Planning records
Showing 351-400 of 2,720 public recordsTo retain side extension to dwellinghouse together with all associated site development works, boundaries and connections to public services
To (a) create new shopfront for existing ground floor retail area (b) carry out internal alterations. (c) carry out fenestration changes, install new windows, doors and roof together with all site development works and services
For the following development: (a) to sub-divide the existing retail shop to provide two individual retail units; (b) to make elevational changes to include the construction of a new shop front and new entrance; (c) all associated site works and services
To RETAIN (a) two storey rear extension (b) attic conversion (c) extension over garage (d) rear shed as constructed together with all ancillary site development works and services
To demolish existing shop front and erect new shop front together with associated works
For development at (Record of Protected Structure No. 742). The area of the existing ground floor is 191.7m² and first floor is 134.5m². The development will consist of the following and all associated site works and services: 1) Change of use of the existing ground and first floor from office to language school. 2) Internal modifications comprising of the following: 3) New wall construction for stair lobbies. 4) Subdivision of the ground floor reception room into an office and reception. 5) Enlarging existing door openings. 6) New disabled wc to the ground floor. 7) Construction of new doors to the ground and first floors. 8) Fire rating of the existing first floor. 9) New fire rated doors. 10) Connection to existing services and all associated site development works
To construct warehouse to include cycle assembly area, storage area, staff room, kitchenette, staff WC and to connect to ancillary services
To (a) Demolish existing flat roofed extensions and store (b) Construct an extension consisting of a ground floor retail unit and 1st floor apartment (c) Carry out internal alterations and external fenestration changes to existing building which is a protected structure (RPS No. 788) together with all associated site development works
To replace the first floor windows on the front elevation of the building which is a protected structure (RPS No. 783), with all associated site works
Of alterations to pre-existing shopfront at 18 O'Connell Street, Ennis, which is in use as a shop.
To construct a garden building for use ancillary to the enjoyment of the existing dwelling, together with all associated site development works and services required to facilitate the proposed development
To (a)RETAIN front parking area as constructed, (b) CONSTRUCT an extension to front of dwelling house together with all associated site development works and services
Is being sought for (A) demolition of defective rear porch (B) construction of two storey extension to the rear of existing dwellinghouse. (C) construction of First floor extension over existing garage (D) change of use for domestic garage to sitting room (E) changes to elevations and all associated site development works
To (a) demolish side extension (b) construct new extension (c) carry out renovations and fenestration changes together with all associated site development works and services
To carry out the following development: The proposed works include for the following: a) Change of use from bar and restaurant to multi-use community spaces, exhibition and heritage space, tourism space, the retention of existing ground floor cafe & existing kitchen (over two floors) and the retention of bar licence; b) Addition of accessible platform lift internally to make all three floors accessible; c) Addition of a universally accessible toilet and changing places toilet to ground floor; d) Provision of storage internally: e) Stripping out of superficial decoration such as carpets, internal walls and ceiling fittings; f) Creation of 'Art Wall' on ground floor exterior onto Abbey Street in order to facilitate engagement with art in the public realm including digital display and projected media; g) Internal and external decoration; h) Signage externally. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development and as such an EIA is not required. This development proposes works to a Protected Structure (RPS No.: 736 / NIAH No.: 2000141 as noted in the Clare County Development Plan 2023-2029 Volume 4 and that is part of a National Monument (No.170/ RMP CL033-082001 - Ennis Friary Complex)
Of external works after the removal of the of the raised lettering shop front sign on O’Connell Square and Arthur’s Row, the ATM, Night-safe, Ulster Bank window vinyl and the Ulster Bank general blue signage and bus stop sign. Carry out permission of internal works for the removal of the ATM’s in stud walls, as well as the removal of loose furniture and the removal of Ulster Bank signage and merchandise on all floors.
