Ref. No. P22/209 to construct a house, connections to public services, a public road entrance and associated site development works
To build a new dwelling, install a pre treatment waste water treatment system connect to public services & all other associated site and ancillary works
Ref. No. P21/846 to construct a dwelling house, site entrance, connect to public services and carry out all ancillary site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To renovate & extend the existing dwelling house, and all associated site works
For a development comprising of: 8 no. industrial units, an entrance, connection to services and all associated site works
To build a new dwelling, install a wastewater treatment system, create a new entrance onto the public road and all associated site and ancillary works
For the following development: for the construction of a Multi Use Games Area (MUGA) with associated site fencing, netting, artificial surface, 4 No. 10m floodlighting poles, associated fittings and all associated ancillary site works
To construct a single storey dwelling house, upgrade existing entrance, remove existing shed, remove existing decommissioned septic tank, utilise existing connection to public sewer, and all associated site works
The development will consist of the construction of a 14.0SqM extension to the front/north: a 12.5SqM extension to the side/west, and a 15.5sqM extension to the rear/ south with replacement to existing windows and alterations to site works and services
To construct an extension to the side of the existing dwelling with all associated site works.
For the following works, (A) change the use of the development granted under existing permission P19-333 as a retirement village and presently under construction, to use as residential, (B) change the internal layout, including minor elevational changes to the refurbished convent building as granted, and presently under construction, to provide 13 apartments made up of 1 x 1 bedroom apartment, 10 x 2 bed apartments and 2 x 3 bed apartments and (C) change the site boundaries and layout as granted, all with associated site works
To demolish existing loading bay and to construct an extension along with associated site works and services
Of 2 electronic signs and associated works
To construct a sitting room extension to an existing dwelling house
To construct a dwelling house, entrance, wastewater treatment system and all associated site works
To construct a dwelling house, garage, farm store, wastewater treatment system, road entrance and associated site works
Of existing rear extension to dwelling
The development will consist of the renovation and extension to the existing derelict dwelling house and the installation of a proprietary waste and percolation area together with ancillary site works
To demolish an existing rear extension and to construct a new rear extension and to demolish an existing dormer window and to construct a new dormer window and all associated site works
Of the existing single storey utility and PERMISSION to complete works
For (a) the construction of a single storey extension to the side and rear of an existing dwelling, (b) the conversion of the existing attic space into habitable rooms, (c) modifications to the existing roof including an increase in the ridge height, (d) modifications to the elevations of the existing dwelling and all ancillary site works
The development will consist of: 1. Construction of a new 2-storey school building (1863.6 m2) incorporating 8 classrooms, general purpose room, library, offices, resource and learning rooms and associated ancillary accommodation; and a single classroom Special Education Needs Unit with associated facilities. 2. New site structures and features including retaining walls, cycle area, bin store, mechanical plant compound, hard play court, play areas, sensory garden, tiered seating areas, site furniture and child play installations. 3. New internal site pedestrian and vehicular transport layout including internal roads and turning areas, pedestrian paths, parking for 19 cars, bus and car drop off areas and right of way access points to neighbouring properties. 4. Realignment and widening of the existing north-western entrance to the site on the L1050 Ballinagaddy Road including demolition of existing boundary walls, hedgerows and gate and construction of a new set back vehicular entrance to the east of the existing entrance; with new boundary wall/fence, gates, landscaping and signage. 5. Alterations to the existing north-eastern pedestrian entrance to the site on the L1050 Ballinagaddy Road including repair/re-rendering of block walls to existing set back entrance (including shared boundary wall with Andersons Cottage, a Protected Structure) and replacement of gates. 6. Upgrading, repair and replacement of existing boundaries throughout including boundaries with neighbouring properties with rendered block walls, natural stone walls and metal fencing. 7. Site soft landscaping works throughout including demolition and removal of existing hedgerows, raising and lowering of ground, site soft landscaping including hedges, shrubbery and trees. 8. And all associated site works including site services, site lighting, subsurface attenuation tank and site hard landscaping. The total site area is 3.41 Acres. A Natura Impact Statement (NIS) will be submitted to the local authority with the Planning Application
To construct a dwelling house, garage, wastewater treatment system, percolation area, new entrance onto local road and all ancillary site works
To place a mobile home (for temporary use during construction) connected to wastewater treatment system & percolation area as per granted planning permission P22/881 and all ancillary site works
The development will consist of the permanent change of use of the existing Family Resource Centre building, from community support facility to Creche and preschool, with RETENTION of the following: changes to fencing to external play area; additional fencing around main entrance; new fire escape door; replacement of door with window; and 3No storage sheds and a Polytunnel
