Construction of a dwelling house, wastewater treatment system and percolation area, domestic garage together with all associated ancillary worksDecision record indexed
The development will consist of the construction of 97 residential units consisting of: 19 detached housing units (4-bed), 33 terraced housing units (2, 3 & 4-bed), 9 own-door apartments (1 & 2-bed), 18 ground floor terraced own-door apartments (2-bed) and 18 own-door terraced duplex apartments (3-bed), creche / shell-space community building, new site access points (vehicular and pedestrian), site landscaping, boundary treatments, public lighting, connection to the existing site services (water and foul waste), and all other associated site worksDecision record indexed
Construction of 81 residential units, comprising of 19 no. detached, 14 no. semi-detached and 24 no. terraced housing units, and 24 no. apartment units, new site access points (vehicular and pedestrian), new boundary treatments, connection to the existing site services (water and foul waste), and all associated site works and landscapingDecision record indexed
CONSTRUCTION OF 46 NO. HOUSES (30 NO. DETACHED AND 16 NO. SEMI-DETACHED) WITH ASSOCIATED ROADS, FOOTPATHS, LIGHTING AND CONNECTION TO PUBLIC SEWER AND SERVICES.Decision record indexed
WESTPORT WASTE WATER, TREATMENT PLANT, THE DEMESNE
GROUND-MOUNTED PHOTOVOLTAIC SOLAR PANELS WITH A MAXIMUM SQUARE METERAGE OF 750 M2 DISTRIBUTED OVER A GRASS AREA ON-SITE WITH ASSOCIATED ANCILLARY WORKS. A NATURA IMPACT STATEMENT WILL BE SUBMITTEDDecision record indexed
Renovation & extension of the existing dwelling house and construction of domestic garage together with all ancillary site works.Decision record indexed
The development will consist of 1) retention of works completed, namely the removal of a chimney stack. 2) permission to renovate and extend existing dwelling house. 3) permission for the construction of a private garage and a separate home office. 4) permission to replace the existing effluent treatment system together with all ancillary site works.Decision record indexed
Permission for development at 11 Pearce Terrace, Westport, Co. Mayo. The proposed development will consist of the demolition of an existing two storey rear annex and shed, with the construction of a proposed two storey rear extension, refurbished primary roof, thermal upgrade works throughout with all associated site works.Decision record indexed
CHANGES TO HOUSE DESIGN AND SITE LAYOUT TO PREVIOUSLY GRANTED UNDER P12800140 FOR CONSTRUCTION OF 2 HOUSES WITH CONNECTION TO PUBLIC SEW/ER.Decision record indexed
FILLING OF LANDS WITH INERT WASTE CONSISTING OF SOIL AND STONE MATERIAL TO IMPROVE LAND FOR AGRICULTURAL USE (APPLICATION AREA = 1.9 Ha, VOLUME 100,000 TONNES OVER 10 YEARS) AND ALL ASSOCIATED ANCILLARY WORKSDecision record indexed
The proposed development will consist of the demolition of an existing two storey rear annex and the construction of a proposed two storey rear extension, with all associated site works.Decision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, TOGETHER WITH DETACHED GARAGE, NEW PACKAGED WASTEWATER TREATMENT SYSTEM, AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCT A PRIVATE DWELLING HOUSE DOMESTIC GARAGE PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY STIE WORKSGrounds not yet categorised
CONSTRUCT A PRIVATE DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY SITE WORKSDecision record indexed
(new) Adventure Park at the Quarry Westport Estate and adjoining ‘The Farmyard’ (a Protected Structure), Westport, Co. Mayo
Permission for development at the (new) Adventure Park at the Quarry, Westport Estate, Westport, Co. Mayo, and adjoining ‘The Farmyard’ (a Protected Structure) area, comprising additional and revised hard and soft landscaping, adventure and play features (including Slide Cover Structure (at bottom landing) c. 4.6m high, Climbing Tower c. 9.9m high, Totem Pole c. 4.5m high, and Assorted small scale (<3m high) play and sensory features) within the (currently under construction) Adventure Park, and all associated and ancillary works and development above and below ground (in part overlapping / amending existing Planning Permission References: P20/295 & P23/60189).Decision record indexed
Demolition of the existing rear shed and the construction of a proposed side extension, rear extension, front porch and changes to all elevations with all associated site worksDecision record indexed
CONSTRUCT A NEW SINGLE STOREY DWELLING HOUSE, TOGETHER WITH A DETACHED DOMESTIC GARAGE, NEW PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND OTHER ASSOCIATED SITE WORKS.Decision record indexed
Permission for development at and adjoining ‘The Quarry’, Westport Estate, Westport, Co. Mayo (and adjacent ‘The Farmyard’, a Protected Structure) amending Planning Permission Reference P20/295 (which permitted an Adventure Park), comprising alteration, omission and addition to the form and position of permitted ‘Park Attractions’ and all associated and ancillary development and works above and below ground level.Decision record indexed
