For a two-storey detached house, new site entrance, new septic tank connected to existing waste water treatment system and all associated works. A Natura Impact Statement will also be submitted to the Planning Authority
To RETAIN alterations to elevations and roof of existing house together with all associated site works
To remove existing septic tank and install an effluent treatment system and sand filter infiltration area and all associated site works
For Ballina/Killaloe Sports and Community Facilities Development Company (T/A Clarisford Park) in conjunction with Ballina Killaloe Active Retirement Group Ltd. are applying for full planning permission for 1) The construction of a new Petaque (Boules) Arena, c/w boundary fencing, lighting and spectator seating area and 2) The replacement of the existing grass surface on the sand based training pitch with a 4G Astro All Weather Surface. There are no proposed changes to existing flood lighting and fencing arrangements to the existing pitch area. A Natura Impact Statement has been submitted to the Planning Authority with the planning application
To RETAIN private domestic garage at the rear of house and all associated site works
To dismantle storm damaged hay shed and lean-to, demolish 2 No. obsolete farm sheds, construct a farm machinery storage shed and associated site works
For (a) to demolish an existing agricultural shed and (b) to construct a new dwelling house complete with a new entrance, sewage treatment system and ancillary works
To develop swimming platform, yoga deck, outdoor recreation area and changing stalls associated site works. A Natura Impact Statement accompanies this application
To develop a swimming platform, and associated site works. A Natura Impact Statement accompanies this application.
To demolish part of existing stone dwelling and replace with new, construction of new rear extension including new roof throughout and installation of new wastewater treatment system along with all ancillary works
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
Of two dormer windows, septic tank and percolation area, and an incomplete extension. and also PERMISSION for alterations to the extension and completion of the dwelling place and all associated site works
To construct extension and modifications to existing dwelling house along with all associated site works and services
To construct a straw bedded shed with slatted tank and ancillary works
To construct (i) slatted shed over existing slatted tanks with loose area and crush (ii) walled manure area and all associated site works. Demolition of existing shed over slatted tanks required
To construct a storey and half dwelling house, installation of a wastewater treatment system and percolation area, new site entrance and associated site works
To erect a dwellinghouse, garage, entrance and install an effluent treatment system and percolation system and all associated site works
Of the development which consists of: a) Alterations to the internal road layout and b) Existing road entrance and c) A change of layout of camping pods and d) A change of camping pod type, all from that previously granted Planning Permission under Planning Reference No. P.16/114. It is proposed to retain the development for an indefinite period.
To erect a dwellinghouse and install an effluent treatment system and percolation area and all associated site works
To erect a private dwelling house, install an effluent treatment system and percolation area, access road and all associated site works
For the construction of a dwelling house, wastewater treatment system and all associated site works
The development consists of the construction of a slatted unit and associated site works
To erect a private dwelling house, install an effluent treatment system and percolation area, access road and all associated site works. A Natura Impact Statement will be submitted with this application
To erect a dwelling house, install an effluent treatment system and percolation area, access road and all associated site works. A Natura Impact Statement will be submitted with this application
To erect a dwelling house, garage, entrance, install a septic tank and percolation area and carry out associated site works
For development which will consist of a new single storey dwelling house and a new waste water treatment system and a new vehicular and pedestrian entrance onto the public road and all associated site works
Of a) 1st floor conversion dormer windows, rear extensions, alterations and fenestration changes b) detached garage c) installation of new wastewater treatment system and location of soil polishing filter, d) boundaries as constructed together with all ancillary site development works and services
Of a) enlarged dwelling house from what was granted under P05/1935 b) 1st floor attic conversion c) chimney location, installation of roof windows and fenestration changes d) 2no. domestic sheds along with boundaries as constructed together with all ancillary site development works and services
Of changes to dwelling layout and elevations from previously granted permission 08/1292 which includes addition of playroom, utility and WC at the ground floor & additional extra floor area and conservatory to the rear, relocated site entrance, changes to site layout. PERMISSION to construct a single storey extension to the side of the dwelling and all associated site works
To construct agricultural slatted unit plus all ancillary site works
The development consists of the construction of an extension onto existing slatted unit and associated site works
For the construction of a single storey extension to the rear and side of the existing dwelling, together with all associated ancillary and incidental site works
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
To block up existing combined agricultural / residential entrance and replace with a relocated combined agricultural / residential entrance along with all ancillary site works
`for development, the development consists of the construction of agricultural loose house and associated site works
For development which will consist of the construction of a dwelling house, garage a proprietary waste water treatment system and ancillary site works
To RETAIN and complete extension to rear of house and all associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct an extension to the rear of existing dwelling, a porch entrance to the front of existing dwelling, conversion of existing attic area to include dormer windows to front & rear of existing dwelling, detached garage, demolition of existing garden shed, install a waste water treatment system and all associated site works.
Of extension to dwellinghouse, outdoor barbecue/ outdoor dining area, log store, garden shed and hobby shed, home office, side entrance gate and all associated site works all for domestic use
To widen existing forestry access entrance and all associated site works to existing forestry lands
For to erect an extension to the side of house and all associated site works
To construct a dwelling house with attached garage, waste water treatment system with percolation area and associated site works
To retain existing works & Permission for: internal alterations at existing property, The application comprises Retention of the existing 2 storey extension to the rear (previously demolished). Alterations include: minor demolition and rearrangement of the existing internal walls in order that same can be used as a single domestic dwelling house together with a new wastewater treatment facility and percolation area in adjoining lands & all ancillary works
To construct a new slatted house and associated site works
To retain the as constructed covered outdoor dining areas to the side & the rear of existing village shop together with all associated site works
To remove one window from front elevation and replace this window with a door and convert part of existing store room on ground floor to entrance hall to provide separate entrance to existing residential unit on first floor
To construct a slatted cattle shed with cattle handling facilities and associated site works