To RETAIN the construction of lean- to extension to side of garage & extension to rear of garage to include roof area, boiler house, balcony and retention permission for alteration of position of treatment plant and percolation from that approved under P03-1728, including ancillary site works.
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For the development which will consist of a new guest carpark including petrol interceptor, surface water attenuation tank, connection to existing surface water drainage system, carpark lighting and ancillary site works (The development is proposed within the curtilage of a protected structure Dromoland Castle, Dromoland)
For development at Dromoland Castle and Estate, Dromoland, Newmarket-on-Fergus, Co. Clare (Dromoland Castle is a Protected Structure: RPS No. 278). The development consists of:- The demolition of existing golf maintenance shed and the renovation and conversion of the existing stables building from golf storage/maintenance to visitor accommodation to provide 13 no. rooms/ suites, including an integrated bat loft, removal of solar panels, alterations to roof and openings, including installation of new and replacement doors, windows, gates, rooflights, infill wall sections, internal alterations and associated landscape works. - The renovation and conversion of the existing ‘Gardener’s Cottage’ from staff accommodation to visitor accommodation, including removal of existing storage shed, removal of existing rear lean to extension and replacement with two storey extension, new storage shed, internal alterations to provide a 4 no. bedroom guest house, 1 no. car parking space and associated landscape works. - Alteration and extension of existing clubhouse building to provide an enhanced wellness area and associated facilities, including replacement and extension of external deck to rear (south) with single storey timber spa structure, single storey extension to front (north) elevation, together internal alterations. - Installation of 3 no. sauna huts on lake island accessed via existing bridge, including raised timber walkways and floating timber jetties with plunge pools; - The provision of a new formal staff car park to the south of the stables building to provide 61 no. spaces, including accessible and EV charging spaces; - The provision of new/formalised car park to serve Brian Boru Hall (event facilities) to provide 21 no. spaces, including accessible spaces; and - Alterations to the existing stables car park resulting in a reduction of 4 no. spaces (36 no. spaces remaining), including accessible spaces; and - The provision of new/ formalised car park to serve the club house/ wellness centre to provide 10 no. spaces, including an accessible space. The proposed development will also comprise all ancillary landscaping and boundary treatment works, bicycle parking, biodiversity enhancement measures, wayfinding/ signage, site services, site lighting, construction compound, and all other associated site excavation, infrastructural and site development works. The planning application includes a Natura Impact Statement
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwellinghouse, garage, entrance, wastewater treatment system and polishing filter, and ancillary site works
To RETAIN a dwelling, garage and wastewater treatment system
To renovate and extend existing private dwelling house, construct detached garage and all associated site works
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
Which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development, the development will consist of a part material change of use from a farm store, currently used as a farm store to a light engineering workshop and associated site works
The construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To develop a motorway service area and rest area adjacent to Junction 12 of the M18 motorway, which will include service station building with convenience shop, food court, staff facilities, canopy, fuel facilities, parking and circulation space, children's play area, picnic area and access provision. The development also includes infrastructural works public lighting, signage, landscaping, internal fencing, electrical substation, sixteen electric car charging points, roof mounted solar panels, storm water runoff, petrol interceptors and attenuation system, on-site wastewater treatment plant including access road, pumping station and connection to public foul sewer, drainage improvement works, underground fuel storage tanks, rain water harvesting system, connection to public water supply, underground storage tanks for fire-fighting purposes, underground rain water harvesting tanks, works to improve visibility at access point, upgrade to adjacent roundabout and ancillary works. The connection to the public sewerage system will be by means of a rising main to an existing public sewer. The rising main sewer will cross under the M18 motorway by directional drilling and thereafter underground via existing road margins/public road and under River Fergus and railway line through the townlands of Kilbreckan, Killow, Skehanagh, Clareabbey and Ballybeg. The inert soil from the directional drilling will be used in landscaping works on the site of the service station building. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
For development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To replace the permission granted under reference P19/978 with a new application to build new dressing rooms, with a first floor observation/commentary area, meeting room and storage areas, install a wastewater treatment system & all other associated site and ancillary works
To build a new spectator stand with dressing rooms and storage areas underneath, upgrade the existing waste water treatment system and all associated site and ancillary works
To install a 27m multi-user lattice type telecommunications support structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fenced compound together with associated ground equipment cabinets and associated site works
For development which will consist of (1) The demolition of an existing derelict dwelling house (2) The construction of a new dwelling house and garage with a proprietary wastewater treatment system and ancillary site works
Of a) storage of construction material on lands previously used for extraction of quarry stone and b) RETENTION of commercial gate which replaced agricultural gates on lands
For development, the development will consist of a new dwelling house, new garage, new site entrance and wastewater site works and below ground
For development which will consist of; A new dwelling house, new garage, new site entrance and wastewater treatment system, including all ancillary site works above and below ground.
