Planning records
Showing 351-400 of 28,020 public recordsDemolition of existing single storey extensions to front & rear (60.15sq.m) & entire first floor (66.87sq.m). Construction of single storey pitched roof extension to front & flat roof extensions to rear & side (58.82sq.m), new first floor extension to include raising of perimeter walls by 1.45m, raising of ridge height to main roof to front by 0.515m to 7.375m above ground level, matching level of return roof to side, all to create new first floor area (181.46sq.m), complete with new former roof's and velux roof windows to front side & rear, selected stone cladding at ground level, together with internal alterations & renovations and all associated site works.
(i) construction of a detached, single-storey, split level, four-bedroom dwelling (261 sq.m), with on-curtilage car parking, private amenity space and associated wastewater treatment system, percolation area and surface water soakaway, (ii) 4.01m high, single storey stable structure (64 sq.m) with 4 no. stalls, (iii) Utilisation of the existing agricultural entrance to the south with alterations to increase visibility; and (iv) the development will also include all associated works including, landscaping, planting and boundary treatments, infrastructure, lighting, and all ancillary site works necessary to facilitate the development at Redgap Foliage Farm, Bolger's Lane, Hillsbrook, Co. Dublin
The development consists / will consist of: (i) retention of partially constructed domestic workshop or garage building and permission for continuance of the construction of said building for the incidental enjoyment of the existing main house, (ii) permission for a 2 storey extension to the side and rear and remodelling of existing 2 storey house including change of external finishes and demolition of existing domestic garage, (iii) relocation of existing vehicular site entrance and provision of ramped driveway and revised front boundary treatments and (iv) all associated site works and ancillary services as relates to the above, including changes in ground levels and a new waste water treatment system and percolation area.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
Alterations to existing two storey detached house to include partial demolition works, new two storey front extension, new single storey rear extension, new chimney stack to rear and side, alterations to existing external window fenestration, energy update including full external insulation system, revised external elevations, increased ridge and chimney stack height to facilitate new slate pitched roof, internal modifications, additional habitable floor area, landscaping works, SuDS drainage and all associated ancillary works to facilitate the development.
Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); 1 two storey ICT facility (building B) will be located to the north-west of Building A and centrally within the overall site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); each of the two ICT facilities will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas; 2 pump rooms of 25sq.m each (4 overall - 100sq.m) plus water storage tanks and plant as well as a separate house generator that will provide emergency power to the admin and ancillary spaces; each generator will also include a diesel belly tank with a single refuelling area to serve the proposed emergency generators; 1 temporary and single storey substation (26sq.m); ancillary site development works including attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables; other ancillary site development works will include hard and soft landscaping throughout the site, lighting, fencing, signage, central services road, security gate, sprinkler tank house and 80 car parking spaces and 17 sheltered bicycle parking spaces; the development will be enclosed with landscaping to all frontages including a wetland to the south-east and will be accessed from the Peamount Road (R120) located within the townland of Milltown on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer' as well as agricultural lands and buildings which are located to the north of the Peamount Road and the lands to the north and within the overall site are subject to a concurrent application for a Power Generation Facility under Reg. SD20A/0058; An Environmental Impact Assessment Report (EIAR) is included with the application.
Demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of the single storey stable building on the overall site; construction of a gas powered Power Plant with all its associated elements; the part single and part two storey property of Bulmer and an agricultural building to the east of the overall site will not be demolished; The Power Plant compound of 14,475sq.m will contain 2 Power Units each with 1 25m height stack (2 overall), transformers, air intakes and electrical modules; the Power Plant compound will also contain a two storey administration and workshop building (427sq.m) and LV switchgear building (140sq.m) (567sq.m in total) plus an AGI connection, gas compressor, water tank, water treatment, firewater tank and pumps, fuel skids, fuel tank and 1 emergency diesel generator; the proposal also includes a battery energy storage system compound of 3,300sq.m containing 15 battery containers and 15 inverters that will be linked to the Power Plant; the development will be accessed from a new vehicular entrance from Peamount Road that will provide access to the Power Plant at the rear of the site; all ancillary site development works, including attenuation pond and dry swales to connect to existing infrastructural services and network as well as fencing, signage, services road entrance gate and 8 car parking spaces; the development will be enclosed with landscaping to all frontages; an EPA-Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development for a period of 10 years on a site of 8.2 hectares on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer'.
