1) demolition of existing derelict house and walls, 2) the construction of 9 houses comprising, one semi detached two-storey four-bedroom house, one semi-detached two-storey three-bedroom house, one terraced three-storey four-bedroom house with covered parking, four terraced three-storey four-bedroom houses with integral garage, one two-storey four-bedroom semi detached house with integral garage and one semi detached three-bedroom house with covered parking and 3) alterations to vehicle entrance and internal access road, 4) connection to public sewer and 5) all associated site works
First floor bedroom / bathroom / ensuite extension, two no velux windows, connection to all existing services
Permission for a rear extension to main dwelling house along with internal alterations and modifications which include for the insertion of sliding door/window to the west elevation. Retention permission is required for a gym and shower room in the existing detached garage building
Provision of a new two-storey, two-bedroom house to the front and side of the existing house. And the alteration of the existing front boundary wall to provide two vehicular entrances, one to serve the existing house and one to serve the proposed house
Replacement of the existing telephone kiosk with a new telephone kiosk with integral communication unit and 1.53 sqm digital advertising display. The proposed structure has an overall height of 2.43m, a depth of 0.762m and a width of 1.096m
1) retention of a lean-to frame structure sheeted with Perspex panels that encloses a previous un-roofed enclosed walled yard (54sqm) in the north-western part of the property; 2) retention of a wooden walled (with external plastic sheeting) and doorway un-roofed waste-recycling storage enclosure structure, attached to the front elevation of the single storey section of the property; and 3) permission for demolition of existing lean-to roof frame structure sheeted with Perspex panels & enclosed walled yard and construction of a replacement fully serviced single storey extension (54sqm) connected to the customer accommodation of the existing licenced property. Together with all associated site development works
The development will consist of a single-storey flat roof extension to the existing kitchen/living/dining area to the rear (circa 5.2 sq m) with new wood burning stove and chimney stack, and a new two-storey extension with pitched roof and roof light to the side of the existing house set back from the front and rear facades accommodating an office at ground floor and ensuite and changing room at first floor (total circa 16.4 sq m), together with all associated site works
Partial demolition of existing single storey extension to rear and construction of a new single storey extension to rear
6 sqm of demolition to existing ground floor rear (south) and side elevation (eastern) walls. The construction of 16 sqm single storey extension to aground floor and conversion of 12 sqm at attic / second floor of existing dwelling to habitable space including provision for dormer window facing south. The design includes associated internal modifications, modifications to existing elevations, a proposed velux rooflight to northern slope of existing pitched roof and proposed first floor roof canopy to proposed single storey extension, hard and soft landscaping, and all associated site development works above and below ground
Industrial unit extension of 202m2 with demolition of 7m2 boiler house and associated site works
Proposed single storey extension to rear and side of existing dwelling
The change of use of the unit from light industrial to warehouse with trade counters for the sale of building related products principally to trade. Works to the premises include: South elevation: removal of roller shutter and inclusion of a new point of entry to the trade counters. Installation of a new operator sign above the new trade counter entry with downlighter. Marking out parking at the front of the building. East elevation: installation of new double door and a single operator sign. North Elevation: area for wall mounted mechanical plant. Internally: removal of an internal mezzanine and installation of trade counter area. All other ancillary works associated with the proposed development
Construction of new first floor extension over existing ground floor extension to the rear of dwelling
1. attic conversion (38m2) and the construction of 2no. dormer windows; one to the rear and one to the front. The dormers will be clad in zinc metal or similar. 2. The changing of the hipped tiled roof to have a full gable on the south side; and that this new raised gable will have a new 1.2m X 1m window. 3. The alteration and increase in area of the existing ground floor rear extension by 8m2, this involves extending the rear building line, 0.65m full width to the rear, and the construction of a new pitched roof to rear extension
Permission is sought for the construction
(1) The provision of a new first floor and pitched roof. (2) The provision of a new front porch. (3) The provision of a new covered outdoor space to the side of the existing house. (4) Associated alterations to all elevations including the provision of external wall insulation. (5) The provision of a new wastewater treatment system with sand polishing filter.
(1) The provision of a new first floor and pitched roof. (2) The provision of a new front porch. (3) The provision of a new covered outdoor space to the side of the existing house. (4) Associated alterations to all elevations including the provision of external wall insulation. (5) The provision of a new wastewater treatment system with sand polishing filter.
(1) The provision of a new first floor and pitched roof; (2) The provision of a new single storey extension to the rear of the existing house; (3) The provision of a new front porch; (4) The provision of a new covered outdoor space to the side of the existing house; (5) Associated alterations to all elevations; (6) The provision of a new wastewater treatment system with sand polishing filter.
