Construction of a double storey extension to the side of the dwelling. Removal of existing chimney stacks. Internal alterations to the existing dwelling; new side entrance to rear garden on Killarney Road; widening the existing vehicular access onto Glenthorn and all ancillary site works
Alteration to dormer window granted under planning ref no. 22/86 to rear of property including ancillary works
Single storey extension (circa 50sqm) to side/front of existing dwelling, internal & elevational alterations to existing dwelling and upgraded waste-water treatment system to current EPA standards to serve existing dwelling & proposed extension and all associated site works
Retention permission for single-storey extension and conversion of single-storey outbuildings (Garage/Sheds) to habitable accommodation
As constructed house
Attic conversion and construction of a dormer window to rear of property including ancillary works
Provision of a single storey Dublin Bus Drivers welfare facility to incorporate a self-cleansing unisex WC, this facility is approx. 7.13 square metres together with all associated site works adjacent to bus stop 7574
Alterations to roof profile including raising of ridge level and construction of a dormer window to both front and rear of property for the provision of an additional bedroom with en-suite including ancillary works
Permission is sought for the construction
The development of extensions to approved dwelling house and site layout (Planning Register Ref. No. 925/66 refers) and Permission for the development of a new waste water treatment system to current EPA standards and to de-commission existing system on site
Construction of new single story extension to rear and side, enlargement of existing window with added glass balustrade to front elevation including all associated site works to an existing two storey plus dormer semi-detached dwelling
Demolition of 3 no. single storey structures on site including Workshop 1 (296.24 sqm), Workshop 2 (171.05 sqm) the Cow Shed (c.263.77 sqm). All associated works and services provision
Construction of 2000mm high boundary wall to front residential garden and associated site works. Wall to be constructed in solid concrete blockwork with natural stone facing to R755 regional road, inside finished in pointed blockwork, top of wall finished with random natural stone capping.
The repositioning and widening of the existing vehicular entrance to the property along with all site works
Dormer window to the front to facilitate the conversion of the attic to habitable use
Retention of 3 no. single storey film studio workshops (Workshop no 9: c.306sqm; Workshop 10: c.286sqm; Workshop 11: c.248sqm), all similar in scale, design and finishes to other permitted workshops on the property. All associated works and services provision.
Construction of a new, part two storey, part single storey 4 bed dwelling, at Ballybawn Lower, Enniskerry, Co. Wicklow, together with wastewater treatment plant and associated siteworks
For demolition of existing stables, the construction of a stable block and associate works
Extension to side of existing dwelling as built, and permission for a new domestic garage and associate works
Construction of a new single storey pitched roofed extension encompassing new master bedroom area to the northern elevation. A new flat roof entrance foyer with rooflight to the northern elevation and a new flat roofed section to the western elevation connecting the new extension to the existing house. Minor external and internal demolition works of the existing single storey house creating the new openings to facilitate the works above. All ancillary and landscaping works
Construction of 63m2 ground floor living space extension, to east facing elevation of existing dwelling. All together with associated site works, drainage necessary to complete this development
The development comprises Retention of temporary ground investigation works and including temporary hardcore platform and storage on site of excavated material.
The following: • Provision of a drive-thru lane for the Costa Coffee unit, including a canopy and service hatch on the eastern side of the unit, a height restrictor / entrance barrier on the access lane, 3.5m wide drive-thru lane, and associated hard and soft landscaping, resulting in the removal of 7 no. existing car parking spaces; • Provision of associated signage consisting of 3 no. directional signs, 1 no. order station, and 3 no. menu boards / advertisement signs; • Alterations to all elevations of the Costa Coffee unit, including the provision of new signage; • An increase of unit floor area of 4 sq.m; • Associated alterations to the existing car parking, landscaping, outdoor seating area and all associated development
The development will comprise a Residential Development of 44 no. units ranging in height up to 3 storeys and comprising 26 no. houses (13 no. 2-bed and 13 no. 3-bed), 8 no. 1-bed masionettes, and 10 no. duplex apartments (5 no. 1-bed, 4 no. 2-bed and 1 no. 3-bed). The development will include the provision of open spaces, car parking, cycle parking, bin stores, ESB substation, vehicular/pedestrian accesses. All associated site development works, services provision, landscaping and boundary treatments.
Visdon Limited intend to apply for permission for a Large-Scale Residential Development at this site of c.1.35ha at Love Lane (also known as Blind Lane), Upper Dargle Road, Bray, Co. Dublin. The site is located south and west of residential developments at Hazelwood, Ard Chualann and Diamond Valley Apartments, and east of the M11/N11. The proposal will consist of demolition of an existing dwelling, and construction of 108 no. apartments (comprising 32 no. 1-bed, 53 no. 2-bed and 23 no. 3-bed units) within 3 no. blocks, ranging in height up to 6 storeys. - Block 1 will range in height from 4 to 5 storeys and will provide 36 no. apartments. - Block 2 will range in height from 5 to 6 storeys and will provide 44 no. apartments. - Block 3 will range in height from 3 to 5 storeys and will provide 28 no. apartments. All residential units will have associated private balconies/terraces to the north/south/east/west elevations. The development will also include the provision of a creche (c.252sqm gross floor area) located on the ground floor of Block 3; 132 no. car parking spaces, 148 no. cycle parking spaces and 4 no. motorcycle spaces, located at undercroft and surface level. Vehicular/pedestrian/cyclist access will be provided via Love Lane along with a new pedestrian access. The development will also include the provision of an acoustic barrier along the western boundary of the site. All associated site development works, site reprofiling, water services, open spaces, landscaping, SuDs features, boundary treatments, plant areas, waste management areas/bin stores, car/cycle parking areas (including EV parking), and services provision (including ESB substations) will also be provided. The LRD application may also be inspected online at the following website set up by the applicant: www.lovelanelrd.ie.
Attic conversion with hip to gable roof and dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front all with associated ancillary works
Demolition of 7 no. existing workshops and ancillary buildings (totalling c. 1,837 sq.m) and 1 no. existing stage building and 1 no. props building (totalling c. 1,329 sq.m) and construction of a new film studio building comprising 2 no. stage areas (c.2,410 sq.m and c.2,410 sq.m), and support buildings comprising of production offices and general space for costume, props, etc., together with plant room and associated ancillary areas. Total gross floor area of the new film studio building (stage & administrative buildings) is c.7,755 sq.m. The construction of 4 no. workshop buildings (totalling c. 1,133 sq.m). Relocation of existing vehicular (only) entrance along Herbert Road. Permission is also sought for parking within the Ardmore Studios property (including in proximity to Ardmore House (Protected Structure No. B21)). This entails a modification to WCC Reg. Ref. 19/1208 (Condition 12a) to allow use of this temporary parking for the duration of the construction period associated with the current application. All associated site development works, landscaping, boundary treatments, parking and services provision
New dwelling, connection to mains water, effluent disposal system to EPA guidelines 2009 accessed via upgraded existing entrance on to public road to service both this dwelling and existing dwelling and associated site works
3 no. velux roof-lights to the front elevation
Dwelling, waste water treatment system to EPA standards and associated works
A) the removal of container and demolition of existing outbuildings; b) access lane and gate to Kilbride cottage; c) construction of 2no. 2 bed semi-detached townhouses, with ground floor private open space and first floor balcony; d) bike and bin storage; e) boundary treatments and all associated siteworks within a two storey building
The demolition of an existing dwelling, construction of 12 detached dwellings, upgrading of existing entrance to public road, connection to all services and associate works including roads, footpaths, boundaries and boundaries treatments, open spaces and landscaping, attenuation areas
A) the removal of container and demolition of existing outbuildings; b) access lane and gate to Kilbride Cottage; c) construction of 2no. 2 bed duplex apartments, at first and second floor balconies; d) vehicular access from Kilbride Lane with bike and bin storage at ground floor; e) boundary treatments and all associated siteworks within a three storey building
Domestic garage, new domestic wastewater treatment system to current EPA standards, relocation and improvements to existing entrance and associated site works
New dwelling, connection to mains water, effluent disposal system to EPA guidelines, relocation of existing entrance onto public road to service both this dwelling and existing dwelling, upgrade of existing septic tank serving existing dwelling to new domestic waste water treatment system and percolation area to EPA standards 2021 and associated site works
Proposed 56.97sqm extension to existing 53.43 dwelling, and proposed replacement waste water treatment system to EPA standards in lieu of existing septic tank and associated works.
