Build a 2-bed single storey dwelling and all associated works to the rear of Oonagh, Seaview Avenue, Arklow, Co. Wicklow; works include alterations to existing side access route and widening of the existing front pedestrian entrance gate to enable off-street parking
Subdivision of existing site, erection of a new fully serviced two-storey dwelling house having a ridge height of 9.1 meters, new connection to public mains sewer, and all associated site works
The proposed development will consist of: I.Installation of new 1,350lt Aboveground Self Bunded AdBlue Tank with Integrated Dispenser, II.All associated site development works
Replacement (and repositioning) of 1 No. 6.4m x 3.35m advertising display with 1 No. digital 6.28m x 3.4m advertising display adjacent to the Dublin Road, Arklow (West side of R772 road adjacent to Circle K Service Station and opposite junction with Briggs Lane) and reposition display 3.9m towards the road with an increase in overall height from 4.9m to 5.8m, and all associated site works and services
(i) the demolition of existing buildings, roadside fuel forecourt and associated canopy. (ii) The construction of a new forecourt amenity building with net retail area (100sqm max), ancillary restaurant/café area with hot and cold meals and refreshments for sale for consumption on and off the premises, associated customer seating, ancillary off licence (7.8sqm), customer WCs and ancillary office, staff facilities, storage and plant areas. (iii) The construction of a new 2-island fuel forecourt, associated illuminated canopy and underground and over-ground fuel infrastructure. (iv) The construction of a car wash with associated underground water storage tanks, drainage and plant room. (v) Associated revisions to the site layout including revised entrance and exit arrangements, new footpath and boundary treatment to R772 Dublin Road, car and bicycle parking, site lighting and refuse compound and (vi) all associated signage and site development works
(i) demolition of existing roadside fuel forecourt and associated canopy (ii) demolition of southern part of existing premises, (iii) construction of a new 3 island fuel forecourt associated illuminated canopy, underground and overground fuel infrastructure, (iv) internal and external alterations and Change of Use of existing premises to provide a new forecourt amenity building with retail area (100 sq.m max), ancillary restaurant/café area with hot and cold meals and refreshments for sale for consumption on and off the premises, associated Customer seating, ancillary Off-Licence, Customer WCs, Back of House with ancillary office, staff welfare facilities, storage and plant areas, (v) Operator Signage, (vi) associated revisions to site layout including revised entrance and exit arrangements, new footpath and boundary treatment to R772 Dublin Road, car and bicycle parking, site lighting and refuse compound, and (vii) all associated site and development works
Modifications to the permission granted under application register reference 21/1193, which approved the redevelopment of the service station. The modifications proposed to the approved scheme comprise: 1. The inclusion of solar PV panels and associated fixtures and fittings on the roof of permitted station building. 2. An extension of 8.44m to the width of the permitted forecourt canopy. 3. The inclusion of an additional fuel dispenser island, to bring the total number to three 4. associated revisions to the permitted site layout, including the removal of 4 no. previously permitted car parking spaces and relocation of air and water services 5. All associated site development works
Prefabricated structure, 31.2sqm in area and comprising a service station shop and office, for a temporary period of 3 years
New single-storey bathroom extension to the side (south west) elevation of the existing two-storey semi-detached dwelling all connecting into existing services and including all associated site works.
