Retention of part dining bay and part plant room extensions (Retention Area 3.5m2 combined), upper glazed window sections and sliding door configuration to dining bay, slate wall cladding to East, West and Southern facades and 2 no. chimney stacks of an existing farmhouse, 2 no. rooflights. Permission for construction of a rear extension and courtyard area to the rear of an existing farmhouse, a shed and all associated site worksDecision record indexed
Construction of a new dwelling and detached garage, treatment system, domestic entrance and all associated site works.Extension of Duration of Permission granted under Planning Reference:15/0404Decision record indexed
Permission for (a) retention and upgrade of fire fighting lagoon, proposed works to include surface water soak pits (b) retention and upgrade of wastewater treatment system along with all associated site development works to serve the production facility/ farm.Decision record indexed
(A) Retention and permission to complete increase in floor area of side projection of dwelling (Northeast Elevation) including change of design of roof profile over same to dwelling currently under construction and which was granted permission under Pl. Reg. 18/557 (B) Permission for retention of revised site layout (Minor House position alteration) (C) Permission sought to alter size of living room windows on rear elevation (Northwest)Decision record indexed
Permission for Retention of dwellinghouse and relocation of vehicular entrance and associated siteworks from those permitted under planning register no. 05/8335 and Permission for Retention of shed structure.Decision record indexed
(a) Permission for retention and completion of reconstruction and change of use to commercial storage of previous agricultural buildings adjacent to the production facility at Glenilen Farm. (b) For retention of adjacent plant room, store and milk silo. (c) Permission is also sought for change of use of existing slatted house to plant room. (d) Permission for demolition of existing milk processing facility. (e) Permission for ESB substation building along with all associated site development worksDecision record indexed
Construct a pony stable building consisting of 2 no. pony stables and a tack room, install a soiled waste water storage tank, construct a dung stead and all associated site worksDecision record indexed
Dereenacreenig West Wind Farm Ltd., Dreenacreenig West, Drimoleague, Co. Cork
Permission for a windfarm development at this site within the townland of Derrenacrinnig West. The proposed Grid Connection traverses the townlands of Derreenacrinnig West, Barnagowlane West, Glanareagh, Gortnacowly, Ards Beg, Ardrah, Laharanshermeen, Maulraha, Maulikeeve, Derryarkane, Cappanaboul, Skahanagh, Gortroe, Shandrum Beg, Shandrum More, Dromloughlin, Ballylickey, Crossoge. Temporary works will be required to accommodate the delivery of the turbine components. These temporary works are included as part of this application and are located in the townlands of Castledonovan, Derreenacrinnig East, and Derreenacrinnig West. The development will consist of: Construction of 3 no. wind turbines with an overall ground to blade tip height of 119.3m with a rotor diameter of 82m and a hub height of 78.3m. Construction of 1 no. permanent 20 kV Electrical Substation, all associated electrical plant and equipment, all associated underground cabling, and all ancillary structures and works. Construction of one Temporary Construction Compound with associated temporary site offices, parking areas and security fencing. Upgrade and reuse of existing hardstands. Upgrade and reuse of existing internal site access roads. Provision of Biodiversity Enhancement Area. All associated underground electrical and communications cabling connecting the wind turbines to the wind farm Electrical Substation. Construction of approximately 10.75 km of 20kV overhead line (OHL) Grid Connection, the OHL to be constructed consists of c. 157 wood poles (ranging from 9m to 15m above ground) supporting electrical conductor lines and ancillary structures and equipment. Installation of approximately 3.3km of underground cable ducting Grid Connection and associated electrical cabling, and all other ancillary works including joint bays, culverts, marker posts and all associated developments. Construction Haul Route works along the L-8767, L-4711 and L-8765. A 10 year permission and a 40 year operational period from the date of overall commissioning of the entire wind farm is being sought. However, part of the substation and all of the Grid Connection will be owned and operated by ESB networks and as part of the national grid infrastructure, their life can extend beyond the life of the windfarm. Accordingly, permission is sought for the Grid Connection and substation in perpetuity. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). This planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. apply. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted with the application. The planning application and EIAR may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, Norton House, Cork Road, Skibbereen, Co. Cork. P81AT28 during its public opening hours, I.e. 9.00am to 4.00 p.m. Monday to Friday (excluding public holidays). A submission or observation in relation to the application and EIAR may be made in writing to the Planning Authority on payment of the prescribed fee, €20, within the period of 5 weeks, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.Decision record indexed
Retention of dwelling as constructed (change of plan and layout from that permitted under Planning Ref. Nos. 05/7993 & 11/00598) and all associated site worksDecision record indexed
Permission for construction of 10 no. 2-storey semi-detached dwelling houses and all associated landscaping, new site entrance and roadways, lighting and associated site worksGrounds not yet categorised
No. 1. Cubicle House consisting of 2 underground tanks, No. 2. A Farm Machinery Shed, No. 3. A New store entrance wall and all associated site worksDecision record indexed
Proposed demolitions, renovations and extensions to an existing derelict farmhouse, the provision of a septic tank, percolation area and all associated site worksDecision record indexed
Change of use of part existing detached building from teaching/therapy rooms, office, to habitable use, as an extension to the adjoining apartment and also for change of site boundary of previous planning reference 06/95Decision record indexed
Permission for: (i) retention of geodesic dome structure for private use, ancillary to dwelling, (ii) retention of pergola structure and (iii) permission for construction of small detached building for private art studio.Decision record indexed
Permission for the construction of a bungalow dwelling with garage, effluent treatment system and together with site access & all associated site works.Decision record indexed
Permission to demolish bike store. Permission is also sought to construct classroom, assisted users WC, office and make minor alterations to existing school and associated site worksDecision record indexed
Carbery Food Ingredients Ltd. T/A Carbery Group facility Dromidiclogh West Ballineen, Co. Cork
The construction of a new single storey electrical switch gear building with all associated ancillary services and site works. The sole use of the new building will be to contain electrical switch gear equipment and it will be located at the Carbery Food Ingredients Ltd. T/A Carbery Group facility in Dromidiclogh West, Ballineen, Co. Cork. The total area of the new building will be 53 m2. The proposed development is required to facilitate the upgrade of a transformer at the facility. This application relates to a facility which comprises of an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency Act, 1992 (as amended) is required. This application also relates to an establishment to which the Major Accidents Directive applies. A Natura Impact Statement is not required for this proposed development.Decision record indexed
The development on a site area of c.2.7 hectares within the existing area authorised for extraction and concrete manufacturing under permission ref. no's W/323/91 and W/01/5878 will comprise: i) Retention and continuance of importation of aggregates for the manufacture of concrete products; ii)Retention and removal of the existing concrete truck washout facility and water recycling tanks in the north-eastern area of the site; iii) Retention and continuance of operational landscaping and ancillary site works; iv) Variation of condition 12 of permission ref. no. W/323/91 to allow for the use of imported aggregates in the existing concrete plant; v)Provision of a new concrete truck washout facility and water recycling tanks at a lower level on the site; vi) Provision of noise reduction fencing (up to 5 metres in height) along the south-western boundary; vii) Provision of additional screening berm (up to 4 metres in height) on the eastern side of the access road; vii) Provision for out of hours operation of the concrete plant on a maximum of 20 occasions each year; ix) Phased restoration and final restoration of the site; For a period of 11 years (including 1 year for final restoration).Grounds not yet categorised
Permission to change plans and location of dwelling from those granted in planning ref. no. 22/496 and all associated site worksDecision record indexed
The development consists of a lateral extension of c.4 hectares to the existing quarry area, permitted under Plan File Ref. no. 02/5740, to give an overall extraction footprint of c.10.9 hectares; deepening of the extraction area by a further 20 metre bench from the current permitted floor level of 148m AOD to a final depth of c. 128 m AOD; an overburden storage area and quarry stockpile storage area; restoration of the site to natural habitat after - uses; all related ancillary site works within an overall application area of 26.5 hectares, and all for a period of 35 years. The application is accompanied by an Environmental Impact Assessment Report (EIAR).Decision record indexed
Permission for Retention of detached garage and Retention of alterations and extension to dwelling to include; carport / store room extension to rear of dwelling, front porch, alterations to dwelling approve under planning ref. 11/568 including removal of conservatory extension on southeast gable AND for Permission for Erection of extension on northwest gable of dwelling and associated site development worksDecision record indexed
The development will consist of the erection and operation of an asphalt plant (Stack height 20 meters) within an overall application area of 0.15 ha. at the existing quarry landholding.Decision record indexed
Permission for the following works to part of former supermarket: (i) subdivision of overall building to provide a bakery with retail area to ground floor and ancillary storage area to first floor, (ii) removal of flat-roof annex to rear and construction of new external walls to provide open yard space to rear, (iii) installation of electrical service cabinet and access door to front / street elevation, and (iv) all associated worksDecision record indexed
Planning permission for the construction of a dwelling with associated site work, previously granted under planning reference 16/403Decision record indexed
South Lake Road Cappanclare Inchigeela Macroom, Co. Cork
Extension of Duration to Construction of a dwelling with associated site works, previously granted planning permission under planning reference 08/1485 and 14/147 now lapsed. Extension of duration of permission granted under planning reference: 16/00403.Grounds not yet categorised
Permission for change of use of part of ground floor of former supermarket building to a two bed apartment including the following: (i) retention of demolition of rear annex and construction of new rear wall, (ii) permission for fenestration changes to front/street elevation including installation of new external door and windows, (iii) all associated worksDecision record indexed
Permission for the acceptance, storage and crushing of waste concrete from the applicant and other external sources for recycling and re-use consisting of storage and crushing of the concrete. The crushed materials will be utilised in the production of new concrete products. Proposed works include new concrete slab, petroleum/oil interceptor and percolation area. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application.Decision record indexed
Eir Exchange New Road Baurnahulla Drimoleague, Co. Cork
Replace an existing 10m high telecommunications wooden pole with a 15m high telecommunications monopole together with antennas, dishes and associated telecommunications equipmentGrounds not yet categorised
Erect a 21m monopole telecommunications support structure together with antennas, dishes and associated equipment and remove the existing 10m telecommunications pole with associated antennaGrounds not yet categorised
Erect a 20m lattice telecommunications support structure together with antennas dishes and associated equipment and to remove the existing 10m telecommunications pole with associated antennaGrounds not yet categorised
Construct an extension to existing dwelling house to be used as a separate dwelling unit, installation of a septic tank and percolation area to serve existing dwelling house, existing granny flat and proposed extension, and carry out all associated site worksDecision record indexed