The construction of a new two storey extension (65.1m²) and refurbishment to existing derelict, roadside cottage (50.7m²), refurbishment of existing outbuilding 7.7m², installation of new septic tank WWTS, construction of a new vehicular entrance and all associated site works
As constructed dwelling and garage
(a) the refurbishment & minor alterations to the existing derelict cottage & outbuilding (b) a single storey extension to the rear of the existing cottage; (c) the construction of a new vehicular entrance; (d) the installation of a new wastewater treatment system and percolation area; (e) all associated site and landscaping works to serve the development
Change of use applies to the ground floor front room and associated stores which were formerly a shop and post office and will change to residential use; the extension is for a single storey kitchen and dining room all to the rear; the alterations include; the addition of a flat roof dormer and rooflight to the existing rear lean-to at first floor level to provide a bedroom with adequate head-room; replacement of non-original front doors and windows (the historic sash windows will be repaired); repair and alteration of the existing single-storey flat-roofed store at the side; internal alterations and repair of the protected structure; alterations of the boundary walls to improve the safety of the existing vehicle egress; the resulting house will be a part-single storey, part-two-storey four bedroom house
Construction of a domestic garage to the rear of the existing dwelling
Subdivision of existing site (overall site area.6168 ha app.) with new site boundaries (site A.3682 ha, site B.2486 ha); subdivision of existing residential unit into two separate residential units; Retention for sunroom/lounge to rear of existing dwelling; Retention for gable extension to existing dwelling on south end (ground floor and attic space); Single storey extension to side and rear of existing dwelling (west side) with an area of 92sq.m; Internal modifications to existing dwelling; Provision of extended parking area to front of dwelling; Upgrade of existing septic tank and percolation area to full waste water treatment system and new percolation area (site A); Provision of new waste water treatment system and new percolation area (site B); Entrance area modifications to include new gates, piers, low boundary walls etc; Retention of 'Velux' roof lights to front of existing dwelling and all associated site works.
43sqm single storey and part 2 extension to the side and rear of the house to accommodate independent living and a safe environment for a child with intellectual and physical disabilities. This will include a disabled bathroom, bedroom and treatment room. Widening of existing internal doors to accommodate wheelchair access throughout, a new wastewater treatment plant and retention permission for ground floor extensions to west and south sides of the house and conversion of attic rooms to habitable space with rooflights to front and rear.
Permission for the construction of a single storey extension to the south side of the house, internal alteration, waste water treatment unit and all ancillary works. Retention permission is sought for a ground floor extension to the west side of the house, 1.5 storey extension to the south side of the house, attic rooms over the original house and approved extension to the north and roof windows to the front and rear.
Structural steel shed and all associated site works. The shed is required for dry storage purposes, e.g. jeep and trailers. The proposed shed will have a floor area of 33.75 sq.m
Single storey flat roofed extension to the north elevation of an existing dwelling and retention of a window inserted into the western elevation. This extension will primarily consist of the provision of a new utility room for the house, located behind an existing permitted screen wall and other associated minor alterations, all finishes to match existing.
Detached single storey domestic garage incorporating a home office & garden shed and for all associated site works
Single storey dwelling with an onsite treatment plant and soil polishing filter along with upgrading existing entrance and all associated site works
Demolition of the existing prefabricated extension structure and dilapidated extension and the construction of a new single storey 87sqm extension to the existing cottage with new pitched and flat roofs, raising of the existing cottage roof and walls, internal alterations, associated site works, services and landscape.
Retention permission for the continuance of use of existing storage building for civil engineering materials and existing steel gated recessed entrance. Permission for new entrance doorway on the side (southeast) elevation serving the internal office, staff canteen, & meeting room with the installation of new windows and fire exit door to the rear (southwest) elevation; installation of proprietary wastewater treatment system and percolation area; staff car parking with one electric car charging point and covered bicycle parking and all associated site works.