Minor alterations to existing elevations and internal layout; demolition of an existing single storey living room extension & storage shed both to rear of dwelling and replacement with new single two storey extension to rear and side of existing dwelling; all associated windows, roof lights, landscaping, SUDS, site and ground works necessary to facilitate development.
Demolition of existing single storey living room extension and storage shed both to rear of dwelling and replacement with new single/two storey extension to rear and side of dwelling; reconfiguration of internal layouts of ground floor of existing house including raising first floor level and existing ridge level of roof; addition of bedroom dormer windows and feature entrance to front of dwelling including al associated windows, roof lights, landscaping, SUDS, site and ground works necessary to facilitate development.
(i) Demolition of an existing two storey, three bedroom dwelling and storage shed; (ii) construction of a new replacement two storey, detached four bedroom contemporary dwelling with a roof terrace to rear and roof lights; (iii) new side garden wall to the south-west; (v) new landscaping, SUDS drainage and all associated site and ground works necessary to facilitate the development.
Removal of the existing vehicular entrance, gates and driveway; new vehicular entrance to the east of the existing house with new gates and driveway and all ancillary site and landscaping works.
Renovation and extension of the existing house to include the demolition of a projecting two storey front entrance structure (7sq.m) and of a splayed two storey corner to the rear of the house (7sq.m); construction of ground floor extensions (17.6sq.m total) including a replacement single storey entrance extension to the front (9sq.m) and single storey extensions to the side (southwest) and rear facades (2.6sq.m and 6sq.m respectively); construction of a new dormer window to the rear at attic level (1.7sq.m); septic tank and percolation area upgrade; extension of rear terrace; renovations to the existing single storey garage and associated site works.
Modify the previously granted planning permission (Ref. SD25A/0161W). The proposed modifications consist of the construction of a dormer attic extension by converting the as-granted attic space for habitation, comprising of 1 no. bedroom, 1 no. en-suite and 1 no. wardrobe to all the 3-no. as-granted. The development will include alterations to the rear elevation, provision of cladding finish to the dormer exterior, and internal alterations to the existing first floor to facilitate access to the attic level.
Emerald Irish Creative Ltd, intend to apply for Planning permission for the construction of 03 no. two-storey residential dwellings situated to the rear of the existing property at 13 Mill Road, Saggart, Dublin. The proposed development will consist of 01 no. detached three-bedroom house and 02 no. semi-detached three-bedroom houses with private rear garden and car parking spaces, removal of existing steel shed at the rear garden, widening of the existing vehicular entrance boundary wall with a new gate. All with associated site works, landscaping, and drainage connected to existing services.
The development will consist of the omission of a permitted above ground installation (AGI) compound under Reg. Ref.: SD20A/0058, the provision of an AGI at an alternate location within the site, and the provision of a Pressure Reduction Metering System (PRMS) and a foul pumping station, along with road upgrades to the public road (R120 Peamount Road), and provision of a foul sewer connection from the site to the northeast, via Peamount Road and Old Nangor Road. The relocated AGI, PRMS compound, and foul pumping station will be located in the southeastern corner of the site. It is proposed to demolish an existing two storey vacant house (with a gross floor area of 235 sq.m.) to provide for the AGI, PRMS compound, and foul pumping station. The relocated Gas AGI and the PRMS will be located within fenced compounds and will comprise of the following buildings and gas-related infrastructure: - 2 no. AGI buildings comprising AGI Building 1 with a total area of c.18 sq.m and overall height of c. 3.4m and AGI Building 2 with a total area of c. 8 sqm and overall height of c. 3.1m; - A Boiler House Kiosk with a total area of c. 12 sq.m and overall height c. 3.5m and boiler flues with a total height c. 5.4m; - A new E&I Kiosk with a total area of c. 12 sq.m and overall height of c. 2.7m; - A new Control Room with a total area of c. 12 sq.m and overall height of c. 3m; - A new Skid House with a total area of c. 123 sq.m and overall height of c. 3.3m; - The compounds will also accommodate associated valves and pipework. A new foul water pumping station with associated chambers, meters and a 24-hour storage tank will be provided to the east of the AGI and PRMS compounds. The proposed developmbent includes all associated and ancillary works including site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site subject to an application for an EPA Industrial Emissions (IE) Directive license.
Extend office use into warehouse area at ground and first floor to provide for office at first floor and canteen and toilets at ground floor.
