To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
For the construction of a single storey extension to dwelling consisting of a family independent living unit, connection to existing waste water treatment system and all ancillary site works
Of a garden fuel storage shed, an extension of an existing garden shed and a garden hut temporary structure in the rear garden of the house
For revision of dwelling house design as granted previously under planning reference P22/622
The development will consist of construction of one dwelling house with garage, proprietary waste water treatment system, with all associated works and connections to services, with RETENTION of front boundary wall and use of existing entrance from public road
To Extend the Appropriate Period of Planning Permission for P16-575 to construct a dwelling house, entrance, wastewater treatment system and all ancillary site works
For construction of an extension to side and rear of existing factory unit to be used as raw materials and finished product storage and PERMISSION to upgrade the facade of the existing building and install new signage including ancillary site works
To apply for a 10 year planning Permission for development which will consist of the phased demolition of all existing buildings, structures and infrastructure on, in, over and under the site of the existing Roche pharmaceutical plant at Clarehill td, Clarecastle, County Clare, including the existing wastewater treatment plant (WWTP) and all associated ancillary infrastructure, with the exception of the ESB compound on Clarehill, the cottage to the north of the site which fronts onto Patrick Street, existing hedgerows and tree cover, all tie in points to utilities and to discharge points at the site boