CONSTRUCTION OF A DWELLING HOUSE WITH ASSOCIATED SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF A TWO STOREY DWELLING AND SINGLE STOREY COMMERCIAL UNIT, (2) CONSTRUCTION OF A SINGLE STOREY DRIVE-THRU RESTAURANT INCLUDING THE ANCILLARY SALE OF HOT FOOD FOR CONSUMPTION OFF THE PREMISES WITH AN ASSOCIATED CORRAL AREA, ELEVATIONAL SIGNAGE, CAR PARKING INCLUDING ACCESSIBLE PARKING SPACES, GRILL BAYS, EV CHARGING SPACES, BICYCLE PARKING, A HEIGHT RESTRICTOR, CUSTOMER ORDER POINTS WITH ASSOCIATED CANOPIES, TOTEM SIGNAGE, FREE STANDING SIGNAGE, BANNER FRAMES AND DIGITAL MENU BOARDS, ESB SUBSTATION AND KIOSK, LANDSCAPING INCLUDING OUTDOOR FURNITURE/SEATING AREA WITH PARASOLS, BOUNDARY TREATMENTS, LIGHTING, AND ALL ASSOCIATED SITE AND ENGINEERING WORKS NECESSARY TO FACILITATE THE DEVELOPMENT, AND (3) INSTALLATION OF A TRAFFIC BARRIER ON THE MERIDIAN OF THE PUBLIC ROAD R229 ADJACENT TO THE PROPOSED SITE ENTRANCE TO PROVIDE FOR LEFT-IN, LEFT-OUT ONLY VEHICLE MOVEMENTS TO AND FROM THE PROPOSED DEVELOPMENTDecision record indexed
Bord Na Móna lands within the townlands of Cloncraff or Bloomhill Clonascra Ballyduff Clonaderg Doon Demesne Lackagh Beg Lackagh More, Cormore and Corbeg Corbane Ballydaly Kilcolgan Beg Turraun Leabeg Leamore Oughter Derrymore Bunakeeran, Lumcloon
The development of a recreational shared cycle and walkway located on Bord Na Móna lands within the townlands of Cloncraff or Bloomhill, Clonascra, Ballyduff, Clonaderg, Doon Demesne, Lackagh Beg, Lackagh More, Cormore and Corbeg, Corbane, Ballydaly, Kilcolgan Beg, Turraun, Leabeg, Leamore, Oughter, Derrymore, Bunakeeran, Lumcloon and Broughal in County Offaly. The development proposes the following; a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 16,919 meters of existing former rail bed and 8,960 meters along existing bog headlands / former high fields. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Greenway, The Offaly Way, and the Lough Boora Discovery Park. c) The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; i. 5 no. Type 2 Gateways (including 2 no. upgrades to existing parking and 3 no. proposed parking facilities) ii. 6 no. Type 3 Gateways iii. 1 no. Type 4 Gateways iv. 2 no. Major Rest Points v. 2 no. Minor Rest Points d) Upgrade works to Brosna Bridge (Ref 15-100). e) The construction of a new pedestrian and cycle bridge spanning the Grand Canal within the Turraun townland. f) Upgrade works to 10 no. local access road crossings, and 8 no. agricultural crossings. g) The erection of wayfinding and interpretative signage at Gateway locations along the route. h) The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. i) Fencing and screening will be erected where required for health and safety and biodiversity reasons which will include 14,909 meters of ecological screening. j) All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
Installation of a new waste water treatment system and associated percolation area and to decommission the existing septic tank and percolation area.Decision record indexed
To upgrade existing septic tank by installing a proprietary treatment system and polishing filter in lieu of the connection to public sewer which was previously granted under planning ref: 16496Decision record indexed
Development Area 9 Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22.
Cairn Homes Properties Limited intend to apply for a 7 year planning permission for development at a site of c.15.6 hectares (on two land parcels) known as 'Development Area 9' Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. The site is principally bounded by the Dublin-Cork railway line to the north, the Grand Canal to the south, the Grange Castle Road (R136) to the south-west and undeveloped lands to the north-west and east. The development will consist of the construction of a mixed-use development, which includes 660 no. residential units comprising: • 264 no. semi-detached and terraced houses (7 No. 2 bed 4 person houses, 238 No. 3 bed houses and 19 No. 4 bed houses), ranging in height from 2 to 3 storeys. • 68 No. duplex apartment units (34 no. 2 bed 4 person units and 34 no. 3 bed units), arranged across 6 No. duplex blocks, ranging in height from 2 to 3 storeys; • 328 no. apartments (165 no. 1 bed units, 30 no. 2 bed 3 person units, 133 no. 2 bed 4 person units), arranged across 7 No. apartment blocks (Blocks 1, 2, 3, 4, 5a, 5b and 5c), ranging in height from 4 to 6 storeys; and • A creche (c. 615 sq m) at ground floor level within Block 4. The development will also include a Local Node at 'Clonburris Little' which includes the provision of a double-height Park Hub building (c. 8m in height) comprising c. 1,558 sq m of community floorspace, including a sports hall/place of assembly, multi-purpose spaces, changing rooms, a café, storage areas, staff and visitor amenity areas and other ancillary spaces. Vehicular access to the site will be from the Clonburris Southern Link Street (as permitted by Reg. Ref. SDZ20A/0021) located centrally between Sub-Sectors KSE-S1 and KSE-S2. The development will also consist of the provision of c.11,049 sq m of public open spaces and associated landscaping (including a section of Grand Canal Park, a local park and pockets parks); communal open spaces; private open space (rear gardens, terraces and balconies); hard and soft landscaping (including internal roads, pedestrian and cyclist routes, pathways, hedgerows, boundary treatments and street furniture); play spaces with natural play elements; surface car parking (653 no. surface spaces in total, including accessible spaces); electric vehicle charging points; bicycle parking (long and short stay spaces including stands) and electric bicycle charging points; motorcycle parking; pedestrian and cyclist connections; routes ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including brown roofs/biodiverse roofs, ponds and wetland areas); solar panels; advertising signage; pedestrian crossings, public lighting; changes in levels and all site development and excavation works above and below ground.Decision record indexed
For the construction of a single storey extension to the side of the existing school, to include 1 no. mainstream classroom, 2 no. additional needs classrooms and associated ancillary spaces, amended parking layout with 1 no. additional charging point and 1 no. additional accessible space and all ancillary site worksDecision record indexed
30 31 32 33 34 Units, South Point Business Park, Charvey Lane Rathnew
• the approved block which comprises of units 33 and 34 (c.1086 sq.m) to be removed and the approved block which comprises of units 30, 31 & 32 (c. 1,623 sq.m) to be amalgamation into one block to facilitate the provision of a single industrial unit (c. 2,285 sq.m) for use as a packaging laundry facility. The provision of an enclosed external yard (c. 831 sq.m), including a water tank and plant. • the provision of Solar Panels at roof level. • minor amendments to the approved road layoutDecision record indexed
Permission for retention of sunroom extension constructed to the side of existing dwelling house, Permission for retention of domestic shed constructed on site and all associated worksDecision record indexed
Units 16-21A-B, Parkmore Industrial Estate, Longmile Road, Walkinstown, Dublin 12
The development will comprise the following: Demolition of existing commercial/industrial buildings on site (c.6,711 sq.m in total). Provision of a mixed use, residential and commercial/employment development (c.49,275 sq.m GFA excluding undercroft) within 4 no. blocks ranging in height from 6 to 10 storeys. The development will provide 436 no. apartments (all with individual private open spaces) consisting of: 2 no. studios, 180 no. 1-beds, 158 no. 2-beds and 96 no. 3-beds. The development will also include: internal residential amenity spaces (c.375.3 sq.m in total); community library (c.352.1 sq.m); creche (c.359.1 sq.m), and 4 no. commercial/employment units (c.1,226.6 sq.m) comprising 2 office/co-working units (c.435.8 sq.m in total), medical centre (with ancillary pharmacy)(c.674.1 sq.m) and café (c.116.7 sq.m). • Block A - 9 to 10 storeys in height and will provide 81 no. residential units. • Block B - 9 to 10 storeys in height and will provide 137 no. residential units • Block C - 8 to 10 storeys in height and will provide 85 no. residential units • Block D - 6 storeys in height and will provide 133 no. residential units. Upgrades to the western side of the Parkmore Estate Road and along the Long Mile Road and Robinhood Road to provide a variety of pedestrian/ cyclist access points to the development and with vehicular access provided from the Estate Road with associated upgrades to the Estate entrance. The development will also include 173 no. car parking spaces within 2 no. undercroft car parks on site and including 12 no. parking spaces (for the commercial units) along the Long Mile Road frontage. Provision of 1,040 cycle parking spaces. Provision of public and communal open spaces, landscaping, boundary treatments, plant areas, waste management areas, and services provision (including ESB substations), and all associated works required to enable this development including connection to the Uisce Eireann network. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.Decision record indexed
Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as permitted by extant planning permission ref. 15/4926, extended by ref 20/5549 and amended by ref 23/5586. All demolition, site clearance, earthworks and formation for foundations will be complete under the current permission. The proposed plant will generate renewable biogas from 90,000 tonnes of non-hazardous biodegradable waste (‘Brown bin’ domestic and commercial waste) per annum utilising anaerobic digestion (AD) technology. It is proposed to upgrade the biogas to biomethane and inject it into the adjacent gas grid to replace fossil fuel derived natural gas. Other products from the process include digestate (a nutrient rich biofertilizer) as well as biogenic (natural) carbon dioxide. The proposed development will consist of the construction of: 1) main process building (c.3,762m2 gross floor area (GFA), max 14.5m high) incorporating feedstock reception and processing area, digestate treatment areas, dewatering and storage areas, quarantine areas, an odour control system and associated 25m high stack with signage on the south elevation. 2)Tank farm (c. 3,183m3 footprint, 4m high bund wall) encompassing a total of 6 tanks including four digestor tanks (20.15m max. height, c.3,400m3 capacity) a digestate storage tank (20.15m max. height, c.3,400m3 capacity), a suspension buffer tank ( 10.5m max.height, c.700m3 capacity (, an containerised desulphurisation plant and associated 2 tanks (14m max height, c120m3 capacity), 2 no. enclosed pump rooms (room no.1 -53.58m2 GFA and room no.2 – 23.69m2 GFA), and enclosed feedstock pump room (53.58m2 GFA and 3.6m high), 3 sediment settlement tanks (c.5.84(L), c.2.23m (W) & c.3.78(H) on a raised platform at 6m above ground level, stairwells, pumps, gantry walkways, 2 bund access stairs and tank emergency access ladders; 3) A biogas upgrade plant and gas entry unit; 1 no. containerised Combined Heat and Power (CHP) 1.5MW unit with an associated 28m high stack, a carbon dioxide liquefaction plant, a biogas holder (10.56 max. height, c.2,000m3) with 4 no. c.13.12m high lightning rods, a 9.26m gas flare, a containerised boiler with 10m stack, a transformer station, a propane storage tank, an emergency generator, 2 no. weighbridges, weighbridge office (c.17.2m2 GFA and 4.55m high), a fire water tank (c.1,000m3 and 14.12m high), a bunded vehicle refuelling area with a fuel storage tank (2.5m3) and a wheel wash, 4) Administration building (c.393.25m2 GFA) and a workshop (c.70m2 GFA), 5) 31 car parking spaces (including 2 electric vehicle charging points and a universal parking space), 2 motorcycle parking spaces and a covered bicycle rack; 6) Boundary treatment including 2.4m high perimeter fencing (mix of mesh wire fencing and acoustic fencing), access gates on the south western and north eastern boundaries; and 7) all ancillary site development works and services including landscaping, lighting, 2 no. directional signs, service yard area and internal circulation routes, pipe bridge, footpath and all site drainage works. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, reg. no. P1018-01. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the application.Decision record indexed
Lands including Straboe and Killerrig, Carlow, Co. Carlow
A 10 year planning permission on lands including Straboe and Killerig, Carlow, Co. Carlow. The development will consist of permission for a Solar PV Energy Development with associated Battery Energy Storage System Compound with a total site area of c. 132.28ha, to include solar panels mounted on steel support structures, associated cabling and ducting, inverters, transformers, switchgear substations, auxiliary transformer, permanent storage containers, monitoring houses, composting toilet, BESS customer substation, battery blocks, BESS inverters and PCS (twin skid), BESS interface cabinets (BIC), backup generator, temporary construction compounds, tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, with a 40year operational period. It is proposed that the Proposed Development will be accessed from four separate access points which will include (i) a new access created off the R726; (ii) a new entrance off Straboe Lane; (iii) a widened and improved existing entrance off Straboe lane; and (iv) use of an existing and previously consented entrance off the R418. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the ApplicationGrounds not yet categorised
Townland of Creggan Upper, Fardrum Athlone, Co. Westmeath N37 TBP5
To demolish existing non-habitable dwelling and associated buildings, and the construction of the following: Building ‘A’, a standalone single storey motor vehicle service and sales facility (with ancillary offices, staff and customer facilities and ancillary spaces), (c. 1,780 sq.m.) with illuminated signage zone on north-west elevation (c. 3.75 sq.m) and an illuminated sign on the north-east elevation (c. 3.8 sq m); Building ‘B’, a standalone one storey with Mezzanine level motor vehicle service and sales facility (with ancillary offices, staff and customer facilities and ancillary spaces), (c. 952 sq.m.) with illuminated signage zones on north, south and west elevations (c. 16.2 sq.m in total); Building ‘C’, a standalone single storey valet and car wash building (with water recycling unit), (c. 310 sq.m.); and Building ‘D’, a standalone single storey valet and car wash building (with water recycling unit), (c. 326 sq.m.). Both Building ‘C’ and ‘D’ will be used for valeting and washing vehicles solely for the operation of Building ‘A’ and ‘B’. The development also includes the construction of an access road off the N62; 2 no. free-standing double-sided illuminated pylon signs (with signage zone of c. 9 sq.m in total); flag poles; customer and staff car parking; bicycle parking; new and used vehicle display parking; vehicle storage area and service parking; electric vehicle charging points; associated lighting; hard and soft landscaping including the provision of boundary treatments, gates, fencing, walls and bollards; SUDs measures; partial green roof to Building A; associated site servicing (foul and surface water drainage and water supply); ancillary plant; and all other site excavation and development works above and below ground. A Natura Impact Statement (NIS) accompanies this applicationDecision record indexed
In the townland of Boherboy, Saggart Road, Co Dublin
Development to the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate while to the south is the Boherboy Road; The proposed application represents the development of the entire Boherboy Neighbourhood as identified in the Fortunestown Local Area Plan (2012) consisting of 655 dwellings, comprised of 257 two, three & four bed, two & three storey detached, semi-detached & terraced houses, 152 one, two & three bed duplex units in 17 two to three, three to four & four storey blocks, and 246 one, two & three bed apartments in 9 buildings ranging in height from two, two to five, four to five & five storeys, and a two storey crèche (693sq.m); Access to the development will by via one vehicular access point from the Boherboy Road, along with proposed upgrade works to Boherboy Road to include the provision of a roadside footpath along the front of the site at the Boherboy Road, continuing eastwards to the junction with the N81 Blessington Road (for an overall distance of c.370m); The proposed development also provides for pedestrian and cyclist connectivity to the adjoining Carrigmore Park to the north-east, and vehicular, pedestrian and cyclist connections to adjoining developments at Corbally Heath to the east and Carrigmore Green to the north; The proposed development provides for (i) all associated site development works above and below ground, including surface water attenuation & an underground foul sewerage pumping station at the northern end of the site, (ii) public open spaces (c. 3Ha), including alongside the Corbally Stream, which will accommodate the provision of pedestrian / cyclist links to Carrigmore Park to the north-east, (iii) communal open spaces (c. 6,392sq.m), (iv) hard and soft landscaping and boundary treatments, (v) undercroft, basement & surface car parking (914 car parking spaces, including EV parking), (vi) bicycle parking (797 bicycle parking spaces), (vii) bin & bicycle storage, (viii) public lighting, and (ix), plant (M&E), utility services & 5 ESB sub-stations, all on an overall application site area of 18.3ha; In accordance with the Fortunestown Local Area Plan (2012) an area of c. 1.4Ha within the site is reserved as a future school site.Grounds not yet categorised
