For minor revisions to the building structure, associated elevations and site layout, previously permitted under Pl. Ref. P23/358. The existing facility is currently fully serviced by existing services. The proposal will include all associated site development works with connections to existing services as previously permitted under Pl. Ref. P23/358
For the development of an air dome (1,872m2) for multi-use gym and sports activities. The air-dome includes a gym, indoor astroturf, spin rooms and associated facilities on the grounds of the existing Clare Leisure World. Works to include ground mounted PV installation and all associated site works. The existing facility is currently fully serviced by existing services
To (a) Demolish existing flat roofed extensions and store (b) Construct an extension consisting of a ground floor retail unit and 1st floor apartment (c) Carry out internal alterations and external fenestration changes to existing building which is a protected structure (RPS No. 788) together with all associated site development works
For the renovation of an existing derelict bakery building, the addition of a 28m2 two storey rear extension and the conversion to a 112.81m2 two storey dwelling together with connection to existing services and all associated ancillary site works
For the improvement works to Killoo Graveyard to comprise of, (a) construct new gravelled pedestrian walkway adjacent to south wall of existing entrance, (b) construct new gated entrance to west wall of graveyard, (c) provide three new agricultural gates, (d) construct new wrought iron fencing to north side of both existing entrance and proposed new pedestrian access, (e) to construct pedestrian access turnstiles at existing entranceway and self-closing gates at new pedestrian access (f) to create new legal right-of way over proposed new pedestrian access and extinguish existing right-of-way through centre of field including ancillary siteworks
For the following works at the site of the former Ennis Boys NS, Ennis, Co Clare: The development will consist of the provision of a new temporary surface car parking for a period of 5 years containing 156 car parking spaces, 12 accessible bays and 4 Electric Vehicle parking bays; minor alterations to the exiting vehicular entrances to and from the Kilrush road; provision of signage; to provide pedestrian access and internal footpaths; perimeter fencing surrounding the surface car park together with all associated site and ancillary works
To RETAIN an 88m2 single storey portacabin, two steel storage units, perimeter fencing and ancillary site works. Intended use is agricultural/recreational/educational activities and for PERMISSION to erect a 105m2 single storey workshop and ancillary site works
To Extend the Appropriate Period of Planning Permission for P15/293 for extension to hard standing area to Clare Marts to include filling and levelling of the proposed area to align with existing yard levels along with all associated site works
To carry out works on the existing property at Clonroad, Ennis. The proposed works will involve the following: 1. The demolition of existing buildings on site and 2. The construction of an extension to the existing dwelling house and 3. Carry out alterations to existing house and 4. Carry out ancillary works in association with proposed development
To construct a new dwelling house, access road and connect to existing services along with all associated works
The development will consist of the construction of a new dwelling house, access road and connections to existing services along with all associated works
For development works at Cathedral House, Station Road, Ennis. The works will consist of the following: a. Replacement of roof coverings. b. Replacement of windows. c. Extension of first floor over kitchen area. d. Demolition of rear shed and construction of replacement shed. e. New side entrance to house and modification of entrance to chapel. f. Internal works including installation of lift. installation of new bathrooms, upgrade to mechanical and electrical services and all associated drainage and site works. The Cathedral House is a Protected Structure, ref E82, NIAH # 20001096.