To construct single storey side / rear extensions. Modifications to existing house with new side entrance on northeast gable. Increase width to vehicular front entrance and all associated site works
To extend a dwelling and porch
To develop the top floor of the existing apartment building into 2 no. apartments and all associated site and ancillary works
For the demolition of an existing rear extension and construction of a new rear extension, modifications to existing road entrance and associated site works
The development will consist of the demolition of the existing 2.0SqM Porch, and the construction of a 23.5SqM extension to the side/south-west; a 11.5SqM Porch extension to the front / south-east; raise the pitch of the roof by 1.1M to form new 60.0SqM upper floor accommodation; with new rooflights, replacement to existing windows, and alterations to site works and services
For demolition of existing dwelling and construction of new two storey dwelling with integral garage and associated landscaping
To Extend the Appropriate Period of Planning permission for P21/470 for demolition of existing dwelling and construction of new two storey dwelling with integral garage and associated landscaping
The development will consist of construction of an extension and alterations to existing house as follows: 1) Removal of existing roof, 2) replacement of existing corrugated steel roof in slate, with the addition of two sky lights, 2) provision of one new window opening to the front and one to the rear, 3) enlargement of one existing window opening 4) replacement of existing front windows and 5) plastering of part of one stone wall
To Extend the Appropriate Period of Planning Permission for P20/148 the development will consist of construction of an extension and alterations to existing house as follows: 1) Removal of existing roof, 2) replacement of existing corrugated steel roof in slate, with the addition of two sky lights, 2) provision of one new window opening to the front and one to the rear, 3) enlargement of one existing window opening 4) replacement of existing front windows and 5) plastering of part of one stone wall
For the following works a) to construct a two-storey side extension and single-storey rear extension to existing house b) a new boiler house c) single storey office/store d) new front boundary wall along with associated site works
For development which will consist of the demolition of existing single storey garage, construction of new storey and a half one bedroom studio accommodation, new boundary fencing and gates, on site parking, connection to public mains water and sewage and all associated site works
To build a 2 storey Town House to replace the existing shed, connect to services and all associated site and ancillary works
For the following: a) to increase the ridge height of the dwelling house, increase the roof overhang at the rear single storey section of the dwelling house and changes to the NE and NW elevations of the dwelling house from what was granted under P21-1072 b) to construct a new shed and associated wall c) additional landscaping works to the rear garden area along with associated site works
To construct front/rear extensions, attic conversion with 2 no. dormer windows and velux roof lights, new window to southwest gable along with all associated site works
To renovate and extend an existing three storey property. The works will include the demolition of the single storey rear section and its replacement on the same footprint with a commercial ground floor unit, a commercial unit on part of the 1st floor and a single residential unit on part of the 1st floor and the entire 2nd floor, to include a change of use for the residential element
To vary permission P21/185 by converting the entire building to residential use with ten (10) No. self-contained residential units and associated co-living facilities
The development will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
For development which will consist of the installation of a fresh milk vending machine housed in a garden shed like structure and associated site works
To build a single bedroomed maisonette, connect to public services & all other associated site and ancillary works
To change the use of the existing premises from commercial to community/education along with ancillary site works for a period of 5 years. This building is a protected structure (RPS No. 368)
For development at this site of Armsteads building (a protected structure), Bogbere Street, Ennistymon, Co. Clare. The development will consist of renovation of the existing protected structure and addition of two storey extension to rear, vehicular gate and associated landscaping and ancillary site works, for use as private dwelling with home office and three B&B guest rooms
For development at this site of Armsteads building (a protected structure) Bogbere Street, Ennistymon, Co Clare. The development will consist of renovation of the existing protected structure and addition of two storey extension to rear, vehicular gate and asociated landscaping and ancillary site works, for use as private dwelling with home office
To build a dwelling house, garage, install a wastewater treatment system, create a new entrance onto the public road and all associated site and ancillary works
To carry out the following development at Main Street, Ennistymon, Co. Clare. Rejuvenation and enhancement of the streetscape. The proposed development will include: 1) Undergrounding of overhead ESB cables and removal of poles. 2) Installation of new public lighting on decorative columns. 3) Expansion of pedestrian areas to include provision of street furniture. 4) Provision of new pedestrian crossing. 5) The installation of associated signage. 6) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. These works are located within the Ennistymon Architectural Conservation Area (ACA) and would materially affect the character of the ACA. There are a number of Protected Structures and Recorded Monuments within the vicinity