CONSTRUCTION OF A SINGLE STOREY PORCH EXTENSION TO THE SOUTH, SINGLE STOREY EXTENSIONS TO THE NORTH, AMENDMENTS TO EXISTING WINDOW AND DOOR OPES TO THE NORTH, ADDITIONAL WINDOW OPES TO THE EAST & WEST (ALL AT GROUND FLOOR LEVEL). A FIRST-FLOOR EXTENSION TO THE NORTH TO INCREASE ACCOMMODATION TO PREVIOUSLY APPROVED ATTIC CONVERSION INCLUDING A BALCONY, ROOFLIGHTS AND ALL ASSOCIATED INTERNAL MODIFICATIONS AND SITEWORKSDecision record indexed
Dwelling at Main Street, Killeigh Village, Killeigh Co Offaly
The refurbishment of dwelling including re-slating of roof with repairs to roof timbers and chimneys, replacement of rainwater goods. Proposed new windows, repairs to lime render including removal of sand and cement render. Proposed removal of dilapidated gable at rear and lowering of abutting lean-to wall at front, stitch repairs to cracks in structure, proposed lowering of ground levels around house, refurbishment of existing rear extension with a new roof, external insulation and relocation of a window. Proposed new opening in rear elevation for double doors and new opening in west elevation for new window. Proposed demolition of concrete out-house. To front, new low boundary wall with railings and pedestrian gate to front garden and new vehicular gates. Internally, removal of all vegetation and non-original fixtures and fittings, replacement of all rotten and damaged timbers and treatment of all timbers for fungal and insect infestation, repair to timber floors including joists, floorboards and skirtings, insulation between ground floor joists, removal of non-original coloured concrete floor slab in hall and replacement with new insulated floor slab, repair to lime plaster and breathable insulation to walls, repair to ceilings and cornices, insulation to attic floor and new attic hatch. New bathrooms and utility room in extension, new en-suite and wardrobes in master bedroom, new kitchen and joinery throughout, new plumbing and electrics throughout, new decoration including internal and external painting in breathable paint. All associated site works including services, drainage and hard and soft landscaping. This property is a Protected Structure and formerly an RIC BarracksDecision record indexed
Construct a dwelling house with a new entrance, detached garage, onsite wastewater treatment system and all associated site works and the relocation of the existing field entrance gateDecision record indexed
THE CONSTRUCTION OF A SINGLE-STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKSDecision record indexed
1.Extension to existing dwelling house at ground floor 2. Dormer roof construction and increase in ridge height to accommodate habitual room 3. Amendment to elevations, 4. All associated site worksDecision record indexed
A) CONSTRUCTION OF SILAGE PIT B) CONSTRUCTION OF CUBICLE SHED WITH ASSOCIATED UNDERGROUND SLATTED TANKS C) INSTALLATION OF SOLAR PANELS ONTO ROOF OF PROPOSED CUBICLE SHED AND ALL ASSOCIATED SITEWORKSDecision record indexed
(A) CONSTRUCTION OF A NEW ENTRANCE AND ACCESS ROAD; (B) CONSTRUCTION OF A MILKING PARLOUR, DAIRY & ANCILLARY ROOMS, DRAFTING & HANDLING FACILITIES, WAITING YARD & UNDERGROUND SLATTED TANK; (C) ERECTION OF MEAL BIN, WATER STORAGE TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
(A) FOR EXCAVATION WORKS (B) PLANNING PERMISSION FOR CONSTRUCTION OF STRAW BEDDED LIVESTOCK SHED WITH UNDERGROUND SLATTED TANK AND ALL ASSOCIATED SITEWORKSDecision record indexed
AMENDMENTS TO AND RELOCATION OF MILKING PARLOUR, COLLECTING YARD, UNDERGROUND SLATTED TANK, MEAL BIN AND WATER STORAGE TANK AND ALL ASSOCIATED SITE WORKS GRANTED PLANNING UNDER REF: 19585Decision record indexed
THE MACRA HALL KILLEIGH & MILLBROOK, KILLEIGH, TULLAMORE CO OFFALY
A) A SINGLE STOREY EXTENSION TO FRONT OF THE EXISTING BUILDING, B) A SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING BUILDING, C) ALTERATION AND REFURBISHMENTS TO THE EXISTING BUILDING, D) A NEW SITE ENTRANCE, E) NEW CAR PARKING AND ALL ANCILLARY WORKSDecision record indexed
WALSH ISLAND GAA CLUB, WALSH ISLAND, CO. OFFALY R35 CR28
THE CONSTRUCTION OF AN EXTENSION TO THE FRONT AND SIDE OF THE EXISTING WALSH ISLAND GAA CLUB BUILDING APPROXIMATELY 150 SQ.M IN SIZE, CONTAINING MEETING ROOMS, KITCHEN/ FOOD PREPARATION AREA, TOILETS AND STORAGE, INCLUDING ALL ASSOCIATED SITE WORKS, WITH ACCESS THROUGH THE EXISTING ENTRANCEDecision record indexed
A PROPOSED 30 METRE HIGH LATTICE TELECOMMUNICATIONS STRUCTURE WITH ANTENNAE, DISHES AND ASSOCIATED EQUIPMENT, GROUND EQUIPMENT AND ALL ASSOCIATED GROUNDWORKS. WORKS TO INCLUDE A 2.4 METRE PALISADE FENCED COMPOUND. ACCESS TO BE VIA AN EXISTING FIELD ACCESS AND TRACKDecision record indexed
A SINGLE STOREY TIMBER FRAME CABIN WITH BARBEQUE AREA AND DOMESTIC STORES TO THE REAR OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKSDecision record indexed
A BUNGALOW, PROPRIETARY WASTEWATER TREATMENT SYSTEM & POLISHING FILTER, DOMESTIC GARAGE, NEW ENTRANCE AND ALL NECESSARY AND ASSOCIATED SITE WORKSDecision record indexed
A Bungalow Type Dwelling & Domestic Garage with Effluent Treatment System & Percolation Area With New Vehicular Entrance and all associated site worksDecision record indexed
EIR EXCHANGE, BALLINTEMPLE WALSH ISLAND, CO. OFFALY
THE REPLACEMENT OF AN EXISTING TELECOMMUNICATIONS SUPPORT STRUCTURE (OVERALL HEIGHT OF 14.5 METRES), WITH A PROPOSED NEW LATTICE TOWER (OVERALL HEIGHT OF 25.5 METRES) CARRYING TELECOMMUNICATIONS EQUIPMENT TRANSFERRED FROM THE EXISTING STRUCTURE AND THE ADDITION OF NEW TELECOMMUNICATIONS ANTENNAS, DISHES AND ASSOCIATED EQUIPMENT, TOGETHER WITH NEW GROUND LEVEL EQUIPMENT CABINETSGrounds not yet categorised
(1) construction of a new external underground slatted slurry storage tank for livestock use including feed barriers and feeding area to rear of existing farm building, completed with associated siteworks, and (2) Retention Permission for farm building for housing of livestock as constructed including associated siteworks. The proposed development is within the curtilage of a protected structure, Cloncon, number 33-03, NIAH Reference 14917009.Decision record indexed
THE ERECTION OF A NEW STOREY AND A HALF DWELLING WITH CONNECTION TO A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA, AND THE ERECTION OF A NEW SEPARATE DOMESTIC GARAGE, AND ALL ANCILLARY SITE WORKSDecision record indexed
THE ERECTION OF A NEW DORMER STYLE DWELLING WITH CONNECTION TO A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA, AND THE ERECTION OF A NEW SEPARATE DOMESTIC GARAGE, AND ALL ANCILLARY SITE WORKSDecision record indexed
(A) CONSTRUCTION OF A LIVESTOCK UNDERPASS UNDER THE L1014 AND EFFLUENT HOLDING TANK (B) CONSTRUCTION OF NEW ENTRANCE WITH NEW HEDGING AND METAL RAILING ALONG BOUNDARY (C) CONSTRUCTION OF EXTENSION TO PUBLIC FOOTPATH ACROSS PROPOSED ENTRANCE (D) CONSTRUCTION OF NEW ACCESS ROADWAY WITH THE CLOSING OF EXISTING ENTRANCE AND ALL ASSOCIATED SITEWORKSDecision record indexed
(A) 1 NO. NEW BUNGALOW TYPE DWELLING, (B) 1 NO. NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKSGrounds not yet categorised