To RETAIN an existing single storey kitchen extension to the rear of the dwelling house, including ancillary site works
To replace the first floor windows on the front elevation of the building which is a protected structure (RPS No. 783), with all associated site works
To construct a two-storey building incorporating 6 No. 1-Bedroom apartments, and a single storey building incorporating 6 storage sheds to be used in conjunction with the apartments, connection to public services and all associated site works to accommodate the development, all accessed by means of an existing covered passage way (Bow-way)
To construct a single storey building incorporating 3 No. 1-Bedroom apartments, connection to public services and all associated site works accessed by means of an existing covered passage way (Bow-way)
To upgrade existing Cathedral heating system which will provide for a new gas boiler plant room outside existing scout hall, block up existing window and relocate stone plaque to scout hall, together with underground ducting to connect to existing gas supply and existing underground boiler house and all associated site development works and services necessary to facilitate the proposed development. The proposed development is located within the curtilage of the protected structures of St. Peter & Paul Cathedral (RPS No.781) and the Parochial House (RPS No 782)
To construct a vehicular entrance onto the public road, car parking area and ancillary works
For the removal of the existing flagstone paving and access steps to the Cathedral entrance plaza; the construction of a new reconfigured stepped stone access together with new stone paving to the entrance plaza; the refurbishment of the existing Marian shrine; and all associated site development works and services necessary to facilitate the proposed development at St. Peter & Paul Cathedral, Upper O'Connell Street, Ennis, Co. Clare. The proposed development is located within the curtilage of the protected structures of St. Peter & Paul Cathedral (RPS No.781) and the Parochial House (RPS No 782)
The works will consist of the following; a. Existing softwood cupboards in the mortuary chapel to be removed. b. Proposed 2 no.. sets of bronze plated columbarium units to be fitted into the vacated space. c. White oak trims to units and white oak veneer mdf panelling to the surround of the Columbarium units. The Cathedral is a Protected Structure, RPS No.781
For the construction of a first floor extension over an existing single storey extension to the rear of an existing dwelling, modifications to the elevations of the existing extension and dwelling and all ancillary site works
For the construction of a dwellinghouse with integrated auxiliary living accommodation, garage & proprietary waste treatment plant, bored well & road entrance including ancillary site works
Of (a) existing beer garden consisting of covered seating and BBQ area as constructed (b) Permission to erect acoustic panel fencing along section of western boundary together with all associated site development works and services
1. The construction of 289 no. residential units comprising a mixture of 12 no. 1 bed apartments, 78 no. 2 bed townhouse/duplex/apartment units, 165 no. 3 bed dwelling houses, and 34 no. dwelling houses which will have an option of a 3 or 4 bedroom house-type; 2. A 400.7m2 creche/childcare facility; 3. The provision of landscaping, open space and amenity areas, including play/exercise equipment, a linear amenity walkway, informal play areas and local play areas; 4. The provision 2 no. pedestrian connections to the existing public footpath along the N85, 2 no. pedestrian connections into Ballymacaula View Estate, improvements/upgrades to the pedestrian footpaths along Circular Road including an uncontrolled pedestrian crossing and pedestrian footpath provision along part of the Drumbiggle and Cahercalla Roads; 5. All associated infrastructure and services including 1 no. vehicular access point onto Circular Road, car and bicycle parking and bin storage, lighting, 2 no. ESB substations, drainage and 1 no. pumping station, boundary treatments.
To modify front boundary and provide vehicular access along with associated site work and services
For a Large-Scale Residential Development (LRD) at this site at Ballymacaula, Drumbiggle, Keelty, Circular Road, Ennis, Co. Clare. The development will consist of 1. The construction of 300 no. houses comprising 14 no. 1 beds, 91 no. 2 beds, 164 no. 3 beds, and 31 no. 4 beds; 2. 1 no. creche/childcare facility; 3. The provision of landscaping, open space and amenity areas, including a linear amenity walkway, footpaths, cycleways and play areas; 4. The provision of 3 no. pedestrian connections to the existing public footpath along the N85, 2 no. pedestrian connections into Ballymacaula View Estate, improvements/upgrades to the pedestrian footpaths along Circular Road including a raised pedestrian crossing and pedestrian footpath provision along part of the Drumbiggle and Cahercalla Roads; 5. All associated infrastructure and services including 1 no. vehicular access onto Circular Road, car and bicycle parking, bin storage, lighting, 3 no. ESB substations, drainage,1 no. pumping station, boundary treatments. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development. The application may be inspected online at the following website set up by the applicant: www.ennislrd.ie
To construct a new dwelling house, entrance, private garage and install a new wastewater treatment system along with all associated works
For a Change of Use at No.3 (Yard), Barrack Street, Ennis, Co Clare from a (previous) Car hire Service yard to an Open Air Eatery with Ice Cream Vending Unit, Toilet / Sluice Room Facilities and a Steel Frame Gazebo
For a period of 5 years for 1) the change of use from car parking/hard standing area to a fertilizer compound storage area, 2) the erection of a 2.4m perimeter fence with access gates, 3) the installation of temporary office and associated site development works and services
