For alterations and demolition works to the existing Community Hall, the construction of a sports hall and arts centre and ancillary buildings along with all associated site works
To erect a dwelling house and garage, entrance, driveway, install an effluent treatment system and percolation area and connect to mains water and all associated site works
Of the following development to the existing building which is a protected structure (RPS No. 130); (a)Retain change of use of the building from church / school to a single private residential unit; and (b) PERMISSION to replace the existing roof covering with natural slate, re-render the exterior of the building with lime render, provide three no. new conservation roof windows to the rear of the roof and all associated ancillary site works
To erect a private dwellinghouse, garage, install an effluent treatment system and percolation area and all associated site works
To construct a dwelling house and garage with effluent treatment system, new entrance from public road, and all associated site works
To erect a dwelling house, shed, entrance, install an effluent treatment system and percolation area and all associated site works
Of shed to side of existing house
For the demolition of the existing hay shed and proposed erection of a fully serviced dwelling house including all associated site works
To erect an extension to existing dwelling house, install an effluent system and percolation area and all associated site works
The development will consist of 11 no. dwelling houses of varying size and design, 1 no. building containing 2 no. apartments, new site entrance, development access roads paths, landscaping, service connections and associated site works & services
For a) change of use from a holiday home to a residential house and b) permission for RETENTION of attic storage area and rooflights to rear of same
For to erect a dwelling house, garage, install an effluent treatment system and percolation area and carry out associated site works
For as constructed detached agricultural storage building, farm entrance and access roadway together with all associated ancillary and incidental site works
For the construction of an extension to existing dwelling house to comprise of Livingroom/TV room and for PERMISSION to construct two bedroom granny flat to rear of dwelling including ancillary site works
To construct a single storey domestic dwelling house with incorporated roof lights, integrated lower-level domestic garage including new waste water treatment system with percolation area, domestic well, and all ancillary site works and services
To erect a dwelling house, entrance, driveway, install an effluent treatment system and soil polishing filter and all associated site works
For detached two storey dwelling, detached domestic garage, onsite wastewater treatment system and percolation area, connection to necessary services, new entrance together with all associated ancillary and incidental site works
Of existing house / garage / site boundaries as constructed and decommission existing septic tank and install new waste water treatment unit / percolation area along with all associated site works
To construct a dwelling house, entrance, waste water treatment system and percolation and associated siteworks
For the construction of a detached single storey dwelling, access from shared entrance, onsite wastewater treatment system, bored well, together with all associated ancillary and incidental site works
The development will consist of 3 no. tourist rental cabins upgrade vehicular access entrance and associated site works and services
To construct a dwelling house, garage, sewage treatment system, new entrance onto public road and associated site works
To erect three no. dwelling houses, garages, entrances, access road, install effluent treatment systems and percolation areas for each house and all associated site works
Of a 65 meter long boundary fence, a step back from the main road, planting and ancillary works
For the Change of Use from residential to recreational camping site and the construction of six no. cabins for the purpose of short stay accommodation, a gravel access path a waste water treatment system, preparation of a Natura Impact Statement and ancillary works for site. A Natura Impact statement will be submitted to the planning authority with the application
For the change of use from residential to recreational camping site and the construction of six No. cabins for the purpose of short stay accommodation, a gravel access path, 7 car parking spaces a waste water treatment system, preparation of an Natura Impact Statement and ancillary works
To construct cubicles shed with slatted tank and all associated site works
For a garage containing two car spaces, a water pump and ancillary works
The development consists of 1. The demolition of an existing structure. 2. Construction of replacement dwelling, wastewater treatment unit, polishing filter and ancillary site works
To Extend the Appropriate Period of Planning for P17/685 Part demolition, modification and renovation of an existing dwellinghouse, conversion of existing stable buildings to residential use including two extensions, Replace the existing metal roof on the Coach House with a traditional slate roof. Upgrading of existing entrance road and Main entrance on the R463 public road. Upgrading of existing Wastewater treatment system with installation of a new P6 Advanced Aeration waste water treatment unit and pumped dripfeed infiltration system, to cater for 4 bedroom accommodation capacity. The Buildings are within the curtilage of a protected structure. Repairs and maintenance works to existing stone bridge and open drains and culverts within the curtilage of the dwelling and all associated site works
For part demolition, modification and renovation of an existing dwelling house, conversion of existing stable buildings to residential use including two extensions. Replace the existing metal roof on the coach house with a traditional slate roof. Upgrade of existing entrance road and main entrance on the R463 public road. Upgrading of the existing wastewater treatment system with installation of a new P6 Advanced Aeration waste water treatment unit and pumped drip feed infiltration system, to cater for 4-bedroom accommodation capacity. The buildings are within the curtilage of a protected structure. Repairs and maintenance works to existing stone bridge and open drains and culverts within the curtilage of the dwelling and all associated site works.
To construct a dwellinghouse and associated site works including entrance and septic tank treatment system
For to erect a garage / storage shed on site and all associated site works
To construct a five bay double Loose cattle shed with manure pit and seepage tank
For development consists of the construction of a slatted unit replacing existing slurry pit and asociated site works
To construct a six bay slatted cattle shed
Of a shed, entrance gate, and extension to the rear of the dwelling house, and changes to a garage (previously granted planning under P02-492 & P06/87)
To construct a ground floor extension to the front of the existing dwelling house, with all associated site works
For the demolition of side & rear extensions to existing dwelling house including adjacent garage building and the construction of new side and rear extensions, external landscaping, boundary wall treatments & all ancillary site works
Of an equipment storage shed originally erected in 1986
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For development which will consist of the construction of a stable building with dung, hay, and equipment storage, a soiled water storage tank and percolation area, and adjacent parking spaces. Access to the stable building will be via a new on-site road from the present residential gate
For development which will consist of a new dwelling house, site entrance, wastewater treatment system and associated site works
To construct a dwelling house and garage with effluent treatment system, entrance from public road and all associated site works
To erect a dwellinghouse, entrance, driveway, install an effluent treatment system and all associated site works and all associated site works
To construct a single dwelling house, advanced wastewater treatment system along with ancillary site works
To construct a dwelling house, garage, new entrance, waste water treatment system and all associated site works
To remove an existing shed and to construct a dwelling house and garage with effluent treatment system, new entrance from public road, and all associated site works
To construct a new independent two storey dwelling with basement including a new effluent treatment system and subsequent demolition of an existing dwelling including all associated site works
For development which will consist of the construction of a slatted unit and associated site works