Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site works
The demolition of a single storey house and the erection of a terrace of four two-storey houses and a terrace of three two-storey houses (both terraces to have first floor balconies), associated site works and new vehicular entrance onto public road
Single storey welfare block (Gross Area 200 Sqm) and installation of covered timber storage racks to rear of existing unit 3
Demolition of a single storey house and the erection of a terrace of four two-storey houses and a terrace of three two-storey houses (both terraces to have first floor balconies), associated siteworks (including alterations to entrance of adjoining property to the north) and new vehicular entrance onto public road
To erect a 1,555m² extension to the rear and 720m² extension to the side of the existing 2,575 m² manufacturing & engineering industrial unit & 700m² office building along with all associated site development works
Change to an approved permission Reg. Ref. 20/667 with the addition of a single storey bedroom extension to the rear of a single storey cottage
Demolish the existing 2m2 front porch and 40m2 substandard rear extension along with all outbuildings totaling 84m2 and erect 81m2 new single storey extensions to the rear and side of the existing 45m2 cottage along with minor alterations and revisions to the elevations and internal layout of the original cottage and erect an 84m2 garage, upgrade the existing effluent disposal system to current EPA standards, improve the existing vehicle entrance along with all associated site development works
Erect a 2,300m2 manufacturing & engineering industrial unit with connecting 440m2 office building along with all associated site development works including storage yard, car parking, signage and connect to the existing services
Erect a two-storey dwelling with detached garage and connect to existing mains services along with all associated site development works
For an extension to the side and rear of the existing house (75m2), removal of existing sheds, reconfiguration of existing internal layout, new window opens and external insulation to the existing house, widening of the existing entrance gate, new wastewater treatment system, and all associated site works
Dormer type extension to existing bungalow and erect an extension to the side which will consist of the following (a) renovation and extension of the ground floor to create additional living space including the rearrangement of internal layouts with associated demolition works (b) the removal of the existing roof and replace it with a dormer roof space to accommodate bedrooms (c) renovate and extend the existing storage shed and workshop (d) ancillary works
Installation of a new effluent treatment system and percolation area in full accordance with EPA Cop 2009 standards and all associated site works, together with a new bored well
Refurbishment and single storey extension to the rear (South) and the side (East) of the existing detached residential dwelling together with associated site works
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 2 No. social housing units and all associated works. The accommodation shall consist of the following: 1 No. 2 bed and 1 No. 3 bed single storey units
Erect a two-storey dwelling with garage and connect to existing mains services along with all associated site development works
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting business
Directional sign at junction of L2188-0 and L6688-0
To construct an 18m² greenhouse conservatory to the side of the existing dwelling along with all associated site development works
Construction of a new educational campus and a new link road that will servce the school campus which will include the provision of two school buildings. Gaelscoil an Imbhir Mhóir a two-storey, 16 classrooms primary school with two special needs rooms and ancillary spaces with total floor of circa 3093sqm serving 480 pupils. Gaelshólaiste na Mara a three-storey, post primary school with two special needs rooms, PE hall and ancillary spaces with a total floor area of circa 6585sqm serving 400 pupils. Proposed site works to include the construction of all new hard play areas, six play-courts, grass pitch, 182 no. car-parking spaces together with boundary treatment, 79 bicycle stands, ancillary infrastructure works, pedestrian links and landscaping.
Temporary 2m lightweight timber fence on the Dublin Road boundary, raised existing gate pillars on existing pillars on existing entrance, connected to two wing walls to support a 'safety zone' for safe vehicular access into the property, connection to two gate pillars set back inside the property to support an electric security gate, within the property
Erect a two-storey dwelling and connect to existing mains services along with all associated site development works
Extension of appropriate period of PRR 21/87 erect a two-storey dwelling and connect to existing mains services along with all associated site development works
To erect circular slurry storage tank
A 1.8m wooden fence, repainted cream, facing onto the R2772
Construction of 3 no. digesters, 2 no. digestate storage structures, a liquid feed tank and 4 no. pump houses located in the northern section of the site. 4 no. pasteurisation tanks, a post pasteurisation cooling tank and a pre fertiliser manufacturing tank, located to the southeast of the digesters, in the centre of site. Part single-storey and part two-storey reception hall to accommodate a lab, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to reception hall, located at centre of site. Single-storey solid digestate storage & nutrient recovery building located to east of reception hall, in central portion of site. Odour abatement plant and all assoc. works. Construction of ESB substation, fuel storage tank, CNG compression unit, 2 no. CO2 tanks, CO2 loading pump, CO2 auxiliaries, CO2 liqueufactor, CO2 compressor, GFA, CO2 pre-treatment skid located in eastern portion of site. Construction of emergency biogas flare, biogas treatment skid, biogas compression system, biogas upgrading module, combined heat&power unit & panel room & H2S washing tower located in eastern part of site. Construction of grid offtake skid, biomethane boiler, grid injection unit & 2 no. propane tanks located to southeast of CO2 structures, in eastern section of site. Construction of two-storey office&admin building, located in southeast of site, adjacent to main site entrance. Associated works inc. parking, 3 no. EV, 1 no. accessible parking spaces;bike storage, access arrangements incl. new access point to site from adjacent road to south, weighbridge, provision of solar panels, wwt equipment, attenuation pond in northern portion of site, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping & all assoc & ancillary works. EIAR submitted.
