For the phased extraction of 2.9 hectares of sand and gravel over a period of 7 years, on land located in the townland of Ballymaloney. The proposed development includes for the provision of a new site entrance and vehicular access road; on site wheel wash facility; new drainage channel, silt fence and settlement pond; landscaping and buffer planting on the eastern site boundary including a 3m high embankment with hawthorn hedging adjoining the public road; and site restoration works. One passing bay is being developed for vehicular traffic on the public road leading to the site (L3022-8) in the townland of Ballyquin More
Of existing farm shed and cattle crush, and PERMISSION to erect a new vehicular entrance and close up existing vehicular entrance and all associated site works
For a replacement single storey detached house, a waste water treatment system and all associated works
To construct a workshop and storage together with associated site works at the rear of the house
The development consists of the construction of an extension onto existing slatted unit and associated site works
To construct a new slatted house and associated site works
For the construction of a detached 2 storey dwelling, new entrance, bored well, onsite wastewater treatment system, connection to necessary services and all associated ancillary and site works
For a single dwelling house, attached carport and garage, advanced wastewater treatment system along with ancillary site works
For the construction of a slatted agricultural building with an underground slurry storage tank for housing livestock on the existing farm complex together with all associated ancillary and incidental works
Of existing entrance and garage/shed as constructed and all associated site works
For demolition/refurbishment of selected existing farm buildings for storage purposes, the installation of a new well, revision of existing farmyard and farm access arrangements along with any associated site works
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, re-locate existing agricultural entrance, including all ancillary site works
To construct a single dwelling house, garage, advanced wastewater treatment system along with ancillary site works
To refurbish an existing house and to construct a ground floor and a dormer roof extension, which includes the provision of a supported living accommodation unit, and all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application
To refurbish an existing house and to construct a ground floor and dormer roof extension and a Granny Flat extension to the existing dwelling house and all associated site works
For Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application
To RETAIN an Outbuilding/ Shed and all associated site works.
For a small extension (comprising staff room to existing creche facility and all associated site works
To erect a dwelling house, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
To erect a dwellinghouse, garage, entrance and install an effluent treatment system and soil polishing filter and all associated site works
For (a) to demolish an existing agricultural shed and (b) to construct a new dwelling house complete with a new entrance, sewage treatment system and ancillary works
For a two-storey detached house, new site entrance, new septic tank connected to existing waste water treatment system and all associated works. A Natura Impact Statement will also be submitted to the Planning Authority
To construct a garage with first floor study and link to their existing dwelling house along with all associated site works
To develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application
For a new dwelling, wastewater treatment system, polishing filter, entrance and all associated site works
To develop a swimming platform, and associated site works. A Natura Impact Statement accompanies this application.
To erect a dwelling house and garage, install an effluent treatment and soil polishing filter and all associated site works and also retention permission for existing access road to the site
To remove existing septic tank and install an effluent treatment system and sand filter infiltration area and all associated site works
To RETAIN private domestic garage at the rear of house and all associated site works
To RETAIN alterations to elevations and roof of existing house together with all associated site works
To construct a storey and half dwelling house, installation of a wastewater treatment system and percolation area, new site entrance and associated site works
Of a) converted attic area to habitable use, b) retain covered area to rear of dwelling, c) retain stand alone store building to rear, d) retain modifications to elevations and e) retain entrance to site as constructed
For the construction of a new dwelling house which is single storey & part two storey, with ground floor garage attached to the dwelling, externally accessed green house, proposed wastewater treatment unit with polishing filter and percolation area, new site vehicular entrance and all associated site works
To erect a dwellinghouse, garage, entrance and install an effluent treatment system and percolation system and all associated site works
For the construction of a dwelling house, bored well, waste water treatment system, percolation area, entrance and all associated site works
To construct a new split level, two storey, three bedroom dwelling house, new entrance off the L4016 Scarriff to Flagmount Road, driveway, new effluent treatment and percolation system and new bored well together with all ancillary works on part of their family lands
To construct a dwelling house, entrance, driveway, wastewater treatment system, bored well and all associated site works
The development consists of the construction of a slatted unit and associated site works
To construct a dwelling house, domestic garage, install a waste water treatment system with percolation area and associated site works
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
To widen existing forestry access entrance and all associated site works to existing forestry lands
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To erect a dwellinghouse and install an effluent treatment system and percolation area and all associated site works
To construct a dwelling house and domestic garage, install a waste water treatment system with percolation area and associated site works
Of the development which consists of: a) Alterations to the internal road layout and b) Existing road entrance and c) A change of layout of camping pods and d) A change of camping pod type, all from that previously granted Planning Permission under Planning Reference No. P.16/114. It is proposed to retain the development for an indefinite period.
Of garage/shed as erected to rear of house and all associated site works
Of entrance and front boundary wall as constructed and all associated site works
To erect a private dwelling house, install an effluent treatment system and percolation area, access road and all associated site works
For the construction of an extension, modifications to an existing dwelling house, and all associated site works
To construct a garage / shed