To demolish the existing premises and to construct a new mixed use development building with light industrial/shop use and offices with associated site works and services
For change of use and convert 2nd floor office to a self-contained apartment
To RETAIN works including roof structure above garage, adjoining meeting room and additional blockwork on boundary wall
For the development which will consist of: (a) to demolish fire damaged former furniture store and ancillary buildings along with the demolition of an existing 2 storey commercial/retail building adjoining same. (b) The construction of a new 2 and part 3 storey building compromising the following accommodation: Ground floor, commercial (retail, and office) area (252m2), along with accommodation entrance lobby to access floors above. First floor, 3 no., 2 Bed-apartments. Second Floor, 2 no., 2-Bed apartments. Development to total 790m2 in floor area and include all associated signage & shop fronts, site works and ancillary works along with connection to existing public sewer and utilities
To construct an extension to the side of existing golf club house for use as an indoor virtual golf practice area/facility including all ancillary services and works
To Extend the Appropriate Period of Planning Permission for P19/95 to (1) demolish existing rear single storey extension; (2) construct a rear 2 storey extension; (3) make structural changes to front elevation
To make the following changes to the existing dwelling house a) demolish existing attached private garage; b) construct new rear extension; c) construct new detached private garage; d) minor elevational changes to the existing dwelling; e) construct new vehicular entrance to site and f) all associated site works
To construct a new extension to the rear of the existing dwelling house and a new standalone private shed to the side of existing house along with all associated site works and services
To construct an extension to the rear of the existing dwelling house along with all associated site works
For change of use of the first floor and a portion of the second floor commercial units into 3 no. residential apartment units. The development will include alterations to internal layouts, additional window to side elevation and all ancillary site works and services
Of a single storey extension, conservatory and shed, all to the rear of the property
To (a) create new shopfront for existing ground floor retail area (b) carry out internal alterations. (c) carry out fenestration changes, install new windows, doors and roof together with all site development works and services
For the conversion of existing shop and accommodation to 2 No. two-bedroom apartments, and for permission to construct a two-storey extension to rear of building to comprise of two bedrooms with internal modifications and changes to the façade of the building including connection to public services and ancillary site works
For development at Drumbiggle Road, Nos. 1-4 Buttermarket Street and Simm's Lane, Drumbiggle, Ennis, Co Clare. The proposed development will consist of demolition of existing structures at Nos. 1-4 inclusive Butter Market Street, and partial removal of the existing wall to the eastern boundary. Construction of 46 residential units in total comprising of a new 4 storey apartment building to Drumbiggle Road with 30 No. 2 bedroom apartments and 3 No. 1 bedroom apartments over semi-basement level with 20 car- parking spaces, secure bicycle store, bin store and plantroom; Digital Hub at ground floor level; New single store Cafe and Digital hub at ground floor to Simm's Lane; 4 Storey Apartment Building to Buttermarket St Lane with 7 No. 2 Bedroom Apartments; 6 No. 3 Storey Terraced town houses to Buttermarket Street, new substation, 5 new set-down car parking spaces, external hard and soft landscaping, lighting, solar panels underground services including drainage with attenuation tank and ancillary site works The site is in an Architectural Conservation Area. A Natura Impact Statement will be submitted with the application
To carry out the following works. The works will consist of the following: 1) The demolition of existing rear extensions, and upgrade works to the existing cottages, including two new extensions to the rear. 2) Connections for both cottages and proposed extensions to existing site services. 3) The upgrade and extension of existing footpath. 5) All ancillary and associated works. The development involves the carrying out of works to the exterior of structures which are located within an architectural conservation area and would materially affect the character of the area concerned. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project, and the screening report accompanies the application. In accordance with Articles 81 and 120 of the Planning & Development Regulations 2001, (as amended), Clare County Council has concluded from an EIA screening determination that no significant effects on the environment are likely as a result of the proposed development and that an Environmental Impact Assessment is not required.
To construct 4 no housing units along with all associated site works and services
To construct a private dwelling house, wastewater treatment system along with all associated ancillary site works
To change layout and design of dwelling house approved under planning permission Ref: P23-612 together with all changes to approved associated site development works and services
For the following works: to replace the twin/movable modular toilet units with temporary modular units to include toilet and changing rooms units
The development will consist of the construction of a two-storey infill building to an existing vacant site with ground floor retail unit, two storey duplex two bedroom apartment and first floor one bedroom apartment, with connections to services
Of the following development (a) of the existing temporary access gate at the side of dwellinghouse to provide off-street car parking