Demolition of 3 no. structures on site including a 2-storey habitable house (total GFA 207 sq.m) and 2 no. sheds/outbuildings (c.580 sq.m). Closures of 2 no. existing entrances onto the Kilbride Road (L-6179). Construction of a new residential development and local centre comprising: 666 no. units (578 no. semi-detached and terraced housing (100 no. 2 beds, 317 no. 3 beds, 161 no. 4 beds) and 88 no. apartments and duplex apartments (24 no. 1 beds, 51 no. 2 beds and 13 no. 3 beds)). All residential units will have associated private open space facing north/ south/ east/ west. The proposal will also include a local centre (c. 2335 sq.m) comprising a creche (c.1,095sqm) with outdoor play area, 3 no. community/medical units (c.450 sq.m), and 3 no. retail units (c.790sq.m). Building heights within the development will range from one to five storeys. The development will include streets, pedestrian/cycle links, open spaces/parks (with play areas) and will include amendments to the permitted open spaces and access road granted as part of the Phase 1/Character Area 1a development (WCC Reg. Ref.: 23/756 on the subject lands. The development will also include a public boardwalk/bridge for pedestrians and cyclists from the development across Arklow Town Marsh and the Avoca River to the Arklow Riverwalk north of Arklow Town Car Park and the Town Centre, with the bridge element (and associated works) across the Avoca River constructed atop the concrete columns (debris traps) permitted as part of the Arklow Flood Relief Scheme (Planning Ref. ABP-310368-21). All associated site development works, site reprofiling, infrastructural and drainage works, surface water attenuation and natural attenuation areas, connection to public services and utilities (including undergrounding of ESB lines), provision of substations, bin stores, bicycle stores, car and cycle parking at surface and undercroft levels, public lighting, landscaping and planting, public/communal/private open spaces and boundary treatment works. This development will form part of the designated Kilbride Action Area Plan AAP3
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
Renovate home including removal of existing garage and construction of a two storey extension to south elevation, construction of single storey extension to the rear and north elevation and connect to existing services and all associated site works
The construction of a bungalow, a new entrance off existing driveway and connecting to mains services and all ancillary site works
(1) Retention permission for increased wall height to front and side boundary walls and (2) permission to erect a first floor extension over the single storey section to the front and side of the existing dwelling with minor alterations and revisions to the elevations and internal layout along with all associated site development works
Erection of new over ground fibre optic cables on existing timber poles, the erection of new poles and associated fibre optic cables
Extend opening hours of existing café/restaurant granted under Pl Reg No 07/610116 from 6.00pm to 10.00pm Monday to Monday
Proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Modifications to the development permitted under P.R.R.: 24/8 to include (1) increase the lower ground floor extension footprint from 28m2 to 35m2 and erect a 28m2 first floor extension over, all to the side of the existing 120m2 dwelling with minor alterations and revisions to the existing and approved elevations and internal layout and (2) erect a 11m2 carport to the side of the approved 43m2 detached single storey gym/games room/store to the garden along with all associated site development works
(1) erect a 28m² single storey extension to the side with minor alterations and revisions to the elevations and internal layout of the existing dwelling and (2) erect a 43m² detached single storey gym/games room/store to the garden along with all associated site development works
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
Of alterations to my dwelling as a change to that permitted under planning Ref. 04/610093 and all associated site and ancillary works
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables
Construction of two no. semi-detached houses with new vehicular entrances onto Templerainey Park and connecting to mains services and all ancillary site works
100m2 garage/storage shed to the rear of the existing dwelling along with all associated site development works
The addition of new windows to side elevation, addition of new main entrance porch & alterations to existing fenestration to back & sides of their existing dwelling
Erect an 80m2 garage/storage shed to the rear of the existing dwelling along with all associated site development works
Alterations and revisions to the elevations and internal layout of the as-built dwelling along with the domestic storage garage and all associated site development works as opposed to that granted under P.R.R 01/610058
(1) Demolition of existing garage to side of dwelling, (2) Construction of a new single storey extension to side of dwelling, (3) All above with associated siteworks
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Proposed single storey extension to side of existing dwelling and associated works
Construction of a new educational campus and a new link road that will servce the school campus which will include the provision of two school buildings. Gaelscoil an Imbhir Mhóir a two-storey, 16 classrooms primary school with two special needs rooms and ancillary spaces with total floor of circa 3093sqm serving 480 pupils. Gaelshólaiste na Mara a three-storey, post primary school with two special needs rooms, PE hall and ancillary spaces with a total floor area of circa 6585sqm serving 400 pupils. Proposed site works to include the construction of all new hard play areas, six play-courts, grass pitch, 182 no. car-parking spaces together with boundary treatment, 79 bicycle stands, ancillary infrastructure works, pedestrian links and landscaping.
