For development which will consist of the construction of a dwelling house with garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of a revised dwelling house with garage design, to that previously approved under planning ref. P20-334
To construct a new dwelling house, on-site wastewater treatment system and all associated site works and services
To develop a motorway service area and rest area adjacent to Junction 12 of the M18 motorway, which will include service station building with convenience shop, food court, staff facilities, canopy, fuel facilities, parking and circulation space, children's play area, picnic area and access provision. The development also includes infrastructural works public lighting, signage, landscaping, internal fencing, electrical substation, sixteen electric car charging points, roof mounted solar panels, storm water runoff, petrol interceptors and attenuation system, on-site wastewater treatment plant including access road, pumping station and connection to public foul sewer, drainage improvement works, underground fuel storage tanks, rain water harvesting system, connection to public water supply, underground storage tanks for fire-fighting purposes, underground rain water harvesting tanks, works to improve visibility at access point, upgrade to adjacent roundabout and ancillary works. The connection to the public sewerage system will be by means of a rising main to an existing public sewer. The rising main sewer will cross under the M18 motorway by directional drilling and thereafter underground via existing road margins/public road and under River Fergus and railway line through the townlands of Kilbreckan, Killow, Skehanagh, Clareabbey and Ballybeg. The inert soil from the directional drilling will be used in landscaping works on the site of the service station building. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
To construct an entrance, dwelling house and wastewater treatment system with soil polishing filter together with all associated site development works and services.
To construct a new dwellling house, garage and waste water treatment system
To construct a dwelling house, garage and waste water treatment system
For development which consists of the construction of an agricultural wood / biomass drying storage unit and associated site works
To construct a dwelling house and garage, with effluent treatment system, entrance from the public road, and all associated site works
To demolish an existing Industrial building and associated works on site and to construct a dwelling house and garage, with effluent treatment system, with all associated site works
To demolish an existing derelict dwelling, and to construct new replacement dwelling, install a new effluent treatment system, all with associated works, and accessed by means of an existing entrance and driveway from public road
To demolish and existing derelict dwelling and to construct a new replacement dwelling, install a new effluent treatment system, all with associated works and accessed by means of an existing entrance and driveway from public road,
For development at Dromoland Castle and Estate, (Dromoland Castle is a Protected Structure: RPS No. 278). The development will consist of: the demolition of the 20th century / non-original infill structures at the castle courtyard and the construction of a glazed roof structure (max height c.11m) to provide additional internal guest recreation / dining space for guests (c.300sqm additional floor area); Demolition of existing part one/part two element and the construction of a part three/part four storey extension to the existing 21st century castle's east wing to provide additional guest accommodation, resulting in the loss of 1 No. existing guest room and an additional 17 No. guest rooms, resulting in a net gain of 16 No. rooms within this part of the castle. Internal upgrades and reconfiguration to the castle's ground floor, resulting in a consolidated kitchen / back of house area and improved and extended guest dining and bar facilities, installation of new lift, alterations to ancillary facilities and loss of 3 No. existing guest bedrooms. Internal upgrades and reconfiguration at the castle's lower ground floor level, to provide additional bar space, kitchen facilities, the upgrade of existing spa areas together with the introduction of new wet spa facilities, all resulting in the loss of back of house space and 1 No. guest bedroom. Removal of existing deck and canopy and the extension of the existing clubhouse building through the reinstatement of the former orangery building to provide a guest restaurant / event space; Alteration and change of use of existing farm structures from agricultural to a golf maintenance facility and central delivery and procurement hub for the estate, including staff car parking to provide 11 No. spaces, including accessible spaces and EV charging spaces; and the provision of new / formalised car park to serve the Castle guests and Brian Boru Hall (event facilities) to provide 85 No. spaces, including accessible spaces and EV charging spaces. The proposed development will also comprise all ancillary landscaping and boundary treatment works, site services, wayfinding, site lighting, and all other associated site excavation, construction compound, infrastructural and site development works. The planning application includes a Natura Impact Statement
To construct a two storey dwelling house, waste water treatment system and all ancillary and associated site and ground works
For a Dwelling House and garage, new site entrance, connect to proprietary waste water treatment system, a bored well and carry out all ancillary site works
Permission consequent on the grant of outline permission (Ref: 21/1394) for the construction of a Dwelling House and Garage, new Site Entrance, Waste Water Treatment System, a bored well and ancillary works
To change design of proposed renovation and extension of existing private dwelling house previously granted under Planning Register Reference P16-317 to include (a) demolition of existing side, front and rear extensions, (b) construct new single storey and storey-and-a half side extension and all associated site works
For replacement of an existing dwelling with new dwelling and all associated site works. The new dwelling will be in accordance with that granted under Planning Register Ref. P20/10
For an amendment to the granted Planning Permission (P20/158) for development which will consist of 1) Roof design amendments to the 3 granted on site bungalows house Type A, numbered 1,2 and 3, as granted under planning permission P20/158. 2) House design changes to all other units previously granted, numbered 4-21. The road layout and access arrangements to remain as previously granted under planning permission P20/158
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For development which will consist of: 1) Omission of 3 number blocks of semi-detached houses numbered B04 to B09 as previously granted under planning reference P20-158. 2) Inclusion of 5 number blocks of semi-detached houses in lieu of units omitted and amendments to the house design in accordance with house type designs submitted this application. The road layout, access arrangements and boundary treatments to remain as previously granted planning permission under P20.158
To construct an entrance, dwelling house, garage, wastewater treatment system with soil polishing filter together with all associated site development works and services
To construct dwelling house, shared entrance, waste water treatment system and percolation area, bored welll plus all ancillary site works
To RETAIN the construction of lean- to extension to side of garage & extension to rear of garage to include roof area, boiler house, balcony and retention permission for alteration of position of treatment plant and percolation from that approved under P03-1728, including ancillary site works.
To RETAIN garage and all associated site development works and services as constructed
To Extend the Appropriate Period of Planning permission for P20/562 the development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
The development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application.
To construct 22 no. houses, to include the following: (a) 3 no. two-bedroom detached bungalows; (b) 4 no. blocks to include a total of 8 no. three - bedroom semi detached houses; (c) 3 no. blocks of 3 no. terrace type houses to include 2 no. three bedroom and 1 no. four-bedroom house in each terrace (9 no. houses in total) (d) 2 no. three-bedroom detached houses. Connect to public foul sewer. Surface water to discharge to stream. Connect to public water supply, connect to public services (telephone and electricity). PERMISSION is also required to access the development via development previously granted under Planning Ref. 99/232 Previous permission granted on this site under Planning Ref No. 06/161
Of 1. Change of use of existing domestic garage to a full day care service. 2. RETAIN and complete partially constructed extension to existing garage to be used as part of the day care service
Is sought for the construction of a dwellinghouse, domestic garage, and for all ancillary services and site works. PERMISSION is also sought for the sub-division of an existing site
For the construction of a slatted unit and loose shed with associated site works
For development which will consist of the following, (1) The relocation and extension of the existing first level retail outlet into an existing enclosed courtyard (2) A new yoga-meditation at the lower floor level in the existing courtyard (3) Minor alterations to existing internal walls and layout (4) Ancillary site works (The development is proposed within the existing hotel complex a protected structure Dromoland Castle, Dromoland)
For an extension to and the change of use of an existing outbuilding to short-term tourist accommodation, connection to existing Wastewater treatment system together with all associated site works
Of the conversion and change of use of previous outbuildings to short-term tourist accommodation together with all associated site works
For material change of use of an existing Montessori school building to a private residence, construct extension and renovate existing building along with all ancillary works
To Extend the Appropriate Period of Planning Permission of P16-353 to demolish existing shed and to construct new detached Naionra (Montessori school) building with all associated site works
To construct a storage shed together with ancillary site development works and services
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To RETAIN existing garage and rear timber structure as constructed along with associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the construction of a shed attached to the side of the existing dwelling house and a detached shed to rear of existing dwelling house, all with associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To renovate and extend existing private dwelling house, construct detached garage and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To section off part of the existing shop for use as an 'Off-Licence' including all ancillary site services and site works
For the development which will consist of a new guest carpark including petrol interceptor, surface water attenuation tank, connection to existing surface water drainage system, carpark lighting and ancillary site works (The development is proposed within the curtilage of a protected structure Dromoland Castle, Dromoland)
For development at Dromoland Castle and Estate, Dromoland, Newmarket-on-Fergus, Co. Clare (Dromoland Castle is a Protected Structure: RPS No. 278). The development consists of:- The demolition of existing golf maintenance shed and the renovation and conversion of the existing stables building from golf storage/maintenance to visitor accommodation to provide 13 no. rooms/ suites, including an integrated bat loft, removal of solar panels, alterations to roof and openings, including installation of new and replacement doors, windows, gates, rooflights, infill wall sections, internal alterations and associated landscape works. - The renovation and conversion of the existing ‘Gardener’s Cottage’ from staff accommodation to visitor accommodation, including removal of existing storage shed, removal of existing rear lean to extension and replacement with two storey extension, new storage shed, internal alterations to provide a 4 no. bedroom guest house, 1 no. car parking space and associated landscape works. - Alteration and extension of existing clubhouse building to provide an enhanced wellness area and associated facilities, including replacement and extension of external deck to rear (south) with single storey timber spa structure, single storey extension to front (north) elevation, together internal alterations. - Installation of 3 no. sauna huts on lake island accessed via existing bridge, including raised timber walkways and floating timber jetties with plunge pools; - The provision of a new formal staff car park to the south of the stables building to provide 61 no. spaces, including accessible and EV charging spaces; - The provision of new/formalised car park to serve Brian Boru Hall (event facilities) to provide 21 no. spaces, including accessible spaces; and - Alterations to the existing stables car park resulting in a reduction of 4 no. spaces (36 no. spaces remaining), including accessible spaces; and - The provision of new/ formalised car park to serve the club house/ wellness centre to provide 10 no. spaces, including an accessible space. The proposed development will also comprise all ancillary landscaping and boundary treatment works, bicycle parking, biodiversity enhancement measures, wayfinding/ signage, site services, site lighting, construction compound, and all other associated site excavation, infrastructural and site development works. The planning application includes a Natura Impact Statement
To construct a new agricultural entrance onto the public road including site works
For development to construct a new parish office adjacent to Fahy Hall, all connections to water supply, public sewer and all ancillary site services and works required to facilitate the proposed development
To construct a Private Dwelling House, Garage and Site Entrance along with all associated site works