Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 2 No. social housing units and all associated works. The accommodation shall consist of the following: 1 No. 2 bed and 1 No. 3 bed single storey units
Increasing the height of 'existing' three inherent pillars to 2 metres and increasing the height of the two 'existing' adjoining bay walls to 1.85 metres, on the northern part of the roadside boundary wall adjoining the R772
A one-story extension (Area 42 sq m) 5.2 m high to the north of the existing dwelling, as well as moving one existing window and adding one Velux on the north elevation
Amendments to roof design of previously approved house (Planning Ref No. 21/257) and for the inclusion of 2 No. Velux type windows on side elevation over kitchen area
Alterations and additions to an existing single-storey detached dwelling comprising the construction of a new single-storey dining & family room extension to the front (south east) and side (north east) elevation including modifications to an existing window ope to the front (south east) elevation together with the construction of new replacement splayed site entrance comprising new piers and wall with gates in lieu of the existing site entrance all connecting into existing services and including all associated site works
Detached bungalow with detached garage together with waste water treatment system to current EPA standards, on site bored well, new vehicular entrance onto main road and ancillary works
Erect a 50m2 single storey extension to the rear of the existing dwelling along with all associated site development works
The removal of existing septic tank, new wastewater treatment unit & polishing filter and associate works
Construction of a new educational campus and a new link road that will servce the school campus which will include the provision of two school buildings. Gaelscoil an Imbhir Mhóir a two-storey, 16 classrooms primary school with two special needs rooms and ancillary spaces with total floor of circa 3093sqm serving 480 pupils. Gaelshólaiste na Mara a three-storey, post primary school with two special needs rooms, PE hall and ancillary spaces with a total floor area of circa 6585sqm serving 400 pupils. Proposed site works to include the construction of all new hard play areas, six play-courts, grass pitch, 182 no. car-parking spaces together with boundary treatment, 79 bicycle stands, ancillary infrastructure works, pedestrian links and landscaping.
Erection of a single storey storage building associated with and ancillary to an existing adjoining retail premises
1. change of use of existing commercial premises to machinery hire and sales centre, which will consist of a reception area, office, canteen, toilets along with storage and display area. 2. provision of advertising signage to building and entrance. 3. provision of car parking. 4. provision of outdoor storage area consisting of wash bay, diesel storage and hire equipment and all associated site works and services at existing premises
5 no. office units with a wc in unit 2 and associated site works
Residential development is proposed comprising 98 residential units on this site of 5.14 hectares. The residential mix will be detached, semidetached and terraced houses including 9 no. 2 bed houses; 71 no. 3 bed houses; and 18 no. 4 bed houses. All of the residential units will have associated private open space with gardens facing north/south/east/west. Alterations to Kilbride Road L6179 to provide a section of the regional road and upgrades to provide pedestrian facilities. Access to the site will be from the new proposed regional road. The development will also provide for landscaping, public open spaces and all associated site development works to enable the development including boundary treatments, temporary wastewater treatment plant, pumping station, percolation area, attenuation storage area and other service provision including ESB substation.
• 1 no. ICT facility building with a gross floor area (GFA) of c. 36,655 sq.m and a total parapet height of c.19.5m. • 2 no. ICT facilities each with a GFA of c. 4,428 sq.m and a total parapet height of c. 10.5m. • Each of the ICT facilities will accommodate ICT equipment rooms, external mechanical equipment areas, electrical equipment rooms, network rooms, ancillary office space, storage and loading bays; • The construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 2.7 ha in the east of the site, on ground mounted steel frames, underground cabling and ducting, a new gated internal track for maintenance and all associated site services works; • Relocation of the customer transformer compound permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • The provision of process water and domestic water split tanks, process water and domestic water plantrooms, rainwater harvesting tanks, chlorine dosing kiosk, sprinkler pump rooms, sprinkler tanks, fire hydrant pump room and hydrant tank; • The provision of an internal road network and circulation areas, footpaths, 104 no. car parking spaces and 100 no. cycle parking spaces; • The construction site access arrangements and amendments to the internal road network permitted under WCC Reg. Ref.: 21/1080 as amended by WCC Reg. Ref.: 23/843; • Landscaping and planting, boundary treatments, site lighting, security fencing, all associated site works including underground foul and storm water drainage network, Sustainable Urban Drainage Systems (SuDS) measures, and utility cables, and all ancillary works. The operation of the proposed development will require an EPA Industrial Emissions Directive (IE) Licence. An Environmental Impact Assessment Report (EIAR) has been prepared
The development will consist of the following works: 1. A 2.8sq.m porch extension to main entrance built under the existing slate canopy. 2. Demolition of an existing 13.2sq.m conservatory and replacement with a single storey extension in blockwork with a painted render and slate finish. The new structure will increase the existing conservatory floor area by an additional 7.2sqm. 3. A 158.3sq.m mezzanine extension for office use, constructed above the existing food production area. 4. The total floor area added at all levels will be 168.3sq.m 5. Modifications to existing elevations as necessary to provide windows to new internal spaces and replace existing entrance doors with a window.
Extended living area to previously granted extension (Ref. No. 20/383) and associated works
154 sqm rear and side dormer style extension to 48 sqm dwelling, front dormer window to roof, proposed front porch, replacement wastewater treatment system to EPA standards in lieu of existing septic tank and associated works
Existing commercial parking depot & permission to extend the existing commercial storage facility along with all associated site development works
Proposed development. The proposed development includes an amendment to the development permitted under Reg. Ref. 21/1080, The proposed development will consist of the following to facilitate the above. Demolition of the existing structures on the western part of the site that comprises 4 no. industrial commercial buildings, an associated hut / outbuilding, a gas enclosure, and a tank with bund wall. The removal of the remains of a previously demolished building, areas of hard standing, and existing surface treatments. The relocation of the Energy Centre 1 to the western part of the site, which will supersede the previously permitted 110kV GIS substation compound at that location under ABP Ref: VA27.309252. The proposed development will provide for a revised energy centre design, to include the provision of 8 no. gas turbines (with associated flues of 25.15m in height), 4 no. black start emergency generators and associated transformers, 2 no. single storey fuel oil pump rooms with a gross floor area (GFA) of 90.17sq.m, a single storey air compressor building with a GFA of 88.9sq.m, 4 no. fuel tanks, 2 no. MCC control rooms with a GFA of 44.17sq.m, 3 no. fire water tanks, a single storey welfare, storage, and pump room building with a combined GFA of 160.97 sq.m, a two storey MV /LV building with a GFA of 655.54sq.m, 8 no. 11kV/ 33kV step-up transformers in the north of the site, water treatment equipment, and a security hut, all within a fenced compound. The proposed development includes landscaping and planting, boundary treatments, lighting, security fencing, car parking, and all site works including underground foul and storm water drainage network (including on-site wastewater treatment system), and utility cables, along with all associated and ancillary works. An EPA- Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development
Extend the appropriate period of 16/516 - 60 solar panels on the roof of a grain store
Full ten-year planning permission for development on this site located at Avoca River Park, Arklow, Co. Wicklow. The proposed development is to be located within the townlands of Shelton Abbey and Marsh. The site is bound to the west by the site of a permitted data storage facility development (permitted under Reg. Ref.: 201285), to the north by the access road to Avoca River Park, to the south by undeveloped lands and to the east by undeveloped lands beyond which is the M11 motorway. The proposed development consists of the following: •All site clearance and enabling works required to facilitate the development. •Construction of 2 no. energy centre buildings (Energy Centre 1 and Energy Centre 2) each with a height to parapet level of c. 13.85 metres. •Energy Centre 1 will comprise a gross floor area (GFA) of 5,965 sq.m. within a single storey building and will accommodate 12 no. generators. 4 no. flues 33 metres in height will be accommodated along with south-western elevation of the building. •Energy Centre 2 will comprise a GFA of 9,180 sq.m. within a single storey building and will accommodate 18 no. generators. 6 no. flues 33 metres in height will be accommodated along the south-western elevation of the building. •Construction of a battery compound to provide electricity storage and backup power, located to the northeast of Energy Centre 2, to comprise 27 no. battery arrays within a compound area of c. 0.7 hectares. A single storey MV switch-room building (c. 181 sq.m. GFA) will be provided to the west of the battery compound. •Provision of a transformer compound (to the northwest of Energy Centre 1), along with a welfare building (c.38 sq.m. GFA).•Provision of fuel storage tanks (2 no.) within a bunded compound to the north of Energy Centre 2.•Construction of a new access from the existing estate access road to the north of the site, internal road network and circulation areas, footpaths, provision of 6 no. car parking spaces and 4 no. cycle parking spaces. •Landscaping and planting, boundary treatments, lighting, security fencing and all associated ancillary and site works including underground foul and storm water drainage network (including on-site wastewater treatment system) and utility cables
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
The installation of underground electrical infrastructure between the existing Arklow Gas-insulated Switchgear (GIS) 220kV Substation and the permitted Pollahoney GIS Substation. This will include the installation of approximately two underground electricity cable circuits, each at 3.12km in length and associated underground ducting, horizontal directional drilling, joint bays, communication cabling infrastructure between the existing Arklow GIS 220kV Substation and the permitted Pollahoney GIS substation, (WCC reg ref 20/1285). All associate and ancillary site development, remedial and construction works will be concentrated along the public road network, i.e. R772, L2180, L6179-0 and L-61791-0 to facilitate the underground cabling infrastructure within the townlands of Killinskyduff, Tiknock, Kilbride and Shelton Abbey. The application will include an Environmental Impact Assessment Screening Report (EIA)
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
The installation of solar panels over the roof of an existing telecommunications cabin on a steel frame (covering an area of c.46 sq.m., to a maximum height of 4.6 metres above ground level). Works to consist of all ancillary development works, including steel uprights at
New vehicular entrance onto R772/Old N11 and all associated site works
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Increased ridge height and first floor habitable floor area along with minor alterations and revisions to the elevations and internal layout of the existing dwelling originally approved under P.R.R. 07/1500 along with retention permission for the domestic garage & site development works including the retaining wall & concrete yard
(1) revised dwelling position, (2) revised well and septic tank position and (3) revised entrance position. Permission is sought to revise site boundaries as a change to that permitted under 014626 and all associated site and ancillary works
(1) Retention permission of existing garage, plant rooms and first floor pigeon loft. (2) Retention of part built single story vintage car storage building and Permission to complete same with a flat green roof. (3) All associated site works
Erection of a front porch, replace existing flat roof on rear of existing dwelling with pitched roof married into existing pitched roof by raising the height of the existing pitched roof by 800mm, to remove existing chimneys, install a solar panel on the new south facing roof, and to replace existing flat roof on existing shed/domestic garage to rear of existing dwelling with a pitched roof, together with all associated site works
Minor alterations to previously granted house type under planning permission file ref 21/1210 - all other aspects of the previously granted permission remain unchanged i.e. garage, a new secondary treatment system and percolation area to current EPA guidelines, a new vehicular entrance off public road, well and all associated site works
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works.
New dwelling, new garage, well, a proposed secondary treatment system to current EPA guidelines with percolation area, a new entrance off public road and all associated site works
Extension of appropriate period Section 42 on PRR 20/946 Park & Ride
The installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing Shelton Abbey Open Prison, together with ducting, underground electrical cabling, and all associated site works The proposed development is considered to be within the curtilage of a protected structure (RPS No. 40-05) listed under the current Wicklow County Development Plan 2022-2028. The proposed solar array installation will have no impact on the protected structure, located over 330.00 meters away from the proposed site.
Detached storage shed no. 1 (388.50m2), detached tool / battery shed no. 2 (38.9m2), 2 no. sprinkler tanks and pump house (13.95m2) located north of building no. 1. Retention sought for detached storage shed no. 3 (224.60m2) located north of building no. 2 and all associated works
Single storey extension to building no. 1 (728 m2) and 2 no. battery storage kiosks and 2 no. invertors to northern façade of building no. 1, removal of ground mounted solar panels and construction of detached single storey building (120m2) to the south of building no. 1. single storey extension to building no. 2 of (152 m2) and all associated site development works
Extend the appropriate period of a permission (ABP PL27.244465 & WCC PRR 14/1234) Park and Ride facility, construction of 170 space car park with turning access lane, internal bus pickup area, bicycle storage, revised road markings including extension of existing bicycle lane to site, footpaths, fencing, landscaping including screening and fencing, public lighting, drainage and ancillary works)
As constructed weighbridge office extension, PRR 20/1282 and all associated site works
An amendment to Block 1 permitted under PPR 19/54 consisting of a single storey extension (281sqm) and all associated site works
45 sq.m. single storey domestic garage and 1.8m high boundary gate/barrier and associated works
45 sqm single storey domestic garage and 1.8m high boundary gate / barrier and associated works
Demolish existing single storey extension (13.72 sqm) to rear of dwelling, construct new single storey extension (60 sqm) to rear and side of existing dwelling, provide new rooflights to rear of existing dwelling and all above with associated site works
(i) first floor extension to existing single storey weighbridge office (ii) above ground fire water storage tank to serve this building and development permitted under PPR 19/54 (iii) omission of office building permitted under PPR 19/54 and all associated site works
Installation of ESB Networks' compact modular MV EGIP substation to facilitate the connection of the consented Templerainey East Solar Farm (planning ref: 16/1285) to the electrical distribution system
Single storey dwelling and domestic garage with a waste water treatment unit and percolation area to current EPA specifications, plus bored well, together with all associated site works
A 12.3 square metre plant room, a 30.0 square metre shed as built, also retention for change of use from attic to 33.7 square metre storage area in attic of house, retention of rooflights, and retention for minor elevation changes to door and windows to house and garage from previous planning permission (952472) and all associated siteworks