For material change of use of part of existing dwelling house to creche, along with ancillary works
Of existing garden shed, as constructed
To a) erect signage b) RETAIN alterations & fenestration changes c) PERMISSION to extend café / deli / wine bar d) PERMISSION to change use of part of building to Bank/Financial Institution, Chemist/ Pharmacy, Doctor / Dentist Surgery, Hair dressing Salon, Health Centre / Clinic, Laundrette / Dry Cleaner, Licenced Premises, Offices, Shop, Take away together with all associated site development works and services
To construct a two-storey building incorporating 6 No. 1-Bedroom apartments, and a single storey building incorporating 6 storage sheds to be used in conjunction with the apartments, connection to public services and all associated site works to accommodate the development, all accessed by means of an existing covered passage way (Bow-way)
To construct a single storey building incorporating 3 No. 1-Bedroom apartments, connection to public services and all associated site works accessed by means of an existing covered passage way (Bow-way)
The works will consist of the following; a. Existing softwood cupboards in the mortuary chapel to be removed. b. Proposed 2 no.. sets of bronze plated columbarium units to be fitted into the vacated space. c. White oak trims to units and white oak veneer mdf panelling to the surround of the Columbarium units. The Cathedral is a Protected Structure, RPS No.781
For the removal of the existing flagstone paving and access steps to the Cathedral entrance plaza; the construction of a new reconfigured stepped stone access together with new stone paving to the entrance plaza; the refurbishment of the existing Marian shrine; and all associated site development works and services necessary to facilitate the proposed development at St. Peter & Paul Cathedral, Upper O'Connell Street, Ennis, Co. Clare. The proposed development is located within the curtilage of the protected structures of St. Peter & Paul Cathedral (RPS No.781) and the Parochial House (RPS No 782)
For a 3 year permission for retention of temporary free standing food kiosk to serve an outdoor seating area previously granted a temporary permission under planning permission Ref: P21/420
For the provision of a temporary food kiosk for a two year period to serve an outdoor seating area
To Extend the Appropriate of Period of Planning Ref P16/919 for development of a dwelling house, proprietary wastewater treatment plant with percolation area, a private garage, entrance and associated siteworks
To construct a new dwelling house, access road, entrance, garage, and install a new wastewater treatment system on an infill site along with all associated site works
To construct 2no. single storey extensions, refurbishment works, and ancillary site works necessary to facilitate the proposed development to the main hospital building of St. Joseph’s Hospital, Lifford Road, Ennis. A protected structure is located on the site of St. Joseph’s Hospital. No works are proposed to the protected structure as part of this application.
To carry out works within the confines of Tim Smythe Park, Lifford, Ennis. The works involve the following: I. to upgrade and extend the existing changing room building. This will consist of shower areas, changing rooms, toilets, services area and caretaker's office, replace existing roof with new. ii. To provide new extension and link section connecting to upgraded changing rooms. The new extension will consist of changing rooms shower areas, toilets and accessible changing room. iii. To re-locate part of the existing basketball court surface and fencing to accommodate the proposed extension. iv. To connect the upgraded changing rooms and proposed extension unit to existing site services. v. All associated site works pertaining to the upgraded changing area and proposed extension. The site / development is located within the Ennis Architectural Conservation Area and the proposed work would materially affect the character of the area concerned. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environment Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
For development, the development consists of a Two-Storey Extension with 6 no. Classrooms, GP hall, 2 no. SEN classrooms (ASD early Intervention Unit classrooms) 2 no. Ball Courts, additional Staff Carparking and all associated site works
For development works at Cathedral House, Station Road, Ennis. The works will consist of the following: a. Replacement of roof coverings. b. Replacement of windows. c. Extension of first floor over kitchen area. d. Demolition of rear shed and construction of replacement shed. e. New side entrance to house and modification of entrance to chapel. f. Internal works including installation of lift. installation of new bathrooms, upgrade to mechanical and electrical services and all associated drainage and site works. The Cathedral House is a Protected Structure, ref E82, NIAH # 20001096.
For the refurbishment of the Tourist Office and Eastern section of the County Museum building. The proposed development will include: 1) Alterations to the internal layout of the Tourist Office. 2) Replacing the existing entrance doors on the North and South elevations with new timber entrance doors and side screens. 3) Break through the Western wall of the Tourist Office and install a full height window. 4) Change the use of part of the second floor to office accommodation. 5) Provide a new vehicular ramp and planters from the Friary Car Park to the North elevation of the building. 6) The installation of associated signage. 7) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development. Ennis is a recorded monument and place (RMP) and is classified as a historic town by the Archaeological Survey of Ireland. These works are located within the Architectural Conservation Area (ACA) and would materially affect the character of the ACA. There are a number of Protected Structures within the vicinity
For change of use of existing commercial unit building to a new use as a place of public worship/religious instruction together with all associated incidental works
To erect safety / security railing and gates to existing forecourt, together with all associated site development works and services
To upgrade existing Cathedral heating system which will provide for a new gas boiler plant room outside existing scout hall, block up existing window and relocate stone plaque to scout hall, together with underground ducting to connect to existing gas supply and existing underground boiler house and all associated site development works and services necessary to facilitate the proposed development. The proposed development is located within the curtilage of the protected structures of St. Peter & Paul Cathedral (RPS No.781) and the Parochial House (RPS No 782)
For the change of use of the car park, granted under An Bord pleanala Reference no PL 03.245734 (Clare County Council Ref. No. P15/80, from a private car park limited to use for matches and authorised events associated with the existing Gaelic Athletic Association ground at Cusack Park (Condition no. 7 of An Bord pleanala Reference no. Pl 03.245734 to a commercial car park for use as a both long term and short term stay for members of the public, at The 'Cloister Site Abbey Street, Ennis, Co Clare. The application includes for the completion of associated site drainage surface dressing, landscaping works and the site entrance, which were previously granted under planning permission, An Bord Pleanala Reference no. PL 03.245734 (Clare Co Council Ref. no. P15/80) The proposed development is within and adjacent to a protected structure E35 and E36 and national monument no. CL033-082034. There are Natura 2000 sites within the vicinity of the development and therefore a habitate directive appropriate assessment screening has been carried out.
