For the following, 1. Elevation changes which are at variance with that granted under Condition 3 of Planning Permission P06-2780 2. The installation of 3 no roof windows on the north east elevation 3. Minor changes to internal layout 4. Minor change to on site dwelling and garage position
Of the garage attached to the dwelling, the storage sheds & all other site and ancillary works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road and all associated site works
For development which will consist of alterations, rear extension and change of use of existing domestic garage to a granny flat accommodation, along with ancillary works
To build an extension to the rear of the existing dwelling house and all associated site and ancillary works
For the construction of a domestic garage to the rear of the existing dwelling including ancillary site works
For development, the development consists of the construction of a slatted unit and associated site works
To construct a single dwelling house, garage, advanced wastewater treatment system and ancillary site works
For a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
For the construction of a single storey side extension to the existing dwelling house, including all associated site works
To construct a dwelling house, entrance, domestic garage, wastewater treatment system and soil polishing filter together with all associated site development works and services
To construct an extension incorporating existing garage space into extended ground floor by means of a new extension
To construct a 30 metre multi-user lattice tower telecommunications structure carrying antenna an dishes enclosed within a 2.4 metre high palisade fence compound with associated ground equipment and associated site works including new access track
For the Installation of a Modular Home to be used as Ancillary Living Accommodation with connection to existing wastewater treatment system including ancillary site works
To make the following changes to the existing dwelling house a) demolish existing rear extension; b) construct new rear extension; c) elevational changes; d) all associated site works
For the construction of a dwelling house, wastewater treatment system and new entrance including ancillary site works
To construct a dwelling house and garage, with wastewater treatment system of mechanical aeration system and polishing filter, and associated ancillary site works
Of a portal frame type shed and all associated development works
For the change of house design to that granted under planning reference number P21/1150 including ancillary site works
For the construction of a dwelling house, garage, wastewater treatment system and new entrance including ancillary site works
To construct 2 no. detached dwelling houses complete with detached domestic garages, effluent treatment systems, vehicular entrances, including all associated site works and services at Deerpark / Corlack Cluster, Sixmilebridge (as defined in the Clare County Development Plan 2017-2023)
To upgrade existing sewage treatment system and associated site works and relocate the system inside existing site boundary
For a 1.2mW PV solar farm development. The proposed works will consist of a 1.2mW PV solar farm located within the airfield, with an area of approximately 2.25 hectares, comprising of linear arrays of solar photovoltaic panels on ground mounted frames (with associated cabling and ducting), a modular substation, inverters, new internal site access road and all associated ancillary development works
For development - the development consists of the construction of a calving unit, extension to existing silage slab with new silage wall and associated site works
Is sought to construct a detached dwelling house, domestic garage, effluent treatment system, vehicular access including all associated site works & services
Of the following: 1 modifications to existing house. 2. construction of external shed to rear of property. 3. position of site entrance and associated works
To construct an extension to rear and side of existing cottage and associated works to include renovation of cottage, installation of a wastewater treatment system and site works
For the Construction of a Dwelling House, Garage, wastewater treatment system and new entrance including ancillary site works
To A) RETAIN modifications to dwelling house, B) RETAIN site boundaries/site layout as constructed along with all associated site works and services. Original Planning Ref No. P90/309
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
To construct a dwelling house, garage, entrance, wastewater treatment system and associated site works
To make alterations to the existing dwelling house to include the following; a) construction of front porch and covered canopy area, b) elevational alterations, c) construction of standalone private garage and d) associated site works
To construct a new dwelling house to include a waste water treatment system, new entrance to dwelling site to include reconfiguration of the existing site entrance, driveway and associated site works
For the construction of a single storey extension to dwelling consisting of a family independent living unit, connection to existing waste water treatment system and all ancillary site works
For the construction of an Advanced Aerial Mobility Research Lab with a new hard surfaced hangar apron and taxiway to existing taxiway. The works include connection to N19 for site access via currently approved Planning ref 23-96, the provision of 48No. carparking spaces which include accessible spaces, EV charging areas, set-down area, secure bicycle parking spaces, louvred plant/refuse store, photovoltaic array, reconfiguration of airside/landside boundaries, building signage and a single storey substation/switchroom with all ancillary landscaping and associated site works & services including rising main with installation of a new pumping station to facilitate connection to existing airport infrastructure. The planning application is accompanied by a Natura Impact Statement
For development at Rineanna South, Shannon Airport, Co Clare. The development consists of the construction of a single storey high-bay Air Cargo Hub and logistics/distribution facility (2705m2) with ancillary single storey office area (335 m2). The works include a new site access and the provision of 42 no carparking spaces which include accessible spaces, secure bicycle parking spaces, louvred plant/refuse store, photovoltaic array, building signage and a single storey substation. The construction of new hard surfaced ancillary delivery/service yard with vehicular and HGV parking all ancillary landscaping and associated site works and services including the decommission of adjacent septic tank and installation of a new pumping station to facilitate connection to existing airport infrastructure. The planning Application is accompanied by a Natura Impact Statement
To RETAIN the following: (a) to RETAIN separate Garage to rear of Dwelling House; (b) to RETAIN Sunroom to rear of Dwelling Housed) (c) to RETAIN Link between main House and converted Garage; (d) to RETAIN window which has replaced garage door to front
For development which will consist of the construction of a slatted cubicle unit, silage slab and associated site works
To construct a new dwelling house and private garage, new entrance and install a new wastewater treatment system along with all associated site works
To construct a steel shed and all associated site works
For demolition of existing dwelling house, construction of a new dwelling house and garage along with all associated works
To construct a dwelling house, garage, entrance, installation of a wastewater treatment system and associated site works
To construct a dwelling house, garage, entrance, wastewater treatment system, and associated site works
For the demolition of existing Hay store and construct replacement Hay store and calf rearing shed. We also intend to apply for permission for the construction of Sand Arena and Stables with associated Tack room, Haylage store and Dungstead including ancillary site works
Of the construction of a two storey extension to rear of existing dwelling to comprise of kitchen/dining/livingroom, playroom, utility, master bedroom with ensuite and walk-in-wardrobe and bathroom including the refurbishment of the existing dwelling and PERMISSION to construct new entrance including ancillary site works
Of garage as constructed and conversion of same to independent living unit to comprise of kitchen/dining/ living, bathroom and 1 bedroom, utility and storage room with connection to existing wastewater treatment system including ancillary site works
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services
For the change of house design to comprise of extension to rear to incorporate bathroom, ensuite and redesign of utility and also including minor front elevation changes from that granted under planning permission reference Number 18/374
For the construction and operation of a concrete batching plant which will produce up to 50,000 m3 of ready-mix concrete annually over an area of circa 1.6 hectares within the southern portion of Bunratty Quarry, in the townland of Bunratty West, Co. Clare. The proposed concrete batching plant will include concrete plant (x 1), 100 tonne storage silos (x 4), 50,000L water tank1 (x 1), 80 tonne storage bins (x10), control cabin, admixture building, conveyor system, washout lagoons, attenuation tank, an access ramp and associated drainage infrastructure including a settlement tank. The proposed development will involve the utilisation of both virgin aggregates and recycled aggregates. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works