A 10-year planning permission and a 35-year operational life for an energy storage facility comprising (i) Energy storage containers installed on concrete plinths; (ii) Electrical inverters and transformers; (iii) Underground electrical and communications cabling; (iv) The upgrade of an existing agricultural entrance accessed via an existing shared access point from the L5039; (v) On-site access track (vi) Security fencing and security gates; (vii) Pole-mounted security cameras; and (viii) All associated and ancillary site development, landscaping and reinstatement works. This planning application is accompanied by a Natura Impact Statement.Decision record indexed
For 1. construction of 65 no. residential dwellings comprising of: a.1 no. 4 bedroom 2 storey detached dwelling, b.19 no. 4 bed 2 storey semi-detached dwellings, c. 19 no. 3 bedroomed 2 storey semi-detached dwellings, d. 12 no. 3 bedroomed 2 storey terraced dwellings, e.1 no. 4 bedroomed 3 storey terraced dwelling, f.4 no. 1 bedroom apartment units and 9 no. 2 bedroom apartments units, together with an associated communal bike and bin store within a two storey duplex building. 2. Construction of a single storey creche building, together with associated play area, bin store, parking and set down areas. 3. New road works along the R334 Cong Road to provide for; a vehicular and pedestrian entrance to serve the development, provision of gateway signage for the town of Headford, road re-alignment, construction of roadside footpath and public lighting, a pedestrian crossing point with pedestrian traffic signal, traffic calming ramps and associated warning signage. 4. Provision of public and private open spaces, play spaces, bicycle parking, site landscaping, revised boundary treatments, and public lighting within the estate; 5. Provision of residential carparking including a proportion of electric charging spaces and ducting to all spaces for future electric charging points; 6.Connection to public sewer and public watermain along Cong Road, together with on-site surface water drainage works; 7. Footpath connections, signage locations, ESB substation and all associated site development works and services. A Natura Impact Statement will be submitted to the planning authority with this application. Gross floor space of proposed works: 7,446 sqm(houses), 518.00 sqm(commercial)Decision record indexed
Millstreet Train Station Dooneens Millstreet Co. Cork
Permission for carpark alterations. These alterations will include the following: the partial demolition and relocation of stone walls at the entrance to the train station to widen the current vehicular access, revisions to car parking layout to include a c.3,018m2 extension of the existing car park to the east creating a total number of 66 no. car parking spaces, including 7 no. EV charging spaces and 5 no. accessible parking bays, 10 no. bicycling parking spaces, a bicycle shelter, bus set down areas, the creation of bus interchange area to west, including the demolition of an existing road boundary wall, improved accessibility for pedestrians and cyclists, a pedestrian crossing point to link the bus interchange area with the train station, retaining walls, public lighting, railings and all associated site works. Millstreet train station is a protected structure RPS no. 00323Decision record indexed
We, Barry and Laura Anne O’Boyle, intend to apply to Sligo County Council for Planning Permission for the construction of a part single-storey/part two-storey house, provision of a domestic shed and all associated site works at Rosses Upper, Rosses Point, County Sligo.Decision record indexed
NO. 4 ROS BEOLAIN, UPPER ROSSES, ROSSES POINT CO SLIGO
EXTENSION AND RENOVATION OF EXISTING ONE AND A HALF STOREY DWELLING INCLUDING EXTENSION AT REAR TO GROUND & FIRST FLOOR EXTENSION TO WEST. REMOVAL OF EXISTING ENTRANCE PORCH AND CREATION OF NEW ENTRANCE AND SHELTERED HIDDEN ENTRANCE TO NORTH. REAR ROOF STRUCTURE TO BE REPLACED WITH FLAT ROOF. 2 NEW DORMERS TO NORTH ROOF AND ROOF OVERHANGS REMOVEDGrounds not yet categorised
Construct an easy feed slatted cubicle house complete with slatted slurry tanks, central passage, ancillary concrete, external agitation points, cattle crush, straw bedded area and all ancillary site workDecision record indexed
No.11 Helms Point Church Bay Road Crosshaven Co.Cork
Permission to erect a single storey flat roof extension to the east side of existing dwelling including miscellaneous alterations and all associated site works.Decision record indexed
Bóthar an Chóiste, in the townlands of Castlegar and Ballinfoil, Galway
Permission for development which consists of: We, Lock House Developments Limited (the applicant), intend to apply to Galway City Council for permission for a Large-Scale Residential Development. The site extends to 4.626 ha on lands located to the north of Bóthar an Chóiste (also known as Bóthar na Cóiste), in the townlands of Castlegar and Ballinfoil (also known as Ballinfoile), Galway. The application is being made under the provisions of the Planning and Development (Amendment) (Large Scale Residential Development) Act 2021. The proposed development will consist of the following: 1) Demolition of an existing house (124.6 m²), a ruined outbuilding (42.8 m²), and a ruined dwelling (41.7 m²) 2) Construction of 168 no. residential units comprising: i. 70 no. two storey houses (36 no. two-beds, 26 no. three-beds, 8 no. four-beds), ii. 2 no. apartment blocks comprising 54 no. apartments (27 no. one-beds, 27 no. two-beds), iii. 44 no. duplex units (19 no. one-beds, 25 no. two-beds). 3) Development of a two-storey creche facility (c. 300 sqm), associated outdoor play areas and parking. 4) Provision of all associated surface water and foul drainage services and connections including pumping station with all associated site works and ancillary services. 5) The upgrade of the existing Bóthar an Chóiste road from the proposed development to the junction at L5041 consisting of road improvements, road widening and junction re-alignment. 6) Pedestrian, cyclist, and vehicular links throughout the development and access to Bóthar an Chóiste, and pedestrian and cyclist link to the adjacent Greenway route. 7) Provision of Bat Boxes, a Native Hedgerow Corridor (biodiversity and pollinator friendly) along the northern boundary, and the provision of Sustainable Drainage Systems (SuDS) features. 8) Provision of shared communal and private open space, site landscaping and public lighting, resident and visitor parking including electric vehicle charging points, bicycle parking spaces, and all associated site development works. The application is accompanied by a Natura Impact Statement (NIS).Decision record indexed