THE HOPPERS PUB, WALSH ISLAND, CO. OFFALY R35 H2T0
DEMOLITION OF AN EXISTING PUBLIC HOUSE FORMERLY KNOWN AS THE HOPPERS PUB, EXISTING DERELICT SHOP AND EXISTING SHEDS, CONSTRUCTION OF 8 NO. TWO STOREY SEMI-DETACHED, 3 BEDROOM TOWNHOUSES, NEW VEHICULAR ACCESS ROADWAY, BOUNDARY TREATMENTS AND ALL ASSOCIATED SITE WORKS AND SERVICESGrounds not yet categorised
Bord Na Móna lands within the townlands of, Knockballyboy Clonad Rathfeston Gorteenkeel Island Clonarrow or Riverlyons Drumcaw or Mountlucas Esker Beg Killeen Ballyhugh Mullalough or Cavemount, Coole Toberdaly Newtown Ballycon Esker More Colgagh an
The development of a recreational shared cycle and walkway located on Bord Na Móna lands. The development proposes the following: a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 18,958 meters of existing former rail bed and 827 meters along pre-existing machine access routes. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Way within the townlands of Coole and Knockballyboy; the Public Amenity Facilities at Mountlucas Wind Farm within the townlands of Clonarrow or Riverlyons and Drumcaw or Mountlucas; and the Cloncreen Wind Farm Amenity Track within the townland of Clongarret. c) The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; i. 3 Type 3 Gateways, ii. 2 Type 4 Gateways, iii. 7 Minor Rest Points d) Upgrade works to 2 no. local access road crossings, and 6 no. agricultural crossings. e) Upgrade works to the Croghan Tippler Bridge (BNM Ref 37-109) and the Ballycon Rail Bridge (BNM Ref 37-112). f) The construction of a new pedestrian and cycle bridge extending to 30.5 meters spanning the Grand Canal within the Coole townland, located adjacent to the existing Grand Canal lift bridge (BNM Ref 37-05). g) The erection of wayfinding and interpretative signage at Gateway locations along the route. h) The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. i) Fencing and screening will be erected where required for biodiversity reasons which will include 7,636 meters of ecological screening. j) All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
PROPOSED SINGLE STOREY TYPE DWELLING WITH DOMESTIC GARAGE, NEW VEHICULAR ENTRANCE, SEPTIC TANK WITH PERCOLATION AREA AND SECONDARY EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKSDecision record indexed
A STOREY-AND-A-HALF EXTENSION TO THE SOUTH EAST AND A SINGLE STOREY EXTENSION TO THE NORTH EAST OF THE EXISTING DWELLING, THE ADDITION OF ROOFLIGHTS TO BOTH THE NORTH EAST AND NORTH WEST, NEW WINDOWS AND DOORS THROUGHOUT, THE RELOCATION OF THE MAIN DOOR TO THE NORTH EAST WITH AN ADDITIONAL WINDOW TO THE NORTH WEST, THE BLOCKING UP OF THE EXISTING SITE ENTRANCE, AMENDMENTS TO THE EXISTING ROADSIDE BOUNDARY WITH THE CREATION OF A NEW SITE ENTRANCE, ALL ASSOCIATED INTERNAL MODIFICATIONS AND SITE WORKS, INCLUDING A PROPOSED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTERDecision record indexed
THE CONSTRUCTION OF ONE WIND TURBINE WITH AN OVERALL HEIGHT OF UP TO 150M; THE CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISON OF A SITE ENTRANCE AND AN ACCESS TRACK WITH IN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRIC CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE DEVELOPMENT WILL HAVE A TOTAL OUTPUT OF UP TO AND NOT GREATER THAN 5MW'SGrounds not yet categorised
Demolition of an open sided lean-to fuel shed and a raised decking area in rear garden and constructing a detached log house and associated site worksDecision record indexed