To (a)construct an extension to the existing dwelling to comprise of kitchen/dining/livingroom and playroom (b)To Refurbish existing dwelling to provide utility, pantry, bathroom and bedroom(c) To convert existing outbuildings to provide 3 No. bedrooms, en-suite, walk-in-wardrobe & bathroom. (d) to demolish existing extension to the rear of the dwelling (e) to install new wastewater treatment system including all associated site development works
To construct a new agricultural entrance onto the public road including site works
To demolish existing outhouse, construct an extension to both sides of existing dwelling house to include associated renovation works and site works
- a permission of 10 years in duration is sought. The application site has a total of c. 60 hectares with a nett area for development of c. 45 hectares, and is bound to the south by R352 (Tulla Road), to the east and the north by agriculture land, to the west by the M18. The development will consist of: the demolition of an existing single storey with pitched roof farm dwelling house together with 8 No. farm outbuildings on the overall site. The construction of 6 No. two storey data centre buildings with three storey plant/office levels and associated ancillary development that will have a combined gross floor area of 118,740 sqm. These data halls are maximum 19m high and will consist of the data halls and air handling units and offices and ancillary plant and support. Each of the six data centre buildings will include data halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, pump rooms, water storage tanks, and plant, as well as backup (standby) generators (11 No. per building) for emergency use only situated along one elevation of each building. The standby diesel generators will have associated 8 m high flues. Each generator will also include local diesel storage tanks with a single refuelling area to serve the proposed emergency generators. A gas powered energy centre and Above Ground Installation (AGI)4,674 sqm in size. The energy centre will primarily comprise 18 no. lean-burn natural gas engines, 2 No. pump rooms, and fuel storage compound. Each generator will have its own flue of 25m height. The energy centre and buildings within the compound will be 12 m high, single storey with mezzanine level. The buildings will house ancillary office, welfare facilities and associated parking. A two storey Vertical Farm Building. The vertical farm will be c. 2,430 sqm and 12m high. It will comprise c. service area of 1,444 sqm, handling area of 844 sqm and ancillary areas. Please see newspaper notice for full development description
To construct private dwelling house, detached garage, new site entrance, new on-site wastewater treatment system, connect to existing infrastructure services and all associated site works
For development, the development consists of the construction of an extension to existing slatted unit, new straw/machinery store unit and associated site works
For the following: (a) RETENTION of (1) The 'as constructed' relocation of the previously approved (Reg.ref. 17/257 & 18/167) detached bungalow within the original site together with (2) The 'as constructed' rear ground floor extension and (3) The conversion of the original integrated garage to habitable accommodation and (b) Approval for the replacement on site of the existing septic tank with an EPA 2009 compliant comprehensive wastewater treatment system
Of upper floor garage
To construct a 30m high, free standing lattice type communications structure to accommodate antennae and communication dishes to be shared with third part operators ESB's Ennis 110kV substation
To construct a new dwelling house, entrance, private garage, wastewater treatment system and all associated site works
For (a) to refurbish and reroof and for a change of use of an existing outbuilding from storage use to accommodation use ancillary to the existing house, and to construct a new extension and (b) To refurbish and reroof an existing barn to include a roof mounted PV solar array, and to construct a new glass house and ESB switch room/ services building, all located close to a protected structure ref RPS no. 640.
To repair and reroof an existing outbuilding located close to protected structure (ref RPS no. 640)
To remove an existing greenhouse superstructure and to construct a new greenhouse, restore and rebuild an existing outbuilding structure and to reroof in part, all located close to protected structure ref RPS no. 640.
The development will consist of construction of a new dwelling house, modifications to existing cottage to provide ancillary accommodation with a new shared wastewater treatment plant, with all associated works and connections to services
To retain private garage and store building on southern side of dwelling house along with all associated site works
To construct a dwelling house and private garage. The development will include connection to the public sewer and water services, utilisation of existing entrance on to the Knockaneen Road and all ancillary site works
The development will consist of the construction of 13 no detached dwelling houses including for all site development works, site landscaping and public service connections, some of which have been substantially completed under previous permissions granted on this site under Planning Ref P06-21019 and extended under Planning ref P11-21073. The development includes for the provision of a pedestrian access (including footbridge) from the application site to the existing Gort Leamhan residential development. the proposed development also includes the completion of provision of on-street public lighting on the public road at this location. The Planning application is accompanied by a Natura Impact Statement
To make elevational changes to the existing dwelling house, to include changing the roof profile on the rear section of the house from a flat roof to pitched roof, along with all associated site works
To decommission the existing septic tank and install a new wastewater treatment system and percolation area along with ancillary site works
To construct a new dwellling house, garage and waste water treatment system
To construct a dwelling house, garage and waste water treatment system
To construct an entrance, dwelling house and wastewater treatment system with soil polishing filter together with all associated site development works and services.
The development will consist of planning PERMISSION for a period of five years to construct and complete a Solar PV Energy development with a total site area of 16.08 hectares, to include inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, watercourse crossing, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
To replace existing sub-standard dwelling with a new dwelling house and proprietary treatment system along with associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To construct extensions to side and rear of existing dwelling house, to use part of the dwelling as a granny flat, and to install new effluent treatment system all with associated site works
To change design of proposed renovation and extension of existing private dwelling house previously granted under Planning Register Reference P16-317 to include (a) demolition of existing side, front and rear extensions, (b) construct new single storey and storey-and-a half side extension and all associated site works