Erect a 50m2 single storey extension to the rear of the existing dwelling along with all associated site development works
Construction of internal estate road and all associated site works
Alterations and additions to an existing single-storey detached dwelling comprising the construction of a new single-storey dining & family room extension to the front (south east) and side (north east) elevation including modifications to an existing window ope to the front (south east) elevation together with the construction of new replacement splayed site entrance comprising new piers and wall with gates in lieu of the existing site entrance all connecting into existing services and including all associated site works
Increasing the height of 'existing' three inherent pillars to 2 metres and increasing the height of the two 'existing' adjoining bay walls to 1.85 metres, on the northern part of the roadside boundary wall adjoining the R772
A one-story extension (Area 42 sq m) 5.2 m high to the north of the existing dwelling, as well as moving one existing window and adding one Velux on the north elevation
Directional sign
Construction of a new single storey industrial unit with ancillary 2 storey office accommodation (Total Floor Area 2310 sq.m) and all associated site development works
The removal of existing septic tank, new wastewater treatment unit & polishing filter and associate works
Residential development is proposed comprising 98 residential units on this site of 5.14 hectares. The residential mix will be detached, semidetached and terraced houses including 9 no. 2 bed houses; 71 no. 3 bed houses; and 18 no. 4 bed houses. All of the residential units will have associated private open space with gardens facing north/south/east/west. Alterations to Kilbride Road L6179 to provide a section of the regional road and upgrades to provide pedestrian facilities. Access to the site will be from the new proposed regional road. The development will also provide for landscaping, public open spaces and all associated site development works to enable the development including boundary treatments, temporary wastewater treatment plant, pumping station, percolation area, attenuation storage area and other service provision including ESB substation.
Erection of a single storey storage building associated with and ancillary to an existing adjoining retail premises
5 no. office units with a wc in unit 2 and associated site works
Dwelling, wastewater treatment system to EPA standards, entrance incorporating revision to existing entrance and associated works
Construction of a domestic two storey extension to the rear of my property
1. change of use of existing commercial premises to machinery hire and sales centre, which will consist of a reception area, office, canteen, toilets along with storage and display area. 2. provision of advertising signage to building and entrance. 3. provision of car parking. 4. provision of outdoor storage area consisting of wash bay, diesel storage and hire equipment and all associated site works and services at existing premises
(i) single storey extension to side of existing house, (ii) porch extension to front of house and all associated site works
Change of use of approved children’s creche and play school to a dwellinghouse
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
The development will consist of the following works: 1. A 2.8sq.m porch extension to main entrance built under the existing slate canopy. 2. Demolition of an existing 13.2sq.m conservatory and replacement with a single storey extension in blockwork with a painted render and slate finish. The new structure will increase the existing conservatory floor area by an additional 7.2sqm. 3. A 158.3sq.m mezzanine extension for office use, constructed above the existing food production area. 4. The total floor area added at all levels will be 168.3sq.m 5. Modifications to existing elevations as necessary to provide windows to new internal spaces and replace existing entrance doors with a window.
Existing commercial parking depot & permission to extend the existing commercial storage facility along with all associated site development works
Construction of a slatted cattle house/store, cattle handling facilities, farm roadway and farmyard entrance, together with associated concrete yards and site works
Extended living area to previously granted extension (Ref. No. 20/383) and associated works
154 sqm rear and side dormer style extension to 48 sqm dwelling, front dormer window to roof, proposed front porch, replacement wastewater treatment system to EPA standards in lieu of existing septic tank and associated works
Proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables