For and existing development. The development consists of an existing 25 metre high telecommunications support structure (total height including antennas 26.4 metres) carrying telecommunications equipment, together with existing equipment container and associated equipment within a fenced compound as previously granted under local authority reference 13/30. The development will continue to form part of Meteor Mobile Communications Ltd. existing and future telecommunications and broadband networkDecision record indexed
For development. The development will consist of the installation of 5250 Solar PV panels over the roof of existing industrial buildings and all associated site works and servicesDecision record indexed
For Extensions constructed to existing dwelling, storage shed and for additional vehicular entrance along with associated site development worksDecision record indexed
Alterations to window configuration, demolition and reconstruction of new entrance porch, installation of 21.6m2 of photovoltaic solar panels, reconfiguration of chimneys, extension to domestic garage and construction of new car port, new covered link to garage, internal alterations to existing dwelling, together with all associated site worksDecision record indexed
For a laydown area for equipment and break bulk materials. The works will include earthworks, drainage, concrete paving, retaining walls and landscaping works. A Natura Impact Statement will accompany this applicationDecision record indexed
For the construction of a bulk store and associated site works. The store will be used to store port related products such as break bulk, bulk and unitised loadsDecision record indexed
For (1) (a) Permission for the proposed erection of a Fertiliser Storage unit together with all associated site works, landscaping and ancillary services on site including (b) the removal of the existing septic tank on site, and the proposed installation of a new treatment system on site to cater for foul water from site (c) the removal of the existing attenuation tank on site and the proposed installation of a new attenuation tank on site together with installation of a Bypass Separator with Flume monitoring equipment on the discharge from the surface water drainage on site, and for (2) Permission for Retention of a water storage tank for fire fighting purposes, pump house, storage shed and external storage area for sawdust. An Appropriate Assessment Screening Report forms part of the Planning ApplicationDecision record indexed
For a 7 year planning permission for a bulk store and associated site works. The store will be used to store port related products such as break bulk, bulk and unitised loadsDecision record indexed