finishes, inclusion of new glazed sections and upgrading of existing external windows and door; internal modification to the existing building layout; external landscaping including upgrading of the pedestrian walkway from the existing car parking area; all other associated ancillary site works.
Provision of a shopping trolley bay, and remove existing, and associated works at the surface level carpark of the Arena Centre, Whitestown Way, Dublin 24
New SDCC maintenance-vehicle access gate in the existing fence between the Church of Scientology and Dodder Park, with landscaping & play items in the area of the park between the Dodder River and the existing fence; retention of the existing 2.5 metres high perimeter fence around the Church of Scientology occupied property, to include the omission of a pedestrian gate and fence plinth.
Retention Permission for timber cabin used as art studio with sessional art classes to rear of existing house
Construction of new first floor extension to the side of existing dwelling comprising of bedroom and enlarging of existing bedroom and single storey rear extension comprising of family room & kitchen.
Residential development comprising 138 dwellings on a site area of 5.06 hectares; access to the development will be via a proposed new vehicular entrance from Oldcourt Road. The proposed development is comprised of 13 4-bed, 2 storey detached houses; 92 3 & 4 bed, 2 storey semi-detached houses; 25 3-bed, 2 storey terraced houses and 8 apartments in 4 2-storey end of terrace units; all associated site development and infrastructural works, car parking, open spaces and landscaping.
Conversion of the existing attic into habitable space; Construction of the 3 meter wide dormer window to the front roof; Rooflights to the rear roof, SUDS drainage and all associated works necessary to facilitate the development.
Construction of first floor extension to the side and rear of existing dwelling comprising of bedroom, bathroom and office.
Construction of dormer window to the front elevation roof and conversion of the attic into a new bedroom and en-suite.
Alterations to the front of existing property including a porch extension and front living room extension; alterations to the front boundary treatment with the installation of an iron rail boundary fence; alteration to existing vehicular entrance gate and provide additional off-street parking within curtilage of the property.
Ground floor rear & partial side extension with pitched roof over with 2 roof lights & gate in side boundary wall.
Ground floor front porch with pitched roof over & widening of vehicular entrance in front boundary wall.
2 storey extension to the rear; first floor extension over existing ground floor to side of existing house along with extending the roof at the back and a new dormer window to the back of the house.
Two storey extension to the rear with an extended area at ground floor to the kitchen / dining room area; a first floor extension to side over the existing ground floor along with alterations to the roof to extend to the back, side and front of the house with a new dormer window and rooflight to the back of the house
Construction of new dormer window to the front roof elevation and conversion of the attic into new bedroom and ensuite.
Conversion of existing attic space to non-habitable space with alterations to roof from hipped roof to mini hip. Velux roof light to front. Flat roof dormer to rear window to side and all associated siteworks
First floor extension over previously granted porch extension SD18B/0186 with apex roof to face entrance; conversion of existing attic space to non-habitable space with alterations from hipped roof to apex roof facing public green; flat roof dormer to rear and all associated site works.
Single storey porch extension to the front of existing dwelling and all ancillary site works.
Change of use from coffee shop to hot food takeaway.
Mixed use commercial extension (9,956sq.m gross floor space) to the southern side of The Square Shopping Centre and a new public plaza and all associated site and development works including new signage; Level 1 - no changes; Level 2 - removal of southern mall entrance lobby and construction of new extension to existing Level 2 mall to include 6 retail units (2,611sq.m), a food hall/market hall area for multiple restaurant/food and beverage type uses with associated seating areas (2,041sq.m), a restaurant/cafe unit (67sq.m) and associated ancillary accommodation and circulation (1,534sq.m) and plant rooms (176sq.m) and introduction of new internal service corridor; Level 2 extension is replacing surface parking spaces (140) to the south of the shopping centre and an existing parking area (34 spaces) to the east of the proposed extension is to be reconfigured; creation of Level 3 entrance and creation of new public plaza to replace roof car park (111 spaces) and the new outdoor public plaza (0.74ha) will be used for multi-purpose events, civic and recreational uses and retail and food and beverage concessions involving temporary moveable structures erected on a seasonal basis; the creation of the new Level 3 entrance involves replacement of existing retail unit at Level 3 (Unit 307A) with mall area to include flexible kiosk type retail concession areas; 2 buildings accommodating 9 restaurant/bar units (3,324sq.m) and ancillary accommodation (175sq.m) and associated outdoor seating areas in the new plaza on south facing terraces; Level 4 - ancillary accommodation and service areas (28sq.m) on roof of 2 restaurants buildings within provision for screened plant areas and solar panels; the proposed extension has a maximum building height of 18 metres above existing ground levels; the extension is to replace and supersede the Plot B development previously permitted under Reg. Ref. SD13A/0192 (Bod Ref. PL06S.243280) which included a gross floor space of 5,684sq.m; the permitted northern extension (Plot A) remains unchanged. Permission is sought to amend Condition 3(a) of the Reg. Ref. SD13A/0132 (Bord Ref. PL06S.243280) to facilitate the construction of the proposed southern extension prior to the permitted northern extension (Plot A) subject to a phasing programme to be agreed.
