Retention permission for installation of 2 no. illuminated signs to the existing building. These signs consist of the installation of 1no. sign to the front (west) elevation and 1no. sign to the (north) elevation and all associated site works.
Construction of kitchen extension to rear.
Extension to existing garden room with the re configuration of roof and all associated site works.
Retention permission for hard stand area and for permission to complete works, incorporating the setting out of lorry trailer park, drainage network, attenuation tank together with Asphalt Concrete finish, and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.
Retention of standalone residential building located at first floor level with external staircase adjacent to existing industrial unit for exclusive residential use for associated Rewinds staff as residential accommodation consisting of three bedrooms, communal living area, communal kitchen area and all associated site works.
Change of use of part ground floor of existing office / warehouse premises to a Deli-Cafe (Delicatessen - Cafe) to include a new recessed shopfront, signage and associated alterations and modifications.
Roof dormer to the rear aspect of the roof and construction of a single storey 18sqm rear extension with flat roof.
Additional floor area of 82sq.m ground floor and 35sq.m first floor to allow reconfiguration of 4 double rooms to 8 single rooms, new ground floor storeroom and enclosing fire exit stairs; relocation of 8 car parking spaces to extended existing car park; all associated site works; proposed material finishes to match previously approved changes to previously granted permission SD20A/0153.
Permission for 609.5sq.m, 16-bed extension to existing Nursing Home which consists of new 443sq.m two storey 14 bedroom extension adjoining existing building to the west, new 64.3sq.m single storey 2 bedroom extension to south west wing of existing, new 102.2sq.m 2 storey extension of existing dining areas to the north, new garden lawns and walkway with hard landscaped areas to north west of site, 8 new car parking spaces to existing car park to east of site and all associated site works.
Proposed 205sq.m of ancillary office & 242sq.m of ancillary staff facilities extension at the second floor level to the existing ancillary office located to the north-western elevations side of existing warehouse; Building elevations remain as existing due to second floor glazing being provided in previously granted planning permissions; Addition of 4 covered cycle parking to the existing covered cycle parking to facilitate the additional office / staff facilities area.
Alterations to an existing granted planning application, Reg. Ref. SD20A/0204, for a warehousing development consisting of provision of a new separate ancillary workshop building to the site's western corner measuring 278sq.m, overall height 9.7m; provision of new extended glazed entrance of ancillary office at ground floor (28sq.m, 5.9m high) to the front north-western elevation and new emergency exit route at first floor (43sq.m) exiting to side north-eastern elevation by new external stairs. Additional floor area provided 71sq.m; the alterations above result in total floor area increase by 349sq.m (from 2,222sq.m to 2,571sq.m); provision of 3 internally lit building mounted business logo signs, 12.25sq.m each (12.7m above ground level) to the front (north-western), side (north-eastern) and rear (south-eastern) elevations; provision of 3 10m high flagpoles to the north of the site, with a distance of approx. 31m from the warehouse and new extended office entrance; provision of 288sq.m solar panels to the roof of the warehouse; provision of a new recessed access/egress, rearrangement of truck wash area and refuel area and partial revision of the north-western site's boundary fence type C; elevation and site plan revisions associated with entrance porch, signage and fire exit stairs; and associated drainage adjustments due to the inclusion of the above alterations; all other details will remain as per the granted application Reg. Ref. SD20A/0204.
Relocation and resizing of previously granted ancillary workshop within the facility towards the south-east, now measuring 186sq.m overall height 7.2m (Previously granted at 300sq.m and 9.7m high); Relocation of pedestrian entrance gate by 9m on the northern site boundary due to design change to accommodate site levels and access gradients; Relocated HGV wash area adjacent to repositioned workshop building and associated drainage adjustments due to relocating the workshop and HGV wash bay; 1m high gabion retaining walls to the site's southern boundary (rear) to facilitate level differences between the subject site and the neighbouring site; Provision of an on-site Well Pumphouse (4.8sq.m and 2.7m high); Provision of associated above ground Water Tank (10m x 3m x 3m, 90m3); The overall site area remains as per the previous application at 0.98ha and there is no alteration to site landscaping.
Provision of a warehouse unit with ancillary office and staff facilities and associated development. The building will have a maximum height of 15.8m with a gross floor area of 2,222sq.m including a warehouse area (1,530sq.m), staff facilities (302sq.m) and ancillary office area (390sq.m) and will also include the provision of 1 new vehicular access/egress point along the north-west boundary of the subject site onto Clonlara Road; pedestrian access; 22 ancillary car parking spaces; bicycle parking; HGV marshalling yard with 2 loading bays; level access goods doors; dock levellers; access gate; signage; hard and soft landscaping; lighting; boundary treatments and associated site development works above and below ground.
Extend office use into warehouse area at ground and first floor to provide for office at first floor and canteen and toilets at ground floor.
Provision of a roof dormer to the rear of aspect of the roof.