Planning permission for dormer type dwelling, on-site effluent disposal system to current EPA guidelines, domestic outbuilding, recessed entrance and all associated site works
Alterations to existing façade including new windows to the gables, enlarging existing opes, rooflights to the rear, removal of existing chimney and new rendered external insulation throughout and all associated site works. RETENTION is also sought for changed roof profile and height permissible under previous planning permission ref 85/1138
Change of use of existing detached single storey domestic garage (with home office and garden shed previously granted under PPRR 20/834) to independent family living accommodation and associated site works
Construction of a single storey dwelling with onsite waste water treatment system to current EPA guidelines, detached domestic garage, entrance to be shared with existing recessed entrance granted under PPRR 08/29, and all associated site works
Removal of existing single storey brick extension and for the construction for a new single storey extension to front of existing dwelling and for the renovation of the existing granite house which is a protected structure along with the insertion of new window opes to the rear elevation and for the upgrading of existing septic tank to a treatment plant with soil polishing filter and all associate site works
1.renovation of existing cottage 2. placing of new slate roof to cottage with 3 velux roof windows in rear south roof elevation 3. window and external door alterations to front and side of cottage, 4. for demolition of shed and outbuildings to east of cottage, 4. for construction of a new linked single storey extension to side of existing cottage, 5. for installation of a new mechanical waste water treatment system on site and percolation area, 6. for all associated site development works
Extensions to side and rear of dwelling; detached double garage; storage shed; new recessed entrance and upgraded wastewater treatment system.
Planning permission to upgrade existing vehicular access by setting it back from the public road and creating a splayed entrance with a gate and fence; aswell as retention permission for the laying of a driveway and permeable hardstanding.
Construct a single storey structure with an 'A' type roof to house a domestic family gym with a hot tub and shower rooms; all ancillary ground works in connection with the above. The proposed new structure will sit on top of an existing blockwork structure (Type A) with a flat concrete roof; roof level is at the yard level of the house and general yard, as described in the Grant of Permission for Retention recently issued under Planning Reference SD21A/0093.
Blockwork structure (Type A) with a flat concrete roof; roof level is at the yard level of the house and general yard with access to store via a ramp down to a lower level; the floor area is 67.92sq.m; a second blockwork structure with a pitched tiled roof (Type B) adjacent and right angles to Type A with entrance also from the lower yard level; the structure had been used to accommodate ponies and now to be used for the storage of domestic items; the floor area is 30.73sq.m.
Removal of existing modular dwelling and construction of 3 bedroom dormer bungalow, with associated vehicular access, wastewater treatment system with percolation area.
Removal of existing modular dwelling and construction of 2 bedroom bungalow, with associated vehicular access, wastewater treatment system with percolation area.
A single storey garden room; area 65sqm; to the rear (north)of an existing detached dwelling. The structure is to be used as a home office and fitness rooms only in conjunction with the principal dwelling
1.) A rear extension to an existing cottage completed in July 2010. At ground floor level this consists of a kitchen & dining room, utility room, wc and connecting stairs. At first floor level this consists of a bedroom, connecting stairs and roof lights with an area of 84 sq m and 2.) A large shed to the rear of the property completed in March 2017 for storage with an area of 81.6 sq m with all associated site works.
Construction of new side and rear extensions, alterations to existing elevations, extension of property curtilage, construction of domestic ancillary art/craft studio, installation of a new wastewater treatment system & percolation area and all associated site works.
1) Refurbishment of existing single storey roadside cottage, including replacement of existing asbestos containing roof with new slate roof, construction of a new porched entrance, window replacement, provision of a new WC and shower room, and internal refurbishments; 2) Demolition of existing part-fallen rear return to the existing roadside stone shed building, and construction of new single storey multipurpose outbuilding (work from home office/gym/art studio), with rooflight, to adjoin the existing shed. 3) Minor stonework repair works to the roadside shed building, and replacement of the existing corrugated metal roof with a new slate roof. 4) Replacement of the existing foul treatment and percolation system to serve the house and outbuidlings, 5) Ancillary site works, including cutting hedgerow back at the entrance, landscaping, and connection to the existing drainage systems
Split storey dwelling over two levels with domestic garage with effluent treatment system & percolation area with vehicular entrance and all associated site works.
Single storey dwelling with small mezzanine space, septic thank & percolation area to current EPA guidelines, recessed entrance and all associated site works
Installation of additional underground effluent storage and treatment tanks, all associated pipework, plant and equipment, construction of a new plant and storage building, new soil polishing filter together with all associated site development works
Construction of cattle shed, dung stead, underground effluent storage tank, concrete yard, cattle crush, farm access road and all other associated site development works.
(A) Construction of a one and a half storey and part single storey type house, (B) Garage/store for domestic use with 2 no stables and tackroom, (C) The installation of an Oakstown BAF wastewater treatment plant with percolation area and (D) New vehicular entrance and driveway off the shared access laneway and all associated site works
Single-storey extension to the side and front, 2-storey extension to the front, new dormer window to the front, two dormer windows to the rear roof area, three velux windows to the front roof, canopy area to the side and rear, single-storey shed to the rear, relocating front vehicle access
Construction of a single storey extension to rear and sides of existing cottage, including the provision of attic accommodation, dormer structure/window and velux window to proposed west wing of extension and is to include all ancillary site development and landscaping work
(A) New roof over fire damaged house (B) Modifications to windows to front and rear elevations (C) Living room extension to side of existing house (D) All associated site development works
Single storey dwelling house, onsite secondary sewerage treatment system, domestic garage, alterations to existing entrance and all ancillary site works
Renovation and extension of existing one and two storey farmhouse and barn (ground floor 109 sqm / first floor 23 sqm) to include rear ground floor (21.7 sqm) and first floor (60.6 sqm) extensions, giving the house a total gross floor area of 215.2 sqm, general renovation including restoration of stonework, insulation, windows and roof and associated landscaping and site works, including the relocation of the existing site entrance and the installation of a new wastewater treatment system and percolation area
The development will consist of retention permission for 4 no windows in the existing gable walls at existing converted attic floor level.
Construction of a single storey slipped roof design bungalow. A septic tank discharging to a subsurface trench percolation area. Upgraded existing entrance to a domestic vehicular and business entrance. A bored well. The commencement of a canine accommodation business. The construction of eighteen kennel cubicles which could accommodate up to eighteen dogs and which will be used as part of this new business. The provision of canine wastewater storage facilities (which will accommodate wastewater prior to being transported off-site by a licensed contractor. All associated site works.
A single storey slipped roof design bungalow. A septic tank discharging to a subsurface trench percolation area. Upgraded existing entrance to a domestic vehicular entrance to the requirements of The Roads Department of South Dublin County Council. A bored well. All ancillary groundworks associated with the above.
(A) A horse isolation unit consisting of 3 enclosed stables, tack room, staff toilet facilities, with loft feedstore on first floor and a dormer type grooms accommodation, (B) installation of Oakstown BAF wastewater treatment system and percolation area, (C) an American barn type structure with 10 stables, feed store, tack room and staff toilet facilities and (D) construction of recessed vehicular entrance and all associated site works.
A horse isolation unit consisting of 5 enclosed stable cubicles, tack room, toilet, canteen, with loft feedstore on first floor and a dwelling unit containing two bedrooms, sitting room, kitchen/ dining area, bathroom, boot room and farm office; Installation of Oakstown BAF wastewater treatment system and percolation area; An American barn structure with 14 stables, feed store, tack room and kitchen and toilet; Construction of recessed vehicular entrance; Closure of existing agricultural access; All associated site works.
See site notice for full development description. Retention for 1. ESB substation and 2 no. agricultural storage and maintenance buildings 2. one mixed use for use for storage, maintenance, workshop, educational and recreational use 3. 'Pavilion' Wooden clad communal canteen/dining building and commercial kitchen. 4. Reconstruction, alterations and extension to 'Belfry' building incorporating reception, meeting room, offices, toilets, canteen, kitchen and staff facilities 5. Reconstruction, repurpose and extension of previously derelict 'long barn' to comprise 27 no bedroom units 6. Retention and completion of 1 no. two storey accommodation building to provide 51 no bedrooms together with unfinished attached self contained residential unit 7. hard standing, roads, access, carparking, set down, and recreational areas to provide play areas and outdoor seating etc. PERMISSION FOR RETENTION ON A TEMPORARY BASIS for 1. security kiosk, controlled barrier and gate lodge 2. Conversion and use of part of a mixed use admin/educational building to provide emergency residential accommodation for displaced persons
Demolition of existing carport and shed at rear with a single story pitched roof replacement structure proposed in the same location. Proposed extension to include a balcony area to the rear, southwestern side, accessible from existing raised rear garden level. Associated internal modifications and site works.
Construction of bungalow, garage, on-site treatment unit, new entrance, well and all associated site works
A development consisting of the construction of a Proposed Agricultural Storage Shed, total area 70m², includes 6 no. Roof-lights and shall include all associated site works.
Retention permission sought for the construction of entrance gates, walls, pillars and a brick structure located inside the entrance gates plus the laying of hardstanding over grassland and to retain the use of the site for storage of mobile homes and motor vehicles and all associated site works