For the development this site at the townlands of Mogullaan, Crossagh, Rathlaheen South, Culleen, Drumline and Ballycasey Beg, Co Clare. Planning Permission is sought for a duration of 10 years, with an operational life of 35 years from the date of commissioning. The proposed development comprises the construction and operation of a solar photovoltaic (PV) farm on a site of approximately 95 hectares. The project includes: (i) Ground-mounted solar arrays supported by steel frames, with an internal network cable facilitating connection to the Drumline 110kV substation. An internal network cable will be installed to enable an under-the-fence connection from the onsite transformer compound to the adjacent substation. The transformer compound will include an Independent Power Producer (IPP) building, a 110kV transformer, and an 18-metre-high lightning monopole mast. (ii) Underground electrical cabling and ducting, security fencing, CCTV stands. (iii) New internal access tracks and site entrance. (iv) Site drainage. (v) All ancillary site development works and apparatus. A Natura Impact Statement will also be submitted to the Planning Authority with this application
For the construction of an internal first floor mezzanine to the Northeast and Southwest sides of Building 3, Block, Airport Avenue, Shannon Free Zone, Shannon, County Clare. The proposed mezzanine floor of 885m2 will house offices, laboratories and plant. The existing ground floor will house offices, clean rooms, storage and associated welfare facilities. The development also consists of alterations to the existing roof to provide permanent stair access for maintenance and associated site and services works
For the development of an extension to the existing light-industrial manufacturing facility, consisting of a single storey of high bay warehousing with ancillary office, manufacturing, and R&D areas over 3 storeys resulting in a combined 5100m² of new floor area, with screened roof level plant. The development will include the provision of 3 no. ramped loading bays, 3 no. at grade loading doors and associated construction and upgrade of ancillary yard/marshalling areas, as well as the inclusion of a fire suppression storage tank and associated pump house, building signage, upgraded campus entrance signage and all ancillary landscaping, site works and services. The building is to replace the existing structures on site, the demolition of which was permitted under Pl.Ref no: 23/552.
For development consisting of the alterations of approved signage with the relocation of 2 of the 3 signs to Building 3 indicated in the original planning application. The proposed signs are to be illuminated and are 8m x 1.6m (L x H) and feature the company logo, name and are of the same size as the signs indicated in the original planning application ref: P18912
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
For repair and refurbishment to a localised area of an existing car park to be repurposed as an Aerial Mobility Research Hub. Works to include one number ancillary office and perimeter fencing with all associated site works and services
For a period of 3 years for the provision of single storey prefabricated temporary office accommodation and all associated site development works
For the construction of three external monolith signs to the perimeter of Buildings 2 and 3 and one fixed sign to the service yard of Building 2,
For the extension of the services yard at Building 2, Block K, Airport Avenue, Shannon Free Zone, Shannon, Co Clare to accommodate a new gas compound, pipe rack and all associated site development works. The development will also consist of alterations to the existing car parking bays to the southeast of the site
For the construction of a two storey external plant structure and single storey external bin store within the existing service yard
For the construction of an internal first floor mezzanine to the North East, North West and South West sides of Building 2, Block K, Airport Avenue, Shannon Free Zone, Shannon, County Clare. The proposed mezzanine floor of 1517m2 will house laboratories and plant. The existing ground floor will house offices, clean rooms and associated welfare facilities
For alterations to the existing south west elevation and works to the existing roof at Building 2, Block K, Airport Avenue, Shannon Free Zone, Shannon, County Clare. The works to the façade include the addition of fresh air intake louvres, alterations to the existing roller shutter doors and the addition of an external canopy. The works to the roof include the provision of additional roof cowls and access hatches
For development consisting of the alterations to the approved signage indicated in the original Building 2 planning application, to omit two of the four signs and to illuminate the remaining two signs. The proposed signs are 8m x 1.6m (L x H) and backlit. The proposed signage features the company logo, name and are of the same size as the ones indicated in the original Planning Application Ref: P18912.