Two storey 44sq.m extension to the rear accommodating a ground floor kitchen extension and new first floor bedroom with roof to be pitched; wall and roof finishes to match existing dwelling.
Extension to the side at first floor level only comprising a staircase from the rear first floor bedroom to attic level; the enclosure to the stairs to be 1m wide external with off-white T&G effect cedral cladding finish.
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone Limited
Roof dormer to the rear aspect of the roof and retention of the 'Velux' rooflight to the front aspect of the roof.
Retention Permission for timber cabin used as art studio with sessional art classes to rear of existing house
Demolition of existing single storey dwelling and the construction of 274 units on a 4.62 ha (net) site (density 60 units per hectare). It will comprise of 51 houses, 38 duplex units and 185 apartments. The height of the proposed scheme will range from two storey houses and three storey duplexes to 5 storey and part 8 storey apartment blocks. The proposed residential mix will comprise of: 17 2-bed houses, 27 3-bed houses and 7 4-bed houses, 2 1-bed duplex, 17 2-bed duplex and 19 3-bed duplex units, 62 1-bed apartments, 119 2-bed apartments and 4 3-bed apartments. A 4-classroom crèche of c. 276 sq.m and 2 substations are also included in the proposed development. 276 car parking spaces and 634 bicycle spaces are provided. A planted woodland berm will be developed along the northern boundary with the N7 to provide a sound barrier and amenity open space. There are a number of green spaces located in the centre of the site and on the south east and west of the site with natural play and SUDS elements as well as a large open communal space for the two apartment blocks to the south. Vehicle, pedestrian and cycle access to the site will be from the Mill Road. A new road will be constructed running east west at the southern boundary of the site. The residential element of the site will have two access points off the proposed new road. This new route will extend eastwards to provide cycling and pedestrian connections through neighbouring Citywest lands and to the Saggart LUAS light rail terminus. Secondary access is proposed at the north west of the site from an existing access road connecting to Mill Road. This access is designed as services and emergency only and will be controlled by collapsible bollards.
Detached two storey house with new vehicular entrance to side of 54 Fernwood Avenue as per previously granted application SD16A/155
Retention permission, of the dormer to the rear aspect of the roof, a velux rooflight to the front aspect of the roof, and planning permission for an extension to the front of the dwelling, comprising a porch, and a bay window, with standing seam zinc roof and wall finishes to match existing.
• Part change of use at ground floor level from office use to warehouse / logistics use (with a Gross Floor Area (GFA) of 944 sq.m) and light industry- manufacturing / food processing use (GFA of 1,860 sq.m), including ancillary staff welfare facilities, with the remainder of the existing floorspace (GFA of 712 sq.m) unchanged from the existing office use; • Proposed extension to the rear / south elevation of the existing building (with a GFA of 861 sq.m), comprising one level with a height of 7.47m, to provide an additional ancillary store to the proposed light industry- manufacturing / food processing use; • Proposed two storey extension (GFA of 13 sq.m) to the north elevation to provide an additional lift shaft and proposed extensions to the northern and west elevations to provide additional lobby / entrance areas (12 sq.m); • Provision of additional floorspace at first floor level (within the existing building envelope) to provide an additional 1,040 sq.m (GFA) of office floor space, ancillary staff welfare facilities, ancillary innovation and testing rooms, storage and plant rooms, and an additional 163 sq.m (GFA) of a mezzanine storage area; • Associated internal reconfigurations and installation of new internal partition walls, and associated alterations to the elevations including materials and fenestration arrangement, additional loading bays and roller shutter doors; • Provision of associated signage including an internally illuminated sign adjacent to the security entrance gate, a directional sign, internally illuminated signage over the entrance doors to the unit and 2 no. signs over entrance canopies; • Reconfigured car parking to provide 72 no. car parking spaces (a reduction from 134), widening of the internal service road, provision of new pedestrian footpaths from the estate road, internal segregated pedestrian footpaths and crossing, and the provision of a security fence and gate; • The proposal includes dock leveller, landscaping, bicycle store, external store with WC/garden store/bin store, plant compound, PV panels to new rear extension roof and bicycle store roof, surface water drainage, including detention pond and swale, and all associated works. The proposed development results in an overall increase of 2,089 sq.m in the total GFA of the unit from 3,516 sq.m to 5,605 sq.m, comprising office, warehouse / logistics, light industry manufacturing / food processing uses, and ancillary staff welfare facilities, innovation and testing rooms, storage and plant rooms.
The erection of an underground clean water harvesting tank under existing agricultural shed constructed under Pl. Ref. No. SD24A0033.
Roof dormer to the rear of aspect of the roof and the retention of the widened vehicular access.
Land recontouring/infilling works on C. 38,000sq.m of a folio size of C.5.3HA (allowing buffers); the volume of material to be placed on the site C.91,000m3 with an average fill level of C.3.5m above existing.
Erection of a slatted livestock shed which will include slatted tanks, a creep area for calves and walkway, centre feed passage, manure pit, concrete yards and ancillary works.
The provision of an amended junction and new link road from the existing Clonlara Road to the currently undeveloped lands with Enterprise and Employment zoning objective South of the Camac River and Nort of the N7 National Route. Interim measures are included within the application to block access to the new road until such time as the undeveloped lands are developed. All associated landscaping, infrastructure and site development works to facilitate the development.
Retention for 3 no. roof lights (2 facing east a 1 facing south). A detached garden room of 16sq.m floor area. Permission for a rear, ground floor extension of 22sq.m floor area with a stove flue. A gable window facing south at attic level.
Single storey extension to the front of the existing two storey terraced dwelling with a tiled roof and external finishes to match existing; internal alterations and associated site works.
The Construction of 2 no. 6.50m wide X 3.0m high digital advertising panels (arranged in a V plan 6.50 meters from ground to top of structure) with a 250mm frame all around each
Construct agricultural shed incorporating loose and storage areas; wall manure area; hardcore area and access roadway; upgrading existing entrance and all associated site works.
Two storey childcare facility of circa 459sq.m on a site measuring circa 0.136 hectares forming part of the existing Elder Heath residential estate; access to the proposed development will be via Elder Heath Walk & Elder Heath Crescent previously granted permission under Reg. Ref. SD12A/0168 (as extended under Reg. Ref. SD12A/0168/EP); car parking, landscaping and all associated site development works; the proposed development will have the effect of modifying part of a previously permitted development granted under Reg. Ref. SD12A/0168 as extended under Reg. Ref. SD12A/0168/EP.
Permission sought for the construction of a 2-story, 3-Bedroom detached house with new vehicular access/egress to Alderwood Avenue to the side of existing dwelling
Retention of non-habitable attic with dormer to rear and widened vehicle access to front.
Permission for change of use and subdivision of existing flower shop to coffee shop/barber shop and associated site works.
Double height single storey extension for use as a reception area, waiting area and ancillary storage space; external modifications to the existing building facade including upgrading the existing facade finishes, inclusion of new glazed sections and upgrading of existing external windows and door; internal modification to the existing building layout; external landscaping including upgrading of the pedestrian walkway from the existing car parking area; all other associated ancillary site works.
Retention of widening of vehicular entrance in front boundary wall. Permission for dishing of kerb.
Construction of single storey extension to the side and rear of existing dwelling comprising of bedroom c/w en-suite, open plan kitchen, dining, living space and utility room. Internal modifications and all associated site works.
Porch to front.
Two storey extension to side; single storey extension to rear and porch to front.
Construction of a finished goods warehouse (including freezer room) at the south side of the existing Blenders manufacturing facility. The proposed extension will have a gross floor area of 3,900 sq.m and a maximum height of 20.5m. Also, ancillary works including: PV panels to new proposed warehouse roofs, 3 no. additional loading dock levellers, Relocation of existing carparking (no change in numbers) including provision of 4 no. EV charging spaces and 2 no. accessible parking spaces, 35 no. cycle parking spaces., New HGV staging area to accommodate 4 trucks., Construction of new sprinkler tank (10m high) and pump room (3m high) to the south west of the site along with retaining wall., Provision of internal connections to the main Blenders building., Fire escape door to western elevation of main Blenders building. All associated site works including landscaping, drainage infrastructure and a new path to east of site.
Blenders intend to apply for Retention Permission and Permission for development on lands at Blenders, Whitestown, Tallaght, Dublin 24, D24 VY75. The development for which retention permission is sought consists of minor works arising from deviations to the permitted finished goods warehouse associated with SD23A/0277 as follows: 1.Single storey office, staircase and utility rooms (1 no. panel room and 1 no. fire hose reel pump room) to the north-west of the finished goods warehouse with roof plant over. 2. Standalone bicycle shed to the north east corner of the site. 3. Widening of the internal road in the southwest corner of the site to accommodate additional HGV staging spaces. 4. Relocation of pedestrian walkway to the front of car parking spaces to the north-west of the site. 5. Associated lighting, landscaping, retaining gabion wall and drainage arrangements. Planning permission is sought for: • alterations to the existing entrance to the south of the site in order to prevent HGVs striking the ground surface on entry/exit along with replacement gates and fencing. •new landscaping (including additional planting) •omission of permitted sprinkler tank and meter room from that permitted under SD23A/0277 All associated site works.
The Development will consist of the installation of 1,611 msq solar photovoltaic Panels to various rooftops of the existing building at Blenders, Whitestown Road, Tallaght, Dublin 24, D24VY75
1) REMOVAL OF EXISTING TEMPORARY STRUCTURE (LOG CABIN) AND 2) CONSTRUCTION OF A NEW DETACHED DWELLING TO THE REAR OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS.
One & a half storey side extension, raised boundary wall and all associated site works
Single storey stand-alone home office and games room (floor area 37.2sq.m) located to the rear of the overall property.