The development will consist of: (A)- The Construction of a split-level building with part single-storey and part three-storey school for Árd Rí Community National School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 3,591.00m². (B)- The Construction of a two-storey building for St. Ultan’s Special School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs suite, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 4,359.20m², Additionally, the development will include all associated site works such as car parking, bicycle parking, shared sports facilities, playing areas, open spaces/landscaping, plant, bin stores, site services, and connections to facilitate the development. There will also be vehicular and pedestrian access to the development via Baker Hall along with additional pedestrian access points to the north and west. Significant further information/revised plans submitted on this applicationDecision record indexed
1. Block A – Industrial Unit (area = 1798 sq.m) 2. New main site entrance with sliding gates, stone walls and piers, east vehicular site entrance with sliding gates and stone piers with pedestrian/ cyclist entrance points, 3. Existing site boundaries to be retained & augmented as necessary, new fenceline to create new boundary lines to the east and south of the site with additional landscape screening, 4. Car parking for staff & visitors, bicycle parking, access roads, landscaping, external lighting, building & site corporate signage, solar panels to roof areas on Block A 5. Foul and surface water drainage, water services and all associated infrastructure works and services on 1.49 Ha on landsDecision record indexed
Market Green Knockgriffin (lands north of Market Green Plaza/east of Midleton Retail Park) Midleton Co Cork
Permission for the construction of: 1) A 5,250m2 four storey Primary Care Centre to accommodate (a) HSE Facilities comprising consulting rooms, treatment areas, meeting rooms, offices and support spaces, as well as (b) 2 no. general practitioner suites. 2) A 23m2 single storey detached ancillary structure at the rear of Primary Care Centre comprising of ESB substation and electrical switch room. 3) A 46m2 single storey secure waste compound to the rear of the detached ancillary structure. 4) 123 no. parking spaces including 87 no. standard car parking bays, 8 no. disabled parking bays, 12 no. parent and child bays, 12 no. electric vehicle charging bays and 4 no. motorcycle bays. 5) 60 no. bicycle parking spaces including 20 no. short stay uncovered spaces, 20 no. short stay covered spaces and 20 no. long stay covered spaces. 6) A new vehicular access point to the site from Market Green Plaza. 7) All associated site development works to serve the proposal including site lighting, hard and soft landscaping, and all associated signage. A Natura Impact Statement will be submitted to the Planning Authority with the application.Decision record indexed
Permission for construction of 2no. Industrial units together with ancillary staff facilities, car & bicycle parking, electrical charging points, covered storage structures, building signage, totem signage, standalone ESB substation, new gated access & boundary treatments, new footpath, connection to storm and foul drainage system, all associated ancillary site worksDecision record indexed
Permission for development which consists of: remedial works and repairs, including new roof slating and flashings, chimney stack repairs, removal of cement renders and pointing, external masonry repointing and replastering, internal replastering and/or thermal lining, replacement gutters and downpipes, replacement of selected external windows and doors; and all associated ancillary works. This is a protected structure and is located in an architectural conservation area and within a prescribed area of archaeological notification.Decision record indexed
For modifications to previously granted planning application number 23/439, to consist of demolition of existing toilets and office to rear of building. An enlarged footprint is proposed for the previously approved Endoscopy and Central Sterile Services Department (CSSD) extensions together with revised plantrooms, and revised internal layout to both extensions. New rooflights are proposed to the rear of the building to existing offices and to Recovery areas. New rooflights are also proposed to the front of the building, where an existing first floor store room is being converted to provide office accommodation. Permission is also sought for new electrical substation and a generator enclosure with fuel store. Revised by Significant Further Information which consists of: Four electric vehicle charging points plus two bicycle shelters have now been included in the revised submission, in accordance with the Kildare County Development Plan 2023-2029Decision record indexed
(1) Construction of a single storey extension to the southwest of the existing school consisting of a 2-classroom SEN base, associated toilets, central activities area and ancillary spaces along with 2 SET Rooms. The work includes the installation of roof mounted PV panels, (2) Alterations within the existing school to form a changing places room along with any alterations needed to form the link to the extension, (3) The provision of a new playing court, parking and set-down area to the Southeast of the school. An existing access is to be upgraded to a vehicular access/exit to the site at the Southern boundary onto Dolmen Court (4) The provision of an EV (Electric Vehicle) charging point (5) The construction of a gas tank compound (6) All siteworks associated with the aboveDecision record indexed