PROVISION OF AN ADVENTURE PARK WITHIN THE WESTPORT DEMESNE, LOCATED AT THE DISUSED QUARRY WITHIN PART OF THE ADJOINING WOODLANDS. THE PROPOSED ADVENTURE PARK (OVERALL PLAN AREA OF 1.7 HECTARES) WILL CONSIST OF A VISITORS ENTRANCE BUILDING, (158SQM)- PROVIDING ENTRANCE TURNSTILES, PUBLIC TOILETS, ANCILLARY RETAIL, STAFF FACILITIES, STORES AND ANCILLARY SERVICES AND PARK ATTRACTIONS TO INCLUDE A NET PARK, LARGE SWING, JUNIOR SWING, ZIP LINE, CLIMBING ROPES, SLIDE, CLIMBING/ABSEILING TOWER AND ACTIVITY GARDEN ALL WITH ASSOCIATED LANDSCAPING, SEATING AREA, SITE SERVICES, LIGHTING, WALKWAYS, BOUNDARY TREATMENT AND ALL ASSOCIATED SITE WORKSDecision record indexed
CHANGE OF HOUSE TYPE TO THAT PREVIOUSLY GRANTED UNDER P16/182 AND TO RETAIN AND COMPLETE WORKS COMPLETED TO DATE, ALONG WITH CONSTRUCTION OF A DOMESTIC GARAGE, P01/218 ALSO REFERSDecision record indexed
The development will consist of the construction of a private dwelling house with connection to public services, together with all ancillary site works.Decision record indexed
The development will consist of a new four bedroom two storey house, domestic garage and septic tank / proprietary effluent treatment unit with percolation bed, together with all other ancillary site development works.Decision record indexed
Planning permission to construct a dwelling house with minor alterations on a revised site boundary with connection to public services together with all ancillary site works (Previous planning ref: P18/605)Decision record indexed
Construction of a new dwelling house, detached garage, wastewater treatment system, and all associated site works and landscaping.Decision record indexed
Demolish two existing sheds on site 44m2 and 13m2, and replace with new one and two storey infill dwelling house 172m2 and new single storey rear garden shed (16m2) and all associated site services and landscaping worksDecision record indexed
‘The Farmyard’ (a Protected Structure) Westport Estate, Westport, Co. Mayo
Permission for development at ‘The Farmyard’ (a Protected Structure), Westport Estate, Westport, Co. Mayo (to south of Farmyard complex and within existing forecourt / recreation area): comprising new hard and soft landscaping forecourt area, 2 no. canopy structures (up to c. 4.5m in height), (moveable) food and beverage facilities, and all associated and ancillary works and development above and below ground including removal of existing (modern) features (in part overlapping / amending Planning Permission References P20/295 & P23/60189).Decision record indexed
RETENTION PERMISSION FOR EXISTING REAR EXTENSION AND FRONT PORCH TO EXISTING DWELLING HOUSE AND PERMISSION FOR A NEW SIDE EXTENSION AND A NEW EFFLUENT TREATMENT UNIT AND PERCOLATION AREA AND DEMOLITION OF A PART OF THE EXISTING HOUSE AND THE ATTACHED SHED TOGETHER WITH ALL ASSOCIATED SITE WORKS AND CONNECTION INTO EXISTIING SERVICESDecision record indexed
SPORTS FACILITY COMPRISING FULL SIZE GRASS GAA PLAYING PITCH, ASSOCIATED PITCH FENCING, BALL FENCES AND SITE FENCING, PITCH FLOODLIGHTING AND SITE LIGHTING, SPECTATOR STAND, SPORTS BUILDING COMPRISING CHANGING ROOMS, TOILETS, GYM,MEETING ROOM, MULTI-PURPOSE ROOM AND ANCILLARY ACCOMMODATION, ACCESS FROM GOLF COURSE ROAD, CAR PARKING, BUS PARKING, SET DOWN AND WALKWAY/TRAIL AROUND THE SITE, ALL ANCILLARY SITEWORKS, RETAINING STRUCTURES, SERVICES AND LANDSCAPING. DEVELOPMENT IS PARTLY LOCATED WITHIN THE CURTILAGE OF PROTECTED STRUCTURES RPS NO. 077 WESTPORT HOUSE AND RPS NO. 080 COURTYARD BUILDINGSDecision record indexed
Permission to retain existing domestic storage shed, permission to construct machinery shed/boat repair and storage shed together with associated site servicesDecision record indexed
Gracy’s Restaurant The Farmyard Westport Estate, Westport, Co. Mayo
Permission for development at Gracy’s Restaurant, The Farmyard (a Protected Structure), Westport Estate, Westport, Co. Mayo, for the continued use (for up to 5 additional years) of the extension to the existing restaurant kitchen (within the Farmyard Courtyard) permitted under Reg. Ref: P22/60001, including the continuance of use of structures / works, service area / bin store, and all associated and ancillary elements, and for the subsequent removal of structures / features on expiry of permission and reinstatement of area to pre-existing condition.Decision record indexed
Gracy’s Restaurant The Farmyard Westport Estate, Westport, Co. Mayo
Permission for development (for a temporary period of up to 5 years) at Gracy’s Restaurant, The Farmyard (a Protected Structure), Westport Estate, Westport, Co. Mayo, consisting of an extension to the existing restaurant kitchen (within the Farmyard Courtyard). The proposed development comprises: 1) The installation / provision of single storey kitchen extension prefabricated structure measuring c. 42 sqm; 2) The provision of a corridor link / connection to existing Gracy’s kitchen / ancillary area measuring c. 8 sqm; 3) The provision of associated service area / bin store with screen enclosure to footprint within Farmyard Courtyard; 4) Water supply, drainage and electrical / utilities connections to existing networks, and all associated and ancillary works; and, 5) Removal of structure on expiry of permission and reinstatement of area to pre-existing condition.Decision record indexed