To construct a new dwelling house, entrance, private garage, wastewater treatment system and all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To construct a new dwelling house, private garage, site entrance, wastewater treatment system, bored well and all associated site works
To revise the location of the proposed dwelling house and make elevational changes to the house previously authorised under planning permission Ref. No. 24/60014 along with all associated site works
To construct a new dwelling house, on-site wastewater treatment system and all associated site works and services
To construct a new dwelling house, site entrance, access road, private on-site wastewater treatment system, private bored well and all associated site works and services
For a conservatory and elevation changes to a domestic garage, all as constructed
The development will consist of a new dwelling house, shed, site entrance, wastewater treatment system and associated site works
Of the conversion of an existing detached garage to use as a granny flat, including the construction of a link area between the dwelling and the granny flat area, and the construction of a shed with covered area attached to the rear of the dwelling, all with associated site works
Permission consequent on the grant of outline permission (Ref: 21/1394) for the construction of a Dwelling House and Garage, new Site Entrance, Waste Water Treatment System, a bored well and ancillary works
For a Dwelling House and garage, new site entrance, connect to proprietary waste water treatment system, a bored well and carry out all ancillary site works
Of the following a) the additional rooflights, roof and wall finishes b) the site entrance and front boundary along with associated site works.
To demolish extension to rear and porch to front of existing dweling, renovate and change the layout of dwelling, and to construct extension to the dwelling, and to construct extension to the dwelling, all with associated site works
To construct an entrance dwellinghouse, garage, wastewater treatment system and soil polishing filter together with all ancillary site development works and services
Of an extension to the existing dwelling house.
For development, the development will consist of a part material change of use from a farm store, currently used as a farm store to a light engineering workshop and associated site works
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To alter the design of the dwelling house permitted in P19/319. Alterations include new front, rear side elevations, new internal layout an alteration to ridge level
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct a dwelling house, detached domestic garage, vehicular entrance, effluent treatment system including all associated site works and services (Note-the site is located adjacent to a National Archaeological Monument CLO-17-233) this planning application submission is sought in order to revise the layout of a previous permitted development (planning reference 19/220) to facilitate insertion of a buffer zone between the monument and the proposed development
For the demolition of existing substandard dwelling and out-buildings and for permission of the construction of a replacement single storey dwellinghouse with attached garage and proprietary waste treatment plant and upgraded vehicular entrance including ancillary site works
For the construction of a slatted unit and loose shed with associated site works
For the construction of a dwelling house garage, a proprietary waste water treatment system and ancillary site works
To construct a dwelling house and garage, with effluent treatment system, and new entrance from public road, with all associated site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To Extend the Appropriate Period of Planning Permission for P17/185 to construct dwellinghouse, garage, treatment system and carry out ancillary site works
To erect a 20m high lattice tower carrying antennas and dishes together with associated telecommunications equipment all enclosed in security fencing and to remove the existing 12m high lattice tower
For development, the development consist of the construction of a dairy with waste water treatment system with percolation area and associated site works
To RETAIN a dwelling, garage and wastewater treatment system
Of additional windows to the Front, Rear and South facing sides of dwelling, RETENTION of the replacement of the garage door with a window and door to the front of the dwelling, RETENTION of changes to the plaster design finish, RETENTION of the reduced ridge height and RETENTION of the removal of the roof window to the front of the dwelling
For proposed change of use and extension of existing garage to residential unit, connection to existing waste water treatment system on site, and associated site works
For the construction of an extension to existing Dwelling House to comprise of Livingroom, utility room, Bedroom with walk in wardrobe also PERMISSION for conversion of existing bedroom to En-suite including ancillary site works
For development, the development consists of the construction of a slatted cubicle unit and associated site works
For renovation and extension of existing private dwelling house to include demolition of existing sunroom, construct new two storey side extension and single storey rear extension and all associated site works
For a) PERMISSION to alter boundaries b) PERMISSION to upgrade existing septic tank and soakpit to an advanced wastewater treatment system and soil polishing filter in existing site c) OUTLINE PLANNING PERMISSION to construct an entrance, dwelling house, garage, wastewater treatment system and soil polishing filter together with all associated site development works and services
For the construction of a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct a new dwelling house, private garage, site entrance, bored well and wastewater treatment system along with all associated site works
For alterations to an existing dwelling to provide a ground floor disabled accessible bedroom, wardrobe and ensuite bathroom, provision of a new ground floor single-storey living room extension, demolition of an existing sun room and associated site works
For construction of extensions to rear of dwelling, porches to sides of dwelling and a detached shed to rear of dwelling, all with associated site works
For construction of a dwelling house, garage, wastewater treatment system and new entrance including ancillary site works
To construct a dwelling house, garage and a waste water treatment system and percolation area
To construct dwelling house, garage, treatment system and carry out ancillary site works
Planning ref: P22/72 for the construction of a new two-storey 4 bedroom detached dwelling house with new garage, water treatment system, vehicular access, and the carrying out of all other ancillary works on site.
To construct a single dwelling house, advanced wastewater treatment system along with ancillary site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
To build a new dwelling and install a waste water treatment system & all other associated site and ancillary works
Of the existing entrance and driveway to dwellinghouse
For (a) modifications to an existing dwelling (b) a single storey extension to the existing dwelling (c) a new wastewater treatment system and all ancillary site works
For the redevelopment of an existing office building for the purpose and provision of an Enterprise and Innovation facility. The proposed development will include: 1. Change of the use of the building from that permitted under P98-1093 (Light industrial purposes or similar and a call centre) to an Enterprise and Innovation Centre, 2. Erect an entrance canopy and covered walkway to the east of the building and cycle parking with a canopy to the north, 3. Carry out changes to the elevations by the addition of double doors to the east and north elevations and windows to the west and north elevations, 4. Erect Branding signage on the south, west and north elevations and, 5. All ancillary Site and Building works including EV charging points, PV panels to the roof and Patio Area. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
For the following proposed development: a. to demolish existing single storey rear annex and utility sheds b. alteration and refurbishment of existing dwelling house c. construct both 2 storey and part single storey rear extensions d. construct detached remote home office and gym including utility storage shed e. construct new on-site wastewater treatment system f. adjust existing vehicular site entrances g. including all associated siteworks and services etc