The proposed development includes the construction of: 6 no. Stage buildings (buildings 1,2,3,11,13 &14) ranging in height between c. 20m and c. 23 m and comprising 11 no. Internal sound stages with overhead catwalks and 2-storey ancillary production offices including office space, plant and switch rooms, toilets, ICT rooms, staff toilets and showers and rooftop plant (totalling c. 35,187 sq. m); 4 no. workshops (buildings 15,16,17 &18) ranging in height between c. 9m and c. 10.5 m and comprising internal workshop areas, staff toilets and showers, ICT, plant and switch rooms(totalling c. 18,244 sq. m); TV studio and reception (building 4) comprising 3 no. TV studios (c. 17.8m height) and various supporting spaces across 3 floors including backstage shooting area, green rooms, hair and makeup rooms, production suites with ancillary offices, wardrobe, laundry room, Technical support offices, vision dept, lighting dept, pro service, run and crew kit room, chief engineer office, studio manager office, scenic store, props store, cameras and grip room, lighting and electrical room, plant room, sound control rooms, vision rooms, recording rooms and toilets at ground floor level; standard dressing rooms, tv post production spaces, kitchen and crew area, toilets, mechanical/electrical room, technical offices, media store at first floor level; star dressing rooms, tv post production, lounge and kitchen and toilets at second floor level; Single storey reception building to include guest holding areas, VIP and Guest service, security offices, staff toilets, showers and locker rooms (c. 10,875sq. m); 2-storey Dining Hall with ancillary 100 seat theatre (building 6) comprising indoor and outdoor dining areas, kitchen, storage and mechanical rooms, toilets and 3 no. meeting rooms at ground floor level; office space and covered outdoor balconies at First floor level (c. 4,351sq. m) Standalone café (building 5) (c. 96 sq. m) 3 no. single storey production suites (buildings 7,8 & 9) comprising offices, conference room, kitchenette, communal areas and toilets (totalling c. 795 sq. m); 3-storey car parking deck (building 19) (c. 14,782.sq.m) to include 438 no car parking spaces ( including 100 no. EV and 27 no. disabled) with ancillary offices (building 20) (c. 4,307sq.m) refuse recycling area and rooftop plant; and Outdoor stage area associated with the TV Studio and Reception Building; Site landscaping to include: an amenity walkway and biodiversity area along the northern boundary of the site; public realm and planting areas in the vicinity of TV Studio and Reception Building and production suite offices; green roofs; and boundary treatments. Hard standing to include backlot area (c. 14,160 sq.m) and 'shooting lanes' (c.18,900 sq.m) to facilitate outdoor filming; Electrical Substation (c 236 sq. m); primary and secondary gate houses (buildings 10 & 12) (c. 19 sq. m each) The proposed development will include the provision of 516 no. surface car parking spaces (including 96no. EV, 13 no. disabled and 13 no. EV / disabled ); Basecamp area to provide 36 no. Large Vehicle parking spaces & 3 no. bus parking spaces to front of reception building as well as provision of Bicycle parking to include 274 no. covered spaces and 96 no. external spaces. Additional works to include removal of existing wall and vegetation at south western boundary; provision of bin store adjacent to the proposed backlot area and additional waste storage area adjacent to proposed dining hall; proposed pump station; rooftop PV panels (Buildings 17 & 18);rooftop plant; Building signage; LED video screen on eastern elevation of TV studio and reception building; public lighting; drainage and services provision; boundary treatments (including security fencing); piped site wide services; pedestrian and cycle links and all ancillary works and services necessary to facilitate construction and operation. The primary proposed vehicular, cyclist and pedestrian entrance from the newly constructed Grange Castle West Access Road will be located at the eastern boundary of the site with a secondary vehicular access at the southeastern corner of the site.
A single storey garage structure at the side of their home. This application is consequent on the grant of permission Ref. No. P98-228, dated 14/08/1998, of the permission for development at this site Balscott, Celbridge. The development consists of a single storey garage type structure used for domestic purposes only (car parking, DIY, storage etc)
Construction of a detached single storey bungalow; vehicular entrance; secondary effluent treatment system; all associated site works.
Replacement of existing septic tanks to two number existing dwellings with two number individual domestic wastewater treatment systems to current EPA standards each domestic waste water treatment system serving a single dwelling and all associated site works.
Construction of an outdoor all-weather horse arena and a building to contain stables to house horses and to contain farm machinery implements and fodder, also ancillary works (i.e concrete yards, gates and boundaries), also all for agricultural purposes only in new farmyard using existing farm & road entrances.
Anthony Neville Homes Limited intends to apply for permission for development on lands located adjacent to Drury Mills and Drury Park, Swiftbrook, Saggart, Co. Dublin. The site is located within the curtilage of protected structures associated with the former Swiftbrook Mills (RPS refs. 314, 330 & 332) comprising chimney, storage building, millpond, tail-race, entrance gates and wall. The development will consist of a residential scheme of 73 no. units comprising a mix of 6 no. houses, 59 no. own-door duplexes and 8 no. apartments arranged in 4 blocks set around a central amenity space. The mix of units will consist of 5 no. 1-bedroom duplexes/apartments, 46 no. 2-bedroom duplexes/apartments, 16 no. 3-bedrooom duplexes and 6 no. 4-bedroom houses. The 4 no. blocks are labelled A to D on plans and consist of: Block A - a 3 to 4-storey terrace accommodating 18 no. duplex units with associated balconies & terraces; Block B - a 2-storey terrace accommodating 6 no. houses and 2 no. duplex units with associated gardens & terraces; Block C - a 3 to 4-storey terrace accommodating 27 no. duplex units with associated balconies & terraces; Block D - a 4-storey terrace accommodating 8 no. apartments and 12 no. duplex units with associated balconies & terraces. The development will include: New internal roads accessed from Drury Mills and Drury Park; 84 no. car parking spaces; Bicycle and bin stores and substation; Landscaped public and communal open spaces and boundary reatments; All associated site works and services.
Installation of 360 PV solar panels covering an area of 720 sq.m on roof; all associated site and development works.
Retention Permission to retain and complete modifications to the internal layout of the existing unoccupied ground floor creche to provide a new reduced sized creche with an outdoor play area and to retain and complete the change of use from permitted creche use to accommodate three number one bedroom, one number two bedroom and one number three bedroom ground floor residential apartment units and associated open space provision. Permission for modifications to the southern elevation to include replacement of existing door opening with an infill wall at ground floor and modifications to the eastern elevation to include a replacement of an existing window opening with new entrance doors all located withing curtilage of a Protected Structure being the existing Rag Store, entrance gates, Chimney, Tail Race, Mill Ponds of the Swiftbrook Mill now known as Mill Race Green on foot of previously approved by An Board Pleanála decision PL 06S.248162 all at Mill Race, Saggart, County Dublin.
Permission for modifications to the internal layout of the existing unoccupied ground floor creche to provide a new reduced sized creche with an outdoor play area and change of use from permitted creche use to residential use to accommodate three number one bedroom, one number two bedroom and one number three bedroom ground floor residential apartment units and associated open space provision, modifications to the southern elevation to include replacement of existing door opening with an infill wall at ground floor and modifications to the eastern elevation to include a replacement of an existing window opening with new entrance doors all located within the curtilage of a Protected Structure being the existing Rag Store, entrance gates, chimney, Tail Race, Mill Ponds of the Swiftbrook Mill now known as Mill Race Green on foot of An Board Pleanála decision PL 06S.248162
The development will consist of change of use of existing agriculture buildings (561m2) and yard area on a site of.2016ha for the storage of green waste for transportation to a licensed composting facility and the storage of certified compost which is intended to be sold for use as animal bedding and fertilizer and all ancillary development. The proposed activity requires a Waste Facility Permit from South Dublin County Council.
The development will consist of the reconfiguration and extension of an existing semi-detached bungalow. The proposed works will modernise the residence from a simple two bedroom set up to a four bedroom home with open plan living. Entry gates and driveway configuration will remain as is. The aesthetics of the original house will be retained to the street.
Full planning permission for the following: (a) new single storey extension to rear of existing dwelling, (b) new single storey porch extension to front of existing dwelling, (c) new dormer window to rear of existing dwelling, (d) decommissioning and backfilling / removal of existing sewage treatment system and replacement of same with a new on-site domestic wastewater treatment system, (e) modifications to include widening of existing vehicular entrance pillars and gate, (f) modifications to existing window and door arrangements throughout, energy upgrades / retrofit including external insulation, connection to existing site services, boundary treatment, landscaping and all associated site development works
3 new buildings. Block A: two storey with six industrial and office units; Block B: two storey with one industrial and office unit; Block C: three storey with ground floor café and office, first floor offices, second floor gym and ancillary areas; new perimeter wall and fence with two revised entrances and gates; surface car parking and all associated site works.
Single storey extension and alterations to existing dormer style dwelling including the change of use of existing domestic garage to use as habitable space.
Retention for six steel containers for the storage of canoes and welfare area, a temporary structure which houses a gym. Permission for a club house which will contain storage of canoes, gym and welfare area; this proposed development would replace the existing steel containers and temporary structure. Development is to be completed in Phase 3, therefore a ten year permission is sought; all associated site and civil works.
Construction a two storey dwelling house; a new well; waste treatment system and polishing filter; access via farm roadways, landscaping and all associated site works.
The development will consist of a cemetery including: 8,047 No. traditional burial plots; Columbarium walls; 1 single storey reception building (214.7m2 Gross Floor Area (GFA)) comprising a reception, 1 office, 1 reception store, WC, kitchenette with photovoltaic (PV) solar panels at roof level; and the provision of an ancillary maintenance shed, bin and battery storage structures; The development includes a new vehicular access road from Garters Lane to the N7 /M7 Naas Road, with 2 vehicular access points serving the proposed cemetery; 110 car parking spaces (25 spaces to the east of the reception building and 85 within overflow car park areas to the south of the development); 8 bicycle parking stands; and all associated hard and soft landscape and boundary treatment works including the reshaping of an existing lake and provision of a footbridge; provision of SUDS measures, associated lighting, associated signage, site services (foul and surface water drainage and water supply); and all other associated site excavation, infrastructural and site development works above and below ground.
Single storey front side and rear extension with roof windows and all associated siteworks
Change of use of part ground floor of existing office / warehouse premises to a Deli-Cafe (Delicatessen - Cafe) to include a new recessed shopfront, signage and associated alterations and modifications.
The development will consist of A) minor demolition to the existing house to form new door open to the proposed extension, B) Minor demolition and alterations to the existing garage, C) The construction of a new single storey flat roof extension to the rear of the existing garage, and D) All associated site works.
For concrete slab recently installed in meadow to rear of existing dwelling. Planning Permission is also sought for storage shed to be constructed on the existing concrete slab which is also subject of this application. Above works along with associated landscaping and site work
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Demolish existing garage and connecting wall to house to modify the existing house; block window and change existing windows to large sliding door opening and form new dormer windows and ridge roof light to roof on south east elevation; demolish chimneys; form new entrance canopy and decorative piers from new dormer windows and dormer roof extension and change windows and door ope to north west elevation; raise first floor gable window head heights; new door and ground floor window to north east gable and re-roof entire house with new selected roof tile as well as change all elevation finishes to brick cladding on new external insulation; carry out internal alterations including increase first floor bedroom space into existing attic.
The construction of a new one-bedroom single storey timber frame dwelling to the Northwest of the rear garden. ii). Alterations to existing site entrance to facilitate visibility lines. iii). Connection to existing foul sewer. iv). All associated site works and landscaping.
Provision of public concert use at the Convention Centre.
Retain existing mezzanine storage floor as installed at first floor level; Permission to convert part of the first floor mezzanine storage floor to office space and install new windows to both the east (side) and the south (rear) elevations at first floor level.
(a) Change of use of existing unused horse stables (151.34sqm.) to a two bedroom, single storey, detached private annex dwelling to the main house on the same site. The new dwelling will be used by members of the same family and be served by existing access and car parking at the main house. No changes to the footprint of the existing building are proposed. (b) Permission is also sought for associated landscaping, foul and surface water drainage an all associated site works necessary to facilitate development.
Erection of a single storey extension to the front and side; Conversion of the existing garage to a kitchen dining room.
Two storey house; detached one storey domestic garage; effluent treatment system and polishing filter; recessed entrance and all associated site works.
For change of use of former attic to habitable area, the addition of a new balcony at first floor level at northern side of house, a new single storey extension to the southern side of the house including a roof terrace above, internal modifications and all ancillary works
A new vehicular entrance and boundary fence to new display surface car parking, on 0.15ha of vacant land, located west of the existing car parking including a 6m high internally illuminated signage totem and tensile fabric canopy structures. Extension of existing workshop by 208sq.m located to the north of Block B and extension of 106sq.m for new vehicle preparation to the north of Block B and internal alterations including a trade parts counter and a new double door on the west elevation of the showroom building, known as Block B, a two storey extension matching the existing height of Block C of 692sq.m to the north of the servicing area of the building known as Block C for vehicle servicing and waiting facilities and an external canopy structure of 200sq.m to the east elevation of the existing parts building known as Block A on an overall site of 2.257ha.