(1) discontinue and seal existing well on site (2) sink new bored well as replacement and (3) permission to revise site boundaries and all associated site and ancillary works1 condition indexed
Alterations to dwelling type as a change to that granted under Planning Register Reference 05/3929, retention of Kingspan Biotec Wastewater Treatment System type as a change to that granted under Planning Register Reference 05/3929, retention of domestic garage. PERMISSION is sought for revised site boundaries, decommission existing on site effluent disposal polishing filter and install new on site effluent disposal polishing filter and install new on site effluent disposal polishing filter as a replacement and all associated site and ancillary works2 conditions indexed
As constructed dwelling and planning permission to upgrade existing effluent treatment system in a revised location to comply with current EPA requirements, permission for revised boundaries, permission for removal of section of driveway and construction of new section of drivewayDecision record indexed
(1) Minor alterations to elevations and layout of previously granted storage sheds under file ref 19/1274. (2) Retention of existing steel silo and ancillary works, stone walls and timber cladding-required for the installation of new heating system. Full planning permission for (3) Conversion of an existing granted machinery store under file ref 19/1274 to a new kitchen facility to service wedding guests. (4) Conversion of an existing store unit to restaurant facility for the use of wedding guests. (5) The conversion of an upper floor loft space to 2 no. bedroom en suite accommodation units. (6) Proposed new lean to extension circa 191 sq.m. to the rear of the existing reception room and store (now proposed restaurant) which will provide for more suitable location for vintage machinery store, wood store and a proposed new alcohol and keg store and all associated site worksDecision record indexed
Restoration of two derelict former farm buildings for use as storage buildings ancillary to the Ballybeg Wedding facility, change of use from an existing storage room to a room for use as part of the ceremony room, change of use of an existing storage building for use as 3 no accommodation units with associated kitchen ancillary, change of use from an existing storage room to a laundry, change of use of a previously permitted laundry into 1 no accommodation unit all of which will be ancillary to the use of the Ballybeg Wedding facility. Permission is also sought for changes to elevations and a new foul pipeline connection from the proposed accommodation units to the previously permitted Eurotank Wastewater Treatment system under granted planning permission 18/447 and all ancillary site development works10 conditions indexed
Construction of an extension to the existing house and new shed, replace existing front boundary which consists of a sod and stone bank with a 1.2metre natural stone-faced wall and all ancillary site worksDecision record indexed
Construction of: (1) a new dairy cow road underpass with new farm roadways, (2) a new milking parlour with dairy and dafting area, (3) a new open collecting yard with an external slatted tank, (4) a new meal bin, (5) a new pipeline to the existing geo-membrane lined slurry store, (6) a new concrete apron, (7) removal of the existing horse sand arena wooden fence, (8) removal of the existing external milk cooling tank, (9) decommission of the existing milking parlour and collecting yard, (10) removal of the existing farm entrance side walls and hedges to create wider farm entrance and for a setback of the western roadside hedge to provide sufficient sightlines on both sides, (11) all associated site development worksGrounds not yet categorised
Construction of: (1) a new dairy cow road underpass with soiled water sump tank with new farm roadways, (2) a new milking parlour with dairy, drafting area and covered collecting yard with an internal precast concrete slatted channel, (3) a new underground precast concrete covered channel connected to the existing channel to discharge slurry to the existing geo-membrane lined slurry store, (4) a new meal bin, (5) a new concrete apron, (6) removal of the existing horse sand arena wooden fence, (7) removal of the existing external milk cooling tank, (8) decommission of the existing milking parlour and collecting yard, (9) removal of the existing farm entrance side walls and hedges to create wider farm entrance and for a setback of the western roadside hedge to provide sufficient sightlines on both sides, and (10) retention permission for the existing geo-membrane lined slurry store (11) and all associated site development worksDecision record indexed