An Attic Conversion with dormer roof to rear, plus changing of existing roof profile from hipped to new mini Dutch roof plus two number Velux roof lights to front roof slope plus a single storey side/rear extension plus internal alterations and the construction of a polycarbonate roof structure to the side passage and all associated site works
Second storey extension to the rear of the existing dwelling and conversion of existing attic space to study/store room; existing hipped roof will be converted to a gable end wall and reduced hip roof above.
The development seeking retention consists of the construction of a fence on top of the existing block wall along the side and rear boundaries of the property
A single storey extension to the rear, side and part of the front of our house. The rear extension will consist of a kitchen / dining area, the corner of the proposed extension will be a utility room while the side of the extension will accommodate a downstairs wet room / wc, a home office and a bedroom. The front portion of the proposed extension will project to the front of the existing house to allow the access door to be positioned to the side away from the prevailing winds. The existing ground floor area is 52.94 sq.m. and the proposed wrap around extension will add 70.96 sq.m. Giving a total ground floor area of 123.90 sq.m. The first floor area will be unaltered at 49.59 sq.m. All ancillary site works associated with the above proposal.
Ground floor rear & side extension with flat roof over & 1No. Roof light over. Window in gable wall at ground floor level. Internal Alterations at ground floor.
Two bedroom, double storey house.
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
The construction of a single storey extention to the front of existing 2-storey mid terrace and all associated site works.
Provision of 2 double sided projecting signs to the northern elevation at the existing mall entrance.
A 68.6sqm internal extension to the existing first floor, alterations to front elevation to include new sliding doors and change of use of the entire building from motor sales workshops to funeral home support services.
Construction of single storey extension to the front of existing dwelling comprising of new entrance hallway and sitting room extension and all associated site works.
Demolition of single storey timber frame extension; demolition of disused chimney stack both to side of existing dwelling; construction of single storey ground floor extension to front; construction of ground floor extension to rear of existing dwelling with first floor extension partially over and all associated site works.
Proposed expansion of use of existing ground floor level shared studio room (68.9sq.m.) within the Community Centre to allow for an additional pre-school / Montessori classroom for up to 24 children between the hours of of 9.00am to 1.00pm, associated with adjoining childcare facilities within the Millenium Building at Firhouse Community & Leisure Centre.
Development will consist of the conversion of the existing roof space comprising of modification of existing roof structure, raising existing cable to dutch hip, new access stairs and flat roof dormer to the rear with a window facing South and a window facing East
Subdivision of the existing site into two; demolition of existing garage to southern side of house; construction of two storey, three bedroom house with attic level storage space incorporating rooflights located on southern side of existing house; modification of existing entrance and driveway to facilitate proposed house; construction of new entrance and driveway on northern side of site to facilitate existing house; all associated site works.
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
A) Alterations to existing south elevation including removal of window, widening of existing window opening, installation of new entrance door and glazed screen; b) Reconfiguration of existing ramp and steps; c) Relocation of existing ATM and canopy from south elevation to the west elevation including new stone surround to match existing; d) Alterations to existing signage to include relocation of existing sign over entrance to over new entrance and relocation of existing projecting sign to new position on south elevation.
Provision of an ancillary off-license sales area of c. 63.61 sq.m in the ground floor retail unit.
Conversion of existing attic to non-habitable space, raising of existing gable to form mini hip roof, window to side, velux to front & dormer to rear of existing dwelling.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e., off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 10.sq.m and is ancillary to the primary retail use.
Change of use of Unit 3 from retail use at ground and first floor level to takeaway restaurant, including ancillary seating area and back of house areas at ground and first floor level and associated signage.
Retention of Veterinary Centre use in Unit 14 and change of use from shop to Veterinary Centre in Unit 15.