The development consists of the construction of a series of M&E Buildings to the yard of Building 2. There is a requirement for four buildings, to house a transformer, a substation, a RMU and a sprinkler tank room. We are also seeking PERMISSION for a sprinkler tank. We are proposing three ancillary plant compounds, housing the chiller plant, bin store and Air Conditioning Units. We propose minor changes to the elevations to include louvres and doors to access the proposed plant. There are minor amendments to the landscaping between buildings 2 and 3 to improve access to the site
The development consists of the alterations to the previously granted permissions (Planning Ref: P20/478 & P20/416) comprising of revisions including, the relocation of the external enclosed yard from an East/West orientation to a North/South orientation, relocating louvres to the elevations to suit servicing requirements, amending the roof layout & positions of roof cowls and several internal layout amendments to the PMU Warehouse area of the plan. Note: there is no increase in floor area, the mezzanine grid floor supports additional plant only. The proposed development also includes the addition of a new canopy structure above a new entrance to the South West Elevation, a new roller shutter door, a new window and external door to an office space and obscure glazing for privacy along the North West Elevation
The development will consist of the construction of a mezzanine floor to the North West side of the building which will house laboratories and plant (366m2) and a separate plant deck (156.5m2). The total additional mezzanine floor area is 522.5m2. The Ground floor will house the main office and pharmaceutical pods. We are also proposing minor changes to the elevations to include the developed and fixed louvre positions associated with the plant
For development of a 110m2 extension to the southeast corner of the existing hangar building to facilitate G700 aircraft, including all associated site works
For the addition of an air handling unit platform and containment enclosure together with the extension of an existing stair core to roof level to provide permanent access for maintenance including all associated site works and services
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
To construct a dwelling house and garage, with wastewater treatment system of mechanical aeration system and polishing filter, and associated ancillary site works
For the construction of a single storey extension to the South West side of Building 2, Block K, Airport Avenue, Shannon Free Zone, Shannon Free Zone, Shannon, Co Clare. The proposed extension of 250m2 will house a goods in and out, office, stores and plant rooms. The development will also consist of external roof access stairs, canopy and associated site works
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For development, the development consists of the construction of a milking parlour and associated site works
To construct a single dwelling house, garage and advanced wastewater treatment system along with ancillary site works
For the construction of single storey services building, bulk storage vessel, services pipe rack and all associated site development works in the existing services yard
For the modifications to the existing service yard at Building 2, Block K, Airport Avenue, Shannon Free Zone, Shannon, County Clare. The proposed development consists of permission for the RETENTION of the bin store (change of plan as previously granted under planning reference P2145), the construction of a new roof to the existing bin store, construction of single storey services building, the relocation and replacement of 3 no. gas enclosures with 6 no. gas enclosures and all associated site development works
To erect 658.36 m2 of photovoltaic panels on the roofs of the building, with all associated site works at Reagecon Diagnostics Limited, Bay F21A-23A, Shannon Free Zone, Shannon, Co. Clare V14 X073. A Glint and Glare assessment will be submitted with the planning permission application
For the construction of 40 no. additional car parking spaces within existing industrial facility and associated site works
To construct a single storey dwelling house, wastewater treatment system /soil polishing filter and all associated site works.
