Domestic garage as built and associate works
Demolition of existing single storey dwelling house and shed, construction of new dwelling with single storey to front to match existing and two storeys to rear, new waste water treatment system and associated site works
Alterations and additions comprising the demolition of existing single storey sunroom to gable end, and the construction of a new single storey living room extension in lieu of same, together with the construction of a new 2 storey dormer extension to the rear, including alterations to exiting window openings to each gable end at first floor level, and new patio doors in lieu of an existing window opening to front elevation at ground floor level, and all ancillary site works, connecting into existing services, at an existing detached 2-storey dormer dwelling
Split-level dwelling with garage using the existing entrance and driveway and for a new effluent treatment system to current EPA standards and all ancillary site works
Reclamation of land through the filling of material comprising clay, silt, sand, gravel and stone on a site having an area of 4.88 ha for the purpose of improvement of land, together with site access and associated site works. This proposed development relates to an activity which requires a waste licence
Deposition of soil and stone over an area of c. 1.56 ha for the purposes of land improvement with an agricultural end use
Single storey dwelling house and domestic garage, upgrade of the existing site entrance and access driveway, on-site sewage treatment system and ancillary site works
Alterations and additions to an existing detached single storey dwelling.The proposed works will comprise alterations to the main entrance to the front elevation, including new velux rooflights to the front entrance hall, alterations to existing window openings to the front, side and rear elevations, and the construction of a new single storey extension to the northeast gable-end of the existing dwelling, together with all ancillary site works including connections to existing services
Change of use from residential to short-term letting use and associated works
For the completion of the partially constructed detached clubhouse and all ancillary site works, previously granted permission under Planning Application No. 17185
Detached single storey timber clad cabin for office and gym to rear/side of existing house along with associated ancillary works
Section 42 - extension of appropriate period - 16/176 - 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 13.76 ha to include one single storey electrical substation building, electrical transformer / inverter station modules, solar PV panels ground mounted on steel support structures, access roads, fencing and associated electrical cabling, ducting and ancillary infrastructure
Section 254 - Roadside Directional Signs - Location 6 Map WH3
Attic conversion consisting of 2 no bedrooms bath room and storage/study area. 2 no velux roof windows each to front and rear elevations 2 no gable windows one at each end at attic level. conservatory to rear
Use of building 2 as a self-contained granny flat including built in kitchen
Sunroom to the side of existing dwelling and PERMISSION to remove the entire pitched roof and demolish 111 sqm of the existing dwelling, erect a 272 sqm two storey extension to the first floor and sides of the retained 77 sqm structure with alterations and revisions to the elevations and internal layout along with an additional 32 sqm garage / store linking to the existing garage and all associated site development works
1) a single-storey sunroom extension to the north west elevation of the existing dwelling and 2) a domestic storage shed along with all associated site development works
2 no. single storey extensions to rear and side of existing house with ancillary works
New vehicular entrance onto R772/Old N11 and all associated site works
Proposed shale surfaced internal service road to service paddocks within a farm holding, and associated works
Demolition and removal of the existing 3 bed single storey detached dwelling ‘Woodview Cottage’ (84sqm) and for the construction of a new 4 bed two storey detached dwelling (180sqm), for connection to all existing site services above and below ground, for all associated hard and soft landscaping and for the construction of a new 1.2m high timber post and rail fence on the south eastern site boundary
Demolition of the existing attached garage and existing extension and for the construction of extensions to the side and rear of the existing dwelling and to upgrade the effluent treatment system to current EPA standards and all ancillary site works
Dwelling, wastewater treatment system to EPA standards, entrance and associated works
Extend the appropriate period of 16/516 - 60 solar panels on the roof of a grain store
RED III Category 3 Development - Construction of a solar PV energy development with an operational life of 40 years on three land parcels totalling approximately 203.5 hectares comprising the installation of approximately 806,630 sq. m. of photovoltaic panels on ground mounted frames and associated ancillary development including: 23 no. transformers stations, 2 no. Ring Main Unit buildings, string-inverters attached to panel frames, CCTV security cameras mounted on 4 metre high poles, deer-proof perimeter security fencing (2 metres high) raised 150mm to allow for the movement of small mammals, 3 no. site entrances utilising existing entrances including upgrade to entrance on L1111 to facilitate construction and operational phase access, internal access tracks between the solar arrays and the site entrances, 2 no. clear span bridges over existing watercourses, 1 no. primary temporary construction compound and 2 no. satellite temporary construction compounds, all associated ancillary development works including landscaping; and the installation of a total of ca. 6.1 kilometres of 33Kv double circuit underground cable, of which ca. 2.4 kilometres will be beneath public (L1111, L1113, L5113, L51132 and L5112) and private roads in an excavated trench including underground ducting and joint bays and all associated site development and reinstatement works to connect the proposed Ring Main Units on two of the land parcels of the solar PV energy development and extending to the site of a proposed 110kv substation to be the subject of a separate planning permission under the Planning and Development (Strategic Infrastructure) Act 2006.
