For development. The development will consist of (a) The proposed extension to an existing waste metal processing and storage facility to provide additional storage for processed waste metal materials and shredded rubber tyres, (b) a new weighbridge and weighbridge office, (c) a new storage shed for the storage of precious metals, (d) the change of use and refurbishment of existing manufacturing sheds to a vehicle repair shed, a depollution shed and additional storage shed for the storage of processed waste metal, (e) the installation of stormwater attenuation tanks, (f) the extension and reconfiguration of an existing access road, (g) the erection of a 1.8m high concrete wall to the north east/south east boundaries, (h) the erection of gates to the site access road to the south west, (i) the erection of a flood gate to the top of the exisiting slip way and all associated site development works. The planning application will be accompanied by an EIAR screening and Natura Impact Statement.Grounds not yet categorised
For proposed erection of alterations and extensions to existing convenience store/petrol forecourt (minor alterations to planning permission previously granted under Planning Register Number 21/610 consisting of (a) additional ground floor area (b) proposed new first floor extension (c) change of site boundary (d) together with all associated & auxiliary accommodation and site works)Decision record indexed
For the proposed erection of alterations and extensions to an existing convenience store and petrol forecourt consisting of (a) extension to the rear of existing building (b) connection to the proposed greenway (c) outdoor seated area together with associated and auxillary site worksDecision record indexed
For (A) the proposed Change of use of part of the existing site from truck parking (which was granted permission under Planning reg no 94311) to form a Cold Storage Depot, Hard Standing and yard area together with all associated site works and ancillary services, (B) the proposed installlation of a ESB Substation with Switch Room on site, (C) the propsed demolition of an existing building on site and (D) the proposed relocation of the existing Truck Wash Bay area on siteDecision record indexed