For alterations to the front and side elevations of existing industrial buildings and associated site works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
At a site of 0.17ha at Shannon Airport, Shannon, Co Clare. The application for Planning permission consists of the demolition/removal of existing accommodation structure (c. 60 sq m), and construction of a one-storey structure located between the existing Search and Rescue (SAR) Hangars 3 and 4. The structure will be c. 374 sq m, c. 4.2 m in height, and will comprise SAR on-shift accommodation with ancillary facilities including bedrooms, kitchen, operations room, changing rooms, and storerooms. The development also comprises: plant and equipment (including generator and gas tank compounds); modifications to existing car parking provision (increase in quantum of 1 no. car parking space); bicycle parking; lighting; drainage (including provision of permeable paving and attenuation tank); fencing; hard and soft landscaping; and all associated site works above and below ground
To a) demolish existing conservatory b) construct rear extension together with all ancillary site development works and services
For alterations to the existing West façade together with provision of a plant compound, ancillary buildings and alterations to the existing site layout at Bay 37A and 37B, Shannon Free Zone, Shannon, Co Clare. The proposed works will involve alterations to the existing West façade including the replacement of existing roller shutter doors with smaller personnel doors, the provision of a new roller shutter door and the removal of existing upper-level windows. Alterations to site layout will include the provision of a first floor plant compound, dust extract manifold, new standby compressor and compound, ESB substation, transformer compound, MV/LV switch room, bulk storage units and bulk gas storage, 32 no new car parking spaces, together with all site works and services
For development at this site in the townlands of Clonloghan and Caherteige, Co. Clare. The proposed development consists of an amendment to Condition No. 4 of the previously approved parent planning permission (Planning Ref. 18585), which relates to the operational life of the development. The proposed amendment seeks to extend the operational life of the permitted development from 25 years to 37 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
For an extension to an existing ESB Substation and all other associated site works.
For the Construction of a Dwelling House, wastewater treatment system and new entrance including ancillary site works
For the construction of a storey & half extension to existing dwelling to include 3 no. bedrooms, 2 bathrooms, utility, study, store & link corridor. Permission is also sought for the demolition of rear extension & side extensions & for permission for alterations and renovation of existing dwelling house & for the installation of treatment plant & percolation area including all ancillary site works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
For temporary use of a hard-standing area for the breaking-up of end-of-life aircraft for recycling purposes
To construct a new two storey four bedroom dwelling house, together with a detached garage, new site entrance and on-site wastewater treatment system along with all other associated site works and services
For the installation of a domestic waste water treatment system with polishing filter to serve existing house together with all associated siteworks
To construct single and two storey side extensions. Modifications to existing front facade and extensive internal renovations. New wastewater treatment system and all associated site works to existing dwelling house
To demolish rear shed/garage. Construct rear / side extensions. modifications to front façade, new front porch with extensive internal renovations and all associated site works to existing dwelling house
For an extension to dwelling house and carrying out of ancillary works
For the change of use of existing detached garage to granny flat with disabled access including alterations to existing building, connection to existing services & all ancillary site works
For the construction of an Advanced Aerial Mobility Research Lab with a new hard surfaced hangar apron and taxiway to existing taxiway. The works include connection to N19 for site access via currently approved Planning ref 23-96, the provision of 48No. carparking spaces which include accessible spaces, EV charging areas, set-down area, secure bicycle parking spaces, louvred plant/refuse store, photovoltaic array, reconfiguration of airside/landside boundaries, building signage and a single storey substation/switchroom with all ancillary landscaping and associated site works & services including rising main with installation of a new pumping station to facilitate connection to existing airport infrastructure. The planning application is accompanied by a Natura Impact Statement
For the construction of a two-storey extension to the rear of the existing dwelling, the construction of a single-storey extension to the side of the existing dwelling, the removal of existing extensions to the side and rear of the existing dwelling, the replacement of existing windows and associated site works
For development at Rineanna South, Shannon Airport, Co Clare. The development consists of the construction of a single storey high-bay Air Cargo Hub and logistics/distribution facility (2705m2) with ancillary single storey office area (335 m2). The works include a new site access and the provision of 42 no carparking spaces which include accessible spaces, secure bicycle parking spaces, louvred plant/refuse store, photovoltaic array, building signage and a single storey substation. The construction of new hard surfaced ancillary delivery/service yard with vehicular and HGV parking all ancillary landscaping and associated site works and services including the decommission of adjacent septic tank and installation of a new pumping station to facilitate connection to existing airport infrastructure. The planning Application is accompanied by a Natura Impact Statement
For the refurbishment of existing derelict dwelling and for the construction of an extension to same to comprise of kitchen/dining, bathroom and en-suite including ancillary site works