Alterations to the previously approved SD24B/0131. A first floor extension to the Front side and rear over the existing Converted Garage. Alterations to the existing hipped roof and the roof be extended over the proposed extension. With conversion of the enlarged Attic and Dormer window to the rear
Footpath within the western and southern boundaries of the site; erection of a new palisade fencing of 2.4m in height along the southern and western site boundary and a new pedestrian access gate from the north end of the site boundaries at Crag Avenue; single storey, detached vehicle control structure; provision of hard standing at the north west corner of the site; erection of 7 flood light poles and lights along the southern and western boundaries of the site; all associated site development and engineering works.
Erection of a new 2 storey extension to the side, with internal modifications and associated site works.
The development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343.
New vehicle entrance in south boundary to provide access to Old Nangor Road; new security gates; new internal road to access new entrance and all ancillary works.
New vehicle entrance in south boundary to provide access to Old Nangor Road; new security gates; new internal road to access new entrance and all ancillary works.
Retention permission of change of use from light industrial to coffee shop/restaurant/takeaway with external seating area and associated signage, with internal modifications and associated site works.
Partial demolition of existing outhouse to side to accommodate construction of ground floor kitchen/living room extension to side of existing dwelling, and associated site works.
Planning Permission sought for proposed two storey pitched roof extension to side (floor area = 12.17sq.m) with a proposed ridge height of 6.935m high, complete with first floor bedroom window to side/N.West elevation & 2no. 'velux' roof lights to front/S.West elevation together with associated site works
The refurbishment of Katherine Tynan House, or ‘Whitehall’, a Protected Structure (RPS ref.197), with change of use from disused dwelling to community centre. Works will entail refurbishment of the roof and external walls; reinstatement of windows and external doors; ceilings and floors; reinstatement of a conservatory and glazed porch (10sq.m and 5sq.m respectively); new internal stairs and doors; new services and sanitary accommodation; two new single storey open-fronted structures on part of the footprint earlier outbuildings with an enclosed area for toilets (534sq.m); refurbishment of historic garden walls and gates; upgrading of the existing non historic entrance and approach from the Ballymount Road; and provision for parking on site.
Demolition of existing 7.15 sq/m ground floor rear extension, change of use of 10.8 sq/m garage to habitable space; construction of an 18 sq/m first floor side extension; construction of a 33.2 sq/m ground floor rear extension; construction of a 2.3 sq/m porch to the front of existing dwelling and conversion of attic space to storage room.
Demolition of existing 3.3sq.m rear kitchen lean-too and construction of new 12sq.m ground floor extension with flat roof; construction of new 4.1sq.m first floor rear extension with pitched roof; internal alterations.
The construction of a concrete block boundary wall to north boundary of the front garden.
Installation of a 1.4m x 0.51m x 1.8m (LxWxH) above ground enclosure, to house a new natural gas DRI (District Regulating Installation) and a 3m high 'lamp post' style relief vent stack with all ancillary services and associated site works.
To erect a new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high with 1 no. double sided LED illuminated advertising display, along with all associated site works and services.
4 2-storey, 3 bedroom houses including parking and related infrastructural works, alterations and widening of existing vehicular access gateway at the front of the site onto Crag Avenue within the curtilage of the Protected Structures at No's 6 & 7 Ballymanaggin Lane (RPS reference numbers are 117 & 121 respectively).
Amendments to previous grant of permission SD14A/0157. Change of use of part first floor plan to create 2 addtional bedrooms, alterations and refurbishment of existing nursing home and all associated site works.
Replacement pitched roof over garage and courtyard; single storey utility, toilet and lobby extension to courtyard; single storey sunroom to the rear; single storey glazed porch to the front, at the Old Rectory, Belgard Road, Dublin 24
370sqm side and rear extension, new entrance, and new facade to front elevation.
Change of use from haulage yard to filling station open to the public; additional diesel pumps; palisade fencing; illuminated and non-illuminated signage; all associated site and development works.
(i) A Single-storey extension to the existing kitchen annex and (ii) A flat roof attic dormer extension. All works are to the rear of the house.
Two storey extension to the rear of existing dwelling, to include rooflights and all ancillary site works.
Two storey extension to the rear of existing dwelling to include roof lights and all ancillary site works.
Retention for ground floor rear Extension and permission for extension to first floor at rear and all ancillary site works
Construction of 2 two and a half storey, three-bedroom terrace houses and associated site works attached to the existing two and a half storey house at No. 6 Station Grove which was constructed in 2006; the 2 houses will complete this partially finished housing development which was originally granted permission under planning reference SD05A/0125.
The construction of a ‘Build to Rent’ residential development comprising of 115 apartments (10 x studio units, 62 x 1-bed units, 38 x 2-bed units and 5 x 3-bed units) in 1 block, ranging in height from 2 storeys to 8 storeys over basement level with private balconies/terraces. The proposed development will also comprise of residential amenity facilities and services at ground floor level consisting of a gym, lounges, games room, conference room, meeting room, studio, concierge, bin store, and bike stores (140 spaces). A total of 48 car parking spaces at basement level with a drop-off/service lay by at ground level, 224 bicycle parking spaces across basement, ground floor and surface levels, landscaping including 1 communal roof terrace at 2nd floor level and a landscaped courtyard at ground floor level, public realm works including a new pedestrian path from the public open space at Monastery Gate to the north and along the southern site boundary with a pedestrian connection to Monastery Road to the south, public lighting, boundary treatments 2 no. ESB substations at ground floor level, plant at basement and roof levels and all associated site development and infrastructure works including foul and surface water drainage, necessary to facilitate the development. Vehicular access to the site is from Monastery Road (via the existing access road to the IBIS Hotel) with pedestrian access from Monastery Road and Monastery Gate. The development also provides for all associated site clearance works.
A new single storey front, side and rear extension with roof windows comprising of a den, utility room, living area, WC and kitchen. Convert attic to bedroom with new roof windows to front & rear of existing roof and all associated site works.
Retention of replacement single storey pitched roof office building (183.7sq.m) and associated site works; the original flat roofed office building comprised 132sq.m; totem sign 1.37m wide x 5m high.
Demolition of the existing single-storey extension to the side. New two-storey extension to the side. With a side window on the first floor. Change and raise the roof profile of the existing porch to a parapet-new first-floor extension with change of main roof profile. Four Roof windows to the main roof area. Attic conversion for storage. New front window to the attic second floor. New shed to the front garden
To change condition No. 4 of Planning Application SD20A/0062 to increase the number of children attending any one session from 16 to 20
Revision of previously approved planning SD09A/0313 including increase the number of children attending the playschool to 16 (maximum) in any one session; change opening hours to 9am - 12pm (morning session) and 12:30pm - 3:30pm (afternoon session), Monday to Friday; minor internal changes to the playschool; all associated site works.
Retention permission and continuation of use of a former double height warehouse within their building as 426.6sq.m of office use, over two floors as well as all associated and ancillary elevation changes.
The proposed development includes retention permission for the reorientation of the gas AGI (above-ground installation) compound permitted under SDCC Reg. Ref.: SD23A/0158 and to retain an existing Gas AGI skid located to the north of the gas AGI compound. The development also includes the retention and completion of an extension to the existing Gas AGI compound to the south, to provide for a pressure regulating and metering station (PRMS) compound area. The PRMS compound extension comprises the following buildings and gas related infrastructure:•Skid House structure with a total area of c. 118 sq.m and overall height of c.3m. •E&I Kiosk with a total area of c. 11 sq.m and overall height of c. 2.7m •Boiler House comprising 2 no. individual units (Boiler House 1 & Boiler House 2) both with an area of c. 22 sq.m and overall height of c.3m. •Gas Quality Building with a total area of c. 3 sq.m and overall height of c. 2.4.m • All associated and ancillary works including valves and pipework, site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site which is subject to an EPA Industrial Emissions (IE) Directive license.
Install a second cremator within the existing crematorium building to be powered with electricity; the new unit will be located beside the existing unit within the building (the building was originally designed and built for 2 units); internal alterations to the building including removal of non-load bearing block walls to facilitate the new unit; extension to the west side of the building to provide staff changing facilities and a cremulator room (20.2sq.m); extract system to be connected to the existing flue; partial demolition of existing boundary wall to facilitate a new sub-station/switch room, the laying of underground ducts for ESB connection, underground cabling and all ancillary works to facilitate the development.
Wastewater pumping station comprising of (a) below ground 24-hour emergency storage tank; (b) below ground inlet, wet well, flow meter and valve chambers; (c) control and welfare building with green roof and 2 odour control units; (d) boundary wall, fencing, entrance gate and landscaping; (e) site drainage system including a swale; (f) all associated ancillary and enabling works including hardstanding and access, located within the Clonburris Strategic Development Zone.
The development consists of a two-storey extension to the side, a single-storey extension to the rear, a rear dormer roof, and necessary ancillary work to facilitate the development.
Internal separation of house and associated granny flat to provide for 2 permanent houses.
Internal separation of the house and associated granny flat to provide for 2 permanent houses and extension of rear garden. Part of the development site is located within the Clonburris Strategic Development Zone.
The provision of alternate entrance and access arrangements from Crag Avenue to serve the permitted data storage centre, energy centre and substation development permitted under Reg. Ref. SD18A/0068, as amended by Reg. Ref. SD19A/0185 including the provision of ducted services connections between the permitted substation on site (permitted under Reg. Ref. SD18A/0068 as amended by Reg. Ref. SD19A/0185) and existing services to the south of the Grand Canal. The proposed ducted services connections will exit the permitted substation compound and run southward, crossing beneath the Grand Canal by way of a horizontal directional drill, before proceeding east and west to connect to existing services located to the south of the Grand Canal. This proposed development is also located on lands within the Grand Canal Corridor to the north of the R134 Regional Road, Clondalkin, Dublin 22.
Construction of single storey extension with flat roof to the rear of existing house; alterations to ground floor plan; roof light to the rear and all associated works.
2 prefabricated units for use as an office (31.5sq.m) and a canteen (23.3sq.m) located adjacent to the existing permitted Retail Shop (Ref. SD16A/0239) within a 0.0125 hectare application area at the existing quarry.
Conversion of existing attic space comprising of modifications of existing roof structure, raising of existing gable c/w window and Dutch hip and new access stairs and flat roof dormer to the rear.
Retention for the continued use of the existing 25 metre high free standing monopole communication structure carrying antenna and communication dishes (total height including antenna 28 metres) within an existing 2.4m high palisade compound previously granted temporary permission SD16A/0164
The removal of existing roof finish to the side (southern) extension granted under SD13B/0233 and replacement of same with standing seam engineered roof covering
Attic conversion with dormer to rear roof to accommodate stairs to allow conversion with dormer to rear roof to accommodate stairs to allow conversion of the attic into a non-habitable storage space with roof windows to front roof, Gable window to side all with associated ancillary works.
Single storey extension to rear of existing dwelling; relocate existing pedestrian gate to new position as shown on plans; gate was granted permission under Ref. SD16B/0092; all ancillary site works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
One bedroom, two storey semi-detached house including associated hard and soft landscaping; off-street car parking; connection to existing public main sewers and boundary walls.
Construction of new side dormer structure at attic level and conversion of the attic space to a bedroom and bathroom. The dormer structure allows for stair access and a functioning bedroom and bathroom with limited space available from the existing hipped roofed structure
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.