The change of use of the unit from light industrial to warehouse with trade counters for the sale of building related products principally to trade. Works to the premises include: South elevation: removal of roller shutter and inclusion of a new point of entry to the trade counters. Installation of a new operator sign above the new trade counter entry with downlighter. Marking out parking at the front of the building. East elevation: installation of new double door and a single operator sign. North Elevation: area for wall mounted mechanical plant. Internally: removal of an internal mezzanine and installation of trade counter area. All other ancillary works associated with the proposed developmentDecision record indexed
Period of 10 years for a proposed solar farm and BESS (battery energy storage system) development which will consist of the construction of PV panels mounted on metal frames, inverters, battery storage infrastructure (BESS units, and MV Stations), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, a substation and all ancillary grid infrastructure and associated works. It is proposed to use the consented Ballymoney Solar Farm access point (Pl Ref: 19/627 and ABP Ref: 305289-19). The solar farm and BESS would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this applicationGrounds not yet categorised
Innplot, Units 4 & 5 Ground Floor Oranpoint, Oranmore
To: a) fit-out existing vacant shell structure to previously approved licenced bar under (planning ref: 17/1626), including, b) integration and interconnection with approved licenced restaurant, (planning ref: 19/1003) and c) the formation external terraced smoking area with d) external vehicle charging points and e) minor internal floor layout revisions at basement and ground floor levelsDecision record indexed
For 49 no. houses in the townland of Baunmore, Gortnahown and Farranablake East together with ancillary works. The development will consist of the construction of: •18 no. 4 bed semi-detached (2 storey) houses, •10 no. 3 bed semi-detached (2 storey) houses, 13 no. 3 bed terraced (2 storey) houses, • 3 no. 4 bed detached houses, • 5 no. 2 bed terraced houses. The proposed development will also include for; •The demolition of a shed ruin on site, • Provision of public open space areas (including a playground), private open space areas, bicycle parking, footpaths, public lighting, ESB Sub station, landscaping and revised boundary treatments. • Provision of carparking including ducting to all spaces for future EV charging points; • Provision of an uncontrolled pedestrian crossing to traverse the Baunmore road (L-31232 county road), • Connection to existing mains water infrastructure and on site surface water attenuation to serve the development, • Proposed foul drainage networks, including a sewer extension along the Baunmore Road (L-31232 county road), to connect to the existing Pairc na hAbhainn Wastewater pumping station to the north-west. • Proposal for adjoining Nursing home to east to connect to the proposed foul sewer with decommissioning of the associated on-site sewage treatment plant, together with all associated site works and services. A Natura Impact Statement will be submitted to the planning authority with this application. Gross floor space of proposed works: 5,870 sqm. Gross floor space of any demolition: 42.70 sqmDecision record indexed
Site No. 5, Fuchsia Hill, Wood Point, Courtmacsherry, Bandon, Co.Cork.
Permission for change of design of two-storey dwelling house, as granted under planning permission reg numbers 17/592 & 22/6115 and all associated site worksDecision record indexed
DEVELOPMENT AT A 28.5.6HA SITE AT REENROE, EMLAGHMORE WEST, BALLINSKELLIGS, CO. KERRY. THE DEVELOPMENT WILL CONSIST Of AN INTEGRATED TOURISM/ LEISURE PARK FIRST COMPRISING OF THE PARTIAL DEMOLITION, EXTENSION AND REDEVELOPMENT OF THE EXISTING DERELICT HOTEL, TO INCLUDE; 4 NO. SELF-CATERING STUDIO APARTMENTS; 3 NO. ONE BED SELF-CATERING APARTMENT; 15 NO. TWO BEDS SELF-CATERING APARTMENTS; A BAR; DINING ROOM; ROOFTOP RESTAURANT; SHOP; ESB SUBSTATION AND SWITCH ROOMS; STANDBY GENERATOR ROOM, AND BIN STORES. THE REMAINDER OF THE PROPOSED DEVELOPMENT WILL INCLUDE THE FOLLOWING: 6 NO. HOBBIT HUTS, 21 NO. GLAMPING PODS, 25 NO. HOLIDAY HOMES, 144 NO. MOBILE HOMES, 20 NO. CAMPERVAN STANDS, 0.8HA TENT CAMPING AREA, WASHROOM AND TOILET FACILITIES 58M2, MAINTENANCE BUILDING 618M2, LEISURE COMPLEX (WITH A SWIMMING POOL) 1,339.5M2, SURF SHOP 191.7M2/CAFÉ 126.5M2, NATURAL PLAY AREA, CENTRAL PARK AREA, 151 NO. CAR PARKING SPACES, INCLUDING COACH PARKING, 40 NO. BICYCLE SPACES, EV CHARGING POINTS, INTERNAL ROADS, FOOTPATHS, WASTE STORAGE AREAS, WIDENING OF BEACH ACCESS ROAD TO 6M FOR TWO-WAY TRAFFIC INCLUDING A PEDESTRIAN/CYCLE PATHWAY, UPGRADING OF EXISTING CLIFF WALK, NEW ACCESS ROAD AND SERVICES LINES TO TWO NEIGHBOURING DWELLINGS TO THE SOUTHWEST OF THE DEVELOPMENT SITE, NEW WASTEWATER TREATMENT SYSTEM WITH CLEAR WATER PUMP STATION AND UV SYSTEM AND ASSOCIATED CONSTRUCTED INTEGRATED WETLAND, SITE DRAINAGE, 2 NO. STANDBY GENERATORS, WATER SERVICES AND LANDSCAPING. THE PROJECT INCLUDES ALL ANCILLARY AND ASSOCIATED WORKS NECESSARY TO FACILITATE THE DEVELOPMENT. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT AND ACCOMPANIES THIS APPLICATION.Grounds not yet categorised
Retention Permission for existing slatted unit as built (ii) Planning Permission to construct a new slatted livestock house. Proposed slatted house to incorporate easy feed & associated underground slurry tank with external agitation & ancillary external concrete (iii) Planning Permission to construct a new milking complex. Proposed milking complex to incorporate dairy, plant room & ancillary room, & covered collecting yard incorporating slatted tank with external agitation points & ancillary external concrete. The above to be carried out with all associated ancillary site worksDecision record indexed
St. Ronan’s National School, Saint Cuthbert's Road, Deansrath, Clondalkin, Dublin 22, D22 C861.