The construction of an extension to the rear of the existing community dwelling comprising of an accessible bathroom, ensuite and storage room and the construction of a canopy to the front of the building, the relocation of 2 No. existing parking spaces and all associated site works
For the following development: for the extension of existing public carpark. The proposed development will include: 1) Removal & realignment of existing kerb line for the provision of 62 No. macadam based parking spaces (2.5m x 5m) 2) Provision of road manholes, Gullies, drainage pipework and ancillary site wervices 3) Provision Petrol Interceptor/separator tank. 4) Provision of Signing and road markings. 5) All associatded and ancillary site works. In accordance with the habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening statement has been prepared which concludes that there is no real liklihood of significant effects on the environment arising from the prooposed development
The works will consist of the following: a. Proposed 2 no. sets of bronze plated columbarium units to be fitted into an existing unused space in an internal porch. b. White oak trims to units and white oak veneer mdf panelling to the surround to the Columbarium units. The Franciscan Church is a Protected Structure RPS No. 755.
For development which will consist of the following changes to the retail unit previously granted under Ennis Urban District Planning Ref. 99-32 and An Bord Pleanala Ref. PL 58.120873. 1. Visual enhancement of the external facade to include external glazing, roof cladding and wall fenestrations; 2. Relocation of retail entrance from the southern to the eastern elevation 3. Revised internal configuration including location of toilet and office accommodation; and 4. Provision of external signage on the retail facade
To change the use of an existing office to residential dwelling together with associated alterations and site works
For the following works (A) Change use of existing garage attached to dwelling, to living accommodation, (B) Construct extension to rear and side of the proposed converted garage space and (C) for the use the proposed converted garage space and extended area as a granny flat, all with associated site works
For the development to consist of the Construction of 2 No detached two storey dwelling houses, with site works and connections to services
To a) RETAIN private shed to rear of dwelling house and b) RETAIN extension to dwelling house along with all associated site works and services
To construct an extension to the side and rear of the existing dwelling house, with all associated site works
To extend existing veterinary clinic together with all associated site development works and services
To renovate and change layout of the existing dwelling, demolish existing shed and boiler house attached to the dwelling and to construct a single storey extension to the rear of dwelling, all with all associated site works
For a change of use from existing granny flat (granted planning permission Ref P05/41 old ETC reference) to independent dwelling together with PERMISSION to make some alterations at the rear and side of the existing structure and to construct a boundary wall including all ancillary site services and works
For development at lands at Clonroadmore, South-East of Turnpike Road and North-West of St Flannan's College, Ennis, Co Clare. The development will consist of; The construction of a part two storey, part single storey 100 bed residential community nursing unit (CNU) including; main entrance foyer block; production kitchens; offices; plantroom; courtyard gardens with ancillary support accommodation and an enclosed gated delivery yard incorporating a maintenance building and generator. The development will also consist of the provision of a vehicular, pedestrian and cycle entrance and access road off the Turnpike Road into the site, installation of new services and drainage, provision for roof mounted photo voltaic panels, the provision of a sustainable urban drainage system and new access roads, cycle lane and footpaths with associated hard and soft landscaping, boundary walls and fencing, siteworks, cycle bays and parking for 101 cars (inclusive of EV and Disabled spaces) and set down for an ambulance
To (A) Demolish 3 No. existing derelict dwelling houses, (B) Construct 3 No. 2 bedroom replacement dwelling houses together with all associated site development works and services