Section 254 for a free standing advertising structure
First floor extension with ancillary works built circa 1990 at the side of existing house
(A) retention of development consisting of: (i) ground floor kitchen extension to the rear (6m²) along with a ground floor kitchen window on the rear west elevation, (ii) first floor bedroom extension to rear (10m²); (iii) conversion of garage to bedroom (13m²) including replacement of the garage doors with a window to the front elevation. (B) Permission for development consisting of (i) adjustment to first floor windows on the rear south elevation, (ii) adjustment to kitchen window on the rear west elevation
Alteration of existing roof profile and the construction of a new gable wall over the existing wall to the side elevation of the property and the construction of new dormer roof space to the rear of the property with total second floor area of 31 sq.m. Also the addition of two roof light windows to the front of the property with all associated work
Detached two storey dwelling house to the side of existing house on site, alteration of the existing garden wall, shared vehicular access and general site development works
Revised house design to previously granted detached two storey dwelling house to the side of existing house on site, alteration of the existing garden wall, shared vehicular access and general site development works previous planning ref 20/76 the new design will include a bedroom at second floor level
Erect a pitched roof construction to match the existing pitched roof over an existing section of flat roof construction which forms part of the existing dwelling along with all associated site works
Removal of the existing hipped roof to the side of the existing two storey semi-detached dwelling and replacing it with a new gable end wall and roof to facilitate a new attic conversion with two new velux windows to the rear, new window to the side elevation at attic level and to include any ancillary works
For change of house type from two storey to single storey with changes to site layout plan consisting of change of vehicular entrance with associated works previously granted under planning register number 20/1311.
New wastewater treatment unit and soil polishing filter to EPA 2021 Standards, removal of of existing septic tank and associate works.
Vehicular entrance with car parking to front with connection to all services and associated site works
A free standing advertisement structure
The erection of a fully serviced dwelling house with associated site works adjoining existing dwelling house
Proposed first floor extension to rear of dwelling and re-establishment of two windows to the upper gable wall of existing dwelling and associated works
1. Demolish existing conservatory to the rear of existing house and construct new single storey extension. 2. Re-build existing garden walls to rear garden to extent of new extension and patio area. 3. Construct new detached single storey home gym and garden store building to rear garden for ancillary use of the home. 4. All above with associated site works
For scaffolding
A single story rear extension including alterations to rear elevation and associated site works
The refurbishment, extension and alteration to the dwelling house and the provision of a new wastewater treatment system and associated site works
The installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electrical connection on land within the car park
Vehicular access and car parking with associated site works to front
(S254) for a scaffold
1) the erection of 132 no. (252m2) solar photovoltaic panels on the roof of the existing building 2) the erection of signage to the north-western corner of the site, comprising a 1200mm wide and 2400mm high metal framed totem pole with aluminium panels and LED illumination 3) the erection of signage on the front (west) elevation comprising 10mm foamex raised lettering " Chadwicks lets get it done"(9677mm wide and 4000mm high) and "building/plumbing/hire/diy" ( 12050mm wide and 650mm high) and 4) the erection of signage on the side (north) elevation comprising 10mm foamex raised lettering "Chadwicks lets get it done" (5270mm wide and 2180mm high) and "building/plumbing/hire/diy" (10668mm wide and 652mm high) and all other associated site development works above and below ground
Single storey extension to rear from ground floor level over lower ground floor level with connection to all services and associated site works
Two storey dwelling house, associated site works and services
Single storey extension to rear from ground floor level over lower ground floor level with connection to all services and associated site works
Alterations to existing roof profile to include a gable side dormer roof window and an attic conversion to non-habitable attic room and velux window to the rear
Attic conversion, inclusive of 5 no. roof lights and the creation of habitable space with the attic space
1) purposed new shopfront to include new stone cladding in selected colour new framed entrance and exit doors 2 no box bay windows & lowered cills of existing ground floor windows 2) interior fit-out and all ancillary site works
Proposed Two Storey 4 Bed Dwelling comprising of 149.7sqm. Connection to all public services, together with all associated works to facilitate the above
Change of use of the existing 169sqm ground floor retail unit to a doctor's surgery for associated signage treatment to the existing front façade and all associated site works
Section 42 on PRR 18/1114 ( (i) the erection of 4 No 10 meter high lighting poles with flood lighting, (ii) the erection of 2 No 10 meter high by 20m long ball stop netting barriers, (iii) associated site works including excavation
Section 254 Licence - scaffolding