Demolition of six existing single-storey pre-fabricated buildings and construction of a new two-storey modular school building (accommodating 6 mainstream classrooms, 4 SEN classrooms, and 9 SET rooms), together with the provision of a timber-fenced sensory garden (100 sqm), a mesh-fenced soft play area (200 sqm), enhanced bicycle parking, revised car parking layout (to provide 34 car park spaces, 3 additional accessible parking bays, EV charging points, and designated drop-off areas), widening of the existing vehicular entrance and all associated site development works.Decision record indexed
72 Middle Abbey Street (site with Frontage to North Lotts to rear) Dublin 1
(i) omission of existing recessed mezzanine floor areas atop third floor level and reinstatement of full fourth floor level; (ii) works to external elevations including paint removal and repairing of pointing on Middle Abbey Street elevation; and replacement of sand cement plaster with insulating lime plaster and increasing height of ground level window openings to North Lotts elevation; (iii) removal of existing internal staircases, relocation of entrance door to North Lotts, provision of new internal staircases and reconfiguration of internal floor plans through provision of new wall partitions; (iv) change of use of building from retail (at basement/ground floor level) and retail storage (at all above ground floor levels) to a mixed-use building comprising a commercial retail unit at basement floor level, a café at ground floor level and a tourist accommodation development (comprising 9 no. short-stay apartments) from ground to fourth floor level; and, (v) all ancillary works necessary to facilitate the development.Grounds not yet categorised
For the demolition of an existing 23m2 single storey entrance porch at Building No.3 (North-East elevation) and removal of entrance pathway. Construction of new 148m2 single storey reception building at point of existing entrance on North-East façade to include a sheltered canopy public entrance with separate staff entrance, reception waiting area, tea station, 1 no. office room, 1 no. meeting room and a wheelchair accessible W.C. all with associated ancillary, drainage and landscape works including permeable paving serving as attenuation tank and soakawayDecision record indexed
Droim Na Gaoithe & An Chreig Bhuí, Baile Chláir, Co. na Gaillimhe
For: construction of 62 no. residential units comprising of: 25 no. 3 bedroom 2 storey terraced houses (Type A & Type D blocks), 6 no. 3 bedroom 2 storey semi-detached houses (Type C blocks), 3 no. 2 bedroom 2 storey terraced houses (Type B Block), 3 no. 2 bedroom two storey terraced houses and 1 no. 3 bedroom end of terrace house (Type H Block), 10 no. 1 bedroom ground floor apartment units and 10 no. 2 bedroom upper floor apartments units, within 2 no. two and a half storey duplex buildings (Type E & E1 Blocks), together with communal Bin Storage. 2 no. 1 bedroom ground floor apartment units and 2 no. upper floor 2 bedroom apartments units, within a two and a half storey duplex building (Type F Block), together with communal Bin Storage. Proposed new road works along R381 (Oranmore road) to include new entrance and associated right hand turning lane, revised road markings and relocation of existing kerbed road island. Demolition of single storey dwellinghouse (Eircode H91HH2H) and domestic garage/shed, together with decommissioning/removal of existing septic tank system, and closure of vehicular entrance onto L-7110 (Lakeview Road). Demolition of 5 no. single storey agricultural sheds with farmyard and closure of 2 no. agricultural entrances onto L-7110 (Lakeview Road). Provision of public and private open spaces, play and seating areas, bicycle parking, site landscaping, revised boundary treatments, and public lighting. Provision of residential carparking including a proportion of electric charging spaces and ducting to all spaces for future electric charging points. Connection to public water main along the R381 (Oranmore Road), connection and extension to the public sewer along the R381 (Oranmore Road), provision of on- site pumping station, together with on-site surface water drainage works. Footpath connections (including proposed footpath extension along L-7110 Lakeview Road), signage locations, ESB substation and all associated site development works and services. A Natura Impact Statement will be submitted to the planning authority with this applicationDecision record indexed
For Demolition of the existing buildings on the site (1,430sq.m) and closure of the existing entrance onto the N55. Construction of a new filling station consisting of: Single storey Service Station Building (957sq.m) measuring predominantly 6.24m high, with a maximum of 8.4m high. It will contain a net retail area of 100sq.m (including ancillary off-licence measuring 10sq.m), 2 no. communal seating areas, 4 no. food/beverage offers, drive-thru facility (hatch and lane), back of house (including toilets, office, staff services and storage) and detached service yard. 4 no. pump islands under a canopy measuring maximum of 5.55m high (with parking for 8 cars). 51 no. car park spaces (with additional spaces as follows: 5 no. EV charging spaces, 3 no. service bays, 4 disabled spaces, 3 drive-thru waiting bays and 6 staff spaces). 10 no. HGV/bus parking spaces. 2 no. car wash bays. 2 no. HGV fueling bays (maximum height of canopy 6.2m high). 10 no. cycle parking spaces. All associated site works including, landscaping, boundary treatment, substation, circulation, lighting, fill points, underground fuel tanks and signage (free standing and on structures). For clarity vehicular access/egress will be from the existing roundabout junction at the north end. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.Decision record indexed