High-power electric vehicle charging points and associated infrastructure consisting of the following: I. installation of 8 no. electric vehicle charging bays with 8 no. Tesla illuminated charging units and associated signage, II. installation of proposed Tesla supercharger power cabinet equipment, III. installation of proposed modular substation, IV. erection of associated EV signage, V. all associated site development works including surfacing, lighting & line marking
The installation of solar panels over the roof of an existing telecommunications cabin on a steel frame (covering an area of c.46 sq.m., to a maximum height of 4.6 metres above ground level). Works to consist of all ancillary development works, including steel uprights at
Converted attic space to habitable accommodation and retention of balcony with spiral staircase to eastern elevation of dwelling, all ancillary to the use of this single dwelling and associated works
Proposed two storey extension to dwelling and to upgrade the existing sewage treatment system
Removal of existing septic tank, installation of new septic tank, percolation area to current standards and associate works
Converted attic space to habitable accommodation and retention of elevated balcony with spiral staircase to eastern elevation of dwelling and associated works
The installation of underground electrical infrastructure between the existing Arklow Gas-insulated Switchgear (GIS) 220kV Substation and the permitted Pollahoney GIS Substation. This will include the installation of approximately two underground electricity cable circuits, each at 3.12km in length and associated underground ducting, horizontal directional drilling, joint bays, communication cabling infrastructure between the existing Arklow GIS 220kV Substation and the permitted Pollahoney GIS substation, (WCC reg ref 20/1285). All associate and ancillary site development, remedial and construction works will be concentrated along the public road network, i.e. R772, L2180, L6179-0 and L-61791-0 to facilitate the underground cabling infrastructure within the townlands of Killinskyduff, Tiknock, Kilbride and Shelton Abbey. The application will include an Environmental Impact Assessment Screening Report (EIA)
Single storey extension (19.25 sqm) to side of existing dwelling, all above with associated site works
Partial demolition works to existing single storey dwelling and the construction of new single storey extension and alterations to the existing building footprint, site boundary works comprising the setting back of a portion of the existing roadside boundary and all other ancillary works
Single storey dwelling with well, shared vehicular entrance and for a new wastewater treatment system to current EPA standards and all ancillary site works
Demolition of fire damaged dwelling and proposed replacement dwelling with new waste water treatment system to EPA standards in lieu of existing system and associated works
The construction of a domestic single storey extension to existing dwelling and all associated works
Alterations and additions to an existing single storey detached dwelling, comprising the construction of a new single storey utility room extension to the rear, the construction of a new single storey bedroom extension to the front elevation, and the conversion of an existing detached garage area into home office, together with the construction of a new single storey domestic garage to the side of the existing dwelling, including all ancillary site works. Retention permission is also being sought for the conversion of an existing detached single storey garage structure into ancillary games/garden room at the same address
Dwelling, garage, waste water treatment system to EPA standards, entrance and associated works
Proposed alterations to existing side extension including new roof structure and proposed rear extension to dwelling, retention of domestic storage shed on site and replacement waste water treatment system to EPA standards and associated works
The construction of a new dwelling, wastewater treatment unit & polishing filter, new well, new entrance onto existing lane, upgrading existing entrance onto public road and associate works
Section 254 - Roadside Directional Signs - Location 4 Map WH2
Proposed extension to the side and rear of existing dwelling and associated works
The construction of a bungalow with garage, new entrance off existing lane, new treatment system and percolation area to current EPA standards and all ancillary site works
Construction of new two storey rear extension, internal layout changes to existing section of dwelling, removal of existing septic tank, new wastewater treatment unit & soil polishing filter and associate works
For a new dwelling, new entrance onto public road, wastewater treatment unit and soil polishing filter, new well and associated works
Demolition of existing outbuilding to make provision for new extensions to front, rear and side of existing dwelling, alterations to elevations, provision of a new garage along with upgrade of sewerage treatment system to current EPA standards and all associated site works
Construct (i) storage shed (ii) reroof existing cubicle shed and extend cubicle shed with slatted tank and all associated site works
Section 254 - Roadside Directional Signs - Location 3 Map WH1.
To relocate existing vehicular entrance to our home to improve sightlines to public road and associated site works