(Ref No. P19/202 of Outline Permission) to construct a private dwelling house, garage, wastewater treatment system and ancillary site works
To construct a private dwelling house, garage, wastewater treatment system and ancillary site works at the above address.
For development, the development consists of the construction of a slatted unit and associated site works
For an entrance, single storey dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works
Development of Public Footway, Pedestrian Crossing, Street Lighting, Line marking, Signage, Drainage works and all other associated site works
Of additional windows to the Front, Rear and South facing sides of dwelling, RETENTION of the replacement of the garage door with a window and door to the front of the dwelling, RETENTION of changes to the plaster design finish, RETENTION of the reduced ridge height and RETENTION of the removal of the roof window to the front of the dwelling
The development will consist of construction of one dwelling house with garage, proprietary wastewater treatment system, with al associated works and connections to services, and new entrance from public road
To construct a dwelling house, garage, entrance, driveway, wastewater treatment system, bored well and all associated site works
To construct a dwelling house and garage, with effluent treatment system, accessed by means of an existing entrance to the family home, and all associated site works
For the construction of a dwelling house and garage with new vehicular entrance and driveway, a treatment unit and percolation area, bored well and all associated ancillary site works
To restore existing cottage, construct new addition to side of existing cottage, convert 2 No. Sheds to studio spaces, install a proprietary wastewater treatment system with percolation area and all associated site works
Of the replacement sunroom, new external doors & windows, plaster finish to front porch, rear, elevation and first floor dormers, removal of chimney and the internal re-configuration of the dwelling house as part of the overall energy efficient upgrading measures undertaken including all site services and ancillary site works
The development will consist of construction of a new dwelling house, modifications to existing cottage to provide ancillary accommodation with a new shared wastewater treatment plant, with all associated works and connections to services
The development will consist of the removal of the existing conservatory and replacement with a new orangery. In addition a new free standing glass house is proposed. All associated site works and services included with application
For development which will consist of alterations and an extension to the existing dwelling house including all ancillary site works
To construct a dwelling house and detached garage including all site services and ancillary site works
For development at Ballymaley, Ennis, Co Clare. The proposed development will consist of 24 No. 4 bedroom detached houses, comprising 19 No. 2 storey houses with second floor dormer rooms (Type A) 2 No. 2 storey houses (Type B), 3 No. 2 storey houses, Type B1, new site entrances, roads, paths, driveways, boundary walls, pedestrian walkway, landscaping, drainage with attenuation tank and associated site works. A Natura Impact Statement will be submitted with the application
For an amendment to planning permission reference P21-664 at Ballymaley, Ennis, Co Clare, to provide a total of 20 detached, two-storey houses with dormer style second floor level. The proposed amendment will include changes to the design and location of the 15 houses granted under planning permission reference P21/664, and the provision of an additional 5 houses, revisions to drainage, attenuation tanks, roads, path, boundary walls, landscape and associated site works. A revised Natura Impact Statement will be submitted with the application
To amend house types previously granted under P23-271 & P21- 664 together with all associated site development works and services
To construct 1 no. Dwelling House, connect to new proprietary Waste Water Treatment System, connect to public services and to public water supply and carry out all ancillary site works
For an extension to and the change of use of an existing outbuilding to short-term tourist accommodation, connection to existing Wastewater treatment system together with all associated site works
Of the conversion and change of use of previous outbuildings to short-term tourist accommodation together with all associated site works
To construct a dwelling house and garage with effluent treatment system, new entrance from public road, and all associated site works
The development which will consist of a new entrance to existing residence to replace the existing entrance gate, a proposed two metre high stone wall to the property boundary with piers and iron gates, and a new access driveway to connect with the existing avenue, and associated site works
For the construction of a new two storey dwelling house, detached domestic garage, wastewater treatment system and percolation area, upgrading of existing site entrance and all ancillary site works
For the installation of a modular home to be used as ancillary living accommodation with connection to existing wastewater treatment system including ancillary site works
Of elevational changes and internal and external modifications to dwelling as built including ancillary site works
For the construction of a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct a dwellinghouse with covered deck, covered storage space, connect to public sewer and water, develop entrance to public road and carry out ancillary site works
For development which will consist of; A new dwelling house, new garage, new site entrance and wastewater treatment system, including all ancillary site works above and below ground.
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For development, the development will consist of a new dwelling house, new garage, new site entrance and wastewater site works and below ground
To (a) construct a new single storey extension to the front of the existing building, (b) modifications to the existing building, (c) construct a new detached boat shed, (d) modifications to the existing site entrance, (e) demolition of an existing shed and all associated site works
To construct dwelling house, garage, treatment system and carry out ancillary site works
Planning ref: P22/72 for the construction of a new two-storey 4 bedroom detached dwelling house with new garage, water treatment system, vehicular access, and the carrying out of all other ancillary works on site.
To construct 55 No. dwellinghouses consisting of 8 No. 4 bedroom detached two storey houses, 8No. 4 bedroom semi-detached two storey houses, 5.No 3 bedroom detached 2 storey houses, 26 No. 3 bedroom semi-detached 2 storey houses, 8 No. 3 bedroom detached bungalows, car parking, vehicular & pedestrian access including roads, footpaths, cycle paths, public lighting, landscaping and construction of bat house together with all site development works and connections to public services. The application is accompanied by an NIS (Natura Impact Statement)
To renovate and change the layout of the existing dwelling and to construct a single storey extension to the rear and side of the dwelling, all with associated site works
For the construction of a new slatted shed with calf creep area as well as all associated site works and ancillary services
To construct a 30m high, free standing lattice type communications structure to accommodate antennae and communication dishes to be shared with third part operators ESB's Ennis 110kV substation
To RETAIN garden shed and treatment system serving existing dwelling house as constructed
To retain private garage and store building on southern side of dwelling house along with all associated site works
For development which will consist of the construction of a dwelling house, garage a proprietary waste water treatment system and ancillary site works
To convert an existing gym to three additional family guest rooms, provide additional storage area, erect 2 no. Glamping Pods at the rear of the site together with connection to existing services, RETAIN an existing storage shed and include all associated site works
For development which will consist of the extension of the caretaker/owner’s apartment to include an additional en-suite bedroom at first-floor level. The development will also include the conversion of the existing semi-basement storage area to two guest bedrooms and a games room; the conversion of the ground floor games room to a guest bedroom; conversion of attic space to four ensuite guest bedrooms; and the conversion of the existing garage to night porter accommodation. Permission is also sought for a side staircase extension, two external guest rooms in the side garden, extension of the existing car park, modifications for ramped access, elevational change and all associated site works. A Natura Impact Assessment has been prepared as part of the application
For the restoration and renovation of the existing Land Steward's Cottage and stone outbuildings for residential purposes; (Protected Structure RPS: No 661); wastewater treatment and percolation area, bored well, connections to services and ancillary site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For the construction of a shed attached to the side of the existing dwelling house and a detached shed to rear of existing dwelling house, all with associated site works
To construct a dwelling house and garage, with effluent treatment system, and new entrance from public road, with all associated site works
To construct a new dwelling house, private garage, site entrance, and on-site wastewater treatment system along with all other associated site works and services
For the following development: a) demolition of the existing 2 storey dwelling; b) construction of a replacement 2 storey dwelling; c) provision of a new private well and private onsite wastewater treatment system and all associated site works and services