The construction of 27 no. dwellings consisting of 4no. three bed (2-storey) townhouses and 23no. four bed (2-storey) townhouses, connection to existing site services and completion of existing vehicular access road, provision of landscaping and communal open space, boundary treatment works, and all associated and ancillary development works33 conditions indexed
PROTECTED STRUCTURE: Siobhan Dillon & Michael Hale are applying for planning permission for A) single-storey 16.5sqm extension at lower ground floor level to the side of an existing non-original extension to the south-west (rear) return; B) alterations to the south-west (rear) elevation of the existing non-original extension to the south-west (rear) return; C) alterations to the existing internal layout, including the provision at lower ground floor level of a new open plan kitchen, living & dining area, a utility room and at second floor level the provision of a new walk in wardrobe & ensuite; D) the reinstating of the stairs connecting ground & first floor; E) the provision of two new skylights on the inner pitches of the original ridged roof; F) repairs to the existing original timber sash windows in the North-East (front) and South-West (rear) Elevation, and G) the cleaning & re-pointing of the brick in the North-East (front) elevation. All at 38 Leeson Street Upper, Ranelagh, Dublin 4, D04 X5P6 (protected structure ref. 4493).Decision record indexed
PROTECTED STRUCTURE: RETENTION:a) Widening of previous gateway from 2.1m to 3.2m to provide vehicular entrance to off-street parking and electrical charging points including relocation of gate piers. b) Alterations to existing iron railings and gate to provide automated double gate.Grounds not yet categorised
For development at Clare Technology Park, Ennis, Co. Clare, on a site measuring c. 0.44 hectares, for a Renal Dialysis Facility comprising: 1) The construction of a single storey building measuring c. 904 sqm gross floor space; 2) Vehicular and pedestrian access point from existing Clare Technology Park road network, associated car / vehicle parking, site hard and soft landscaping and boundary treatments; and, 3) Provision of signage, bin store, external mechanical and electrical plant and equipment, drainage infrastructure and connections to services / utilities, and all other associated and ancillary development and works above and below ground level. A Natura Impact Statement will be submitted to the planning authority with the application.Decision record indexed
Walsh Park, Keane’s Road Slievekeale Road Browley West, Waterford
Amendments to the redevelopment of the Walsh Park GAA Grounds, from that permitted by Waterford City and County Council Planning Reference 18/448 (ABP Reference 302598-18) as extended by Waterford City and County Council Planning Reference 24/1, and all ancillary site development works. The proposed amendments include. (a) The construction of a revised uncovered western terrace with associated undercroft spectator facilities. The proposed development also includes a revised western boundary treatment from Keane’s Road to include revised turnstile locations, revised vehicular access location and public realm upgrades. (b) Modifications to the uncovered northern stand to allow for an existing clubhouse building to remain to the west of the stand and the provision of new toilet facilities to the east of the stand. (c) The construction of a revised two/three storey pavilion building to the east of the site to accommodate revised team/referee changing and welfare facilities at ground floor level and administrative/multi-purpose areas at first floor level. (d) The reconfiguration of the southeastern area of the site to provide for a revised site entrance arrangement, parking areas, relocated turnstiles, concession stand, additional toilet facilities, bicycle parking and bin stores. (e) Modifications to the existing southern stand to accommodate a new disability access point to the stadium from Slievekeale Road. (f) The installation of roof mounted PV panels on roof of the southern stand. (g) The provision of 2 no. electronic scoreboard structures. (h) The relocation of concession stands and toilet facilities in western areas of the site and all other ancillary site development works which include revised elevational and boundary treatments.Decision record indexed
(1) TEMPORARY PLACEMENT OF MOBILE HOME ON SITE FOR DURATION OF CONSTRUCTION OF NEW DWELLING AND (2) ERECTION OF DWELLING WITH EFFLUENT TREATMENT PLANT AND DOMESTIC GARAGE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF EXISTING TWO CLASSROOM BLOCK TO THE WEST SIDE OF THE SITE, (2) CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE WEST SIDE OF THE EXISTING SCHOOL BUILDING TO CREATE A TWO CLASSROOM SEN UNIT AT GROUND FLOOR LEVEL AND TWO REPLACEMENT MAINSTREAM CLASSROOMS AT FIRST FLOOR, (3) PROVISION OF AN ENCLOSED SOFT PLAY SPACE, CONTAINING A SENSORY GARDEN, TO THE REAR OF THE EXISTING SCHOOL, (4) ALTERATIONS AND DELINEATION OF ROADSIDE PARKING AND BUS DROP OFF AREA ALONG LOCAL ROAD L5542 INCLUDING THE UPGRADE OF AN EXISTING CROSSING POINT TO A RAISED TABLE, (5) PROVISION OF A TEMPORARY PREFAB CONTAINING 2 NO. ENSUITE CLASSROOMS TO SERVE THE SCHOOL FOR THE DURATION OF THE BUILD WITH CONNECTION INTO EXISTING SERVICES ON SITE AND (6) CONNECTION TO EXISTING SERVICES ON SITE AND ALL ANCILLARY SITE WORKS CONNECTED WITH THE WORKS MENTIONED ABOVEDecision record indexed