Alterations and additions to an existing single-storey detached dwelling comprising the conversion of the existing attached garage into a new living room with a new raised flat roof together with the construction of a new single-storey extension consisting of a new master bedroom with walk-in wardrobe & en-suite facility to the rear (north) elevation and including the provision of 5 no. new velux rooflights to the existing west side facing roof, a new corner window to the existing front (south) elevation together with new patio doors to (east) side elevation of the existing dwelling. Further alterations to include partial reinstatement of the existing front boundary wall together with new entrance piers & driveway all connecting into exiting services and including all associated site works
(1) Retention permission for the as built domestic garage and (2) Permission to erect a single storey dwelling and connect to existing services along with new site boundaries and all associated site development works
Amendments to previously approved planning permission Reg Ref:21/713. The amendments comprise the following; (i) change of roof type from flat-roof to low-pitch pitched roof, with rooflights, to the approved detached single-storey dwelling; (ii) alterations to the fenestration treatment to all elevations; (iii) alterations to as granted covered terraces; (iv) addition of a new single-storey detached shed with pitched roof; (v) minor internal layout alterations; (vi) all ancillary works necessary to facilitate the development
Demolition of existing single storey commercial building which comprises of the former 12 no bedroom, Clogga Bay hotel, demolition of existing 3 no bedroom dwelling adjoining the hotel, removal and backfill of the existing swimming pool, construction of 1 no single storey, detached replacement dwelling comprising 6 no bedrooms. The proposed dwelling will also include a revised vehicular driveway with car parking area accessed via existing vehicular entrance off Clogga Cove, private amenity space including soft landscaping and boundary treatments, provision of a new wastewater treatment system, suDS, and well and all ancillary works necessary to facilitate the development
Proposed coastal defence works comprising of rock revetement works and all associated site works
Change of use from residential to short-term letting use along with all associated site development works
A dwelling, garage, bored well, wastewater treatment system to current EPA standards and all associated ancillary site works and services
Erect a 50m2 single storey extension to the rear of the existing dwelling along with all associated site development works
Residential development is proposed comprising 98 residential units on this site of 5.14 hectares. The residential mix will be detached, semidetached and terraced houses including 9 no. 2 bed houses; 71 no. 3 bed houses; and 18 no. 4 bed houses. All of the residential units will have associated private open space with gardens facing north/south/east/west. Alterations to Kilbride Road L6179 to provide a section of the regional road and upgrades to provide pedestrian facilities. Access to the site will be from the new proposed regional road. The development will also provide for landscaping, public open spaces and all associated site development works to enable the development including boundary treatments, temporary wastewater treatment plant, pumping station, percolation area, attenuation storage area and other service provision including ESB substation.
A proposed new 39.37 sq.m single storey flat roof extension to the rear and side of the existing Coastguard station. The works also include for the reconstruction of the failing existing stone boundary wall to the left hand side of the station to include a new pedestrian access from the front of the station via a new entrance gate. The extension allows for an Ambulant Disabled WC and shower, a changing room, additional storage and canteen facilities that can double as a meeting room. The proposal includes for the repair and maintenance works to the existing station including repair and repointing of brickwork, the removal of a concrete drip edge detail above the doorway, moving the existing antenna to the rear of the building and all associated site works and ancillaries
Retention planning permission for 4 no. roof lights to east elevation along with 1 no. roof light to west elevation and all associated works
Pedestrian access gateway to the side boundary wall of our property onto the Pines Estate public road
Dwelling with services and domestic garage and all associated site and ancillary works
(1) retention permission for a pedestrian access gateway to the side boundary wall of our property onto the Pines Estate public road and (2) permission for the creation of a new vehicular entrance onto the Pines Estate public road along with all associated site development works
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Existing commercial parking depot & permission to extend the existing commercial storage facility along with all associated site development works
Alterations and additions to an existing single-storey detached dwelling comprising the construction of a new single-storey dining & family room extension to the front (south east) and side (north east) elevation including modifications to an existing window ope to the front (south east) elevation together with the construction of new replacement splayed site entrance comprising new piers and wall with gates in lieu of the existing site entrance all connecting into existing services and including all associated site works