Revision of the boundaries of the original single storey property on the site with the removal of its existing wastewater treatment and to connect the wastewater disposal to the proposed scheme infrastructure. The closure of an existing private domestic dwelling access lane and to propose a new vehicular and pedestrian access point to the existing dwelling via the proposed scheme access roads and footpath, and to incorporate the land space of the existing entrance laneway into the private open space and gardens of the proposed units by means of retaining the existing healthy mature trees and to construct a soft landscaping scheme over the existing hard surfaced laneway, and where possible incorporating all retrievable and healthy native species of mature hedgerows and overgrowth that previously defined the existing laneway boundary. To revise the vehicular access of the existing dwelling to use over the newly proposed scheme roads and footpaths. Ancillary works and appropriate boundary treatments to the existing dwelling. To construct a 4 no. housing scheme consisting of 1 no. single storey and 3 no. detached split level two storey dwellings. Connection to public services and utilities. Ancillary hard and soft landscaping. Ancillary culvert bridge to accommodate transversing the existing watercourse with the scheme road and entrance. Ancillary boundary treatments including the retaining of all mature trees and hedgerows if necessary. Ancillary works
Fingerpost sign
Section 42 extension of appropriate period - 21/451 - (1) a 92.22 m2 dormer extension to the front (western) roof, (2) a new flat roof replacing a pitched roof to the porch and (3) all associated site works
(1) a 92.22 m2 dormer extension to the front (western) roof, (2) a new flat roof replacing a pitched roof to the porch and (3) all associated site works
Modifications to permission WCC reg ref 20/402. Amendments to the sound stage include: subdivision of sound stages from 2 to 3 no. sound stages; additional entrances and exits added to all stages; minor modifications to façade; plant and pv panels added roofs. amendments to the workshops include: subdivision of workshops from 4 to 5 no. workshops; internal toilet block added to workshop no. 4; additional entrances and exits added to workshops; workshop roof height reduced and PV panels and roof lights added. Plant room to the northwest of sound stages increased in size by c.90 sqm and an additional storey added. Amendments to car and truck parking. All associated site development works, landscaping, boundary treatments and services provision
Construction of detached dwelling to side of 74 Killarney Heights, Bray, connection to all services, new entrance to proposed dwelling, new location of entrance to existing dwelling, 2 new car parking spaces for proposed, 2 new car parking spaces for existing dwelling & associated works
Construction of a new single storey extension to the front of existing two storey end of terrace dwelling
Construction of new dwelling, new section of laneway, upgrading of existing entrance, wastewater treatment system and sand polishing filter and associated works
The construction of (1) a first-floor extension to the side, (2) a single-storey extension to the front of the existing dwelling and (3) widening of the existing driveway entrance to an overall width of 3.5metres
Revised house type to that previously approved in application reference 24/60720 at Killough Lower, Kilmacanogue, Co. Wicklow.
Demolition of existing administrative building (c185 sqm) security building (c29 sqm) and workshop (c169 sqm) and construction of a new film studio building comprising a stage area (c2017 sqm) and a 5 storey support building comprising support spaces, stores / props, waiting areas, changing areas, hair / make up, production offices / admin, loading areas, plant, and associated ancillary areas. Total gross floor area of the new film studio building (stage & administrative building) is c 4049 sqm, undercroft car park replacing existing surface car parking along with additional surface car parking and provision of temporary car parking within Ardmore Studios site (for duration of construction period) including in proximity to Ardmore House (Protected Structure No B21). Provision of a new single store security building (c19 sqm) and redesign of main site entrance and internal road layout, along with new footpaths, cycle parking, control points, security gates and deliveries / layby. Relocation of existing pillars from main entrance to the avenue within the Ardmore site. All associated site development works, landscaping, boundary treatments and services provision
Provision of 2No. new single storey extensions with mono pitch roofs, to the front and rear of the existing single storey pitched roof dwelling, along with associated drainage works. Replacement of the existing roof light on the front roof slope of the dwelling with a new roof light design
The provision of a new two storey house and associated effluent treatment system.
Single, three bedroom family home and associated external works and 14.06m2 (gross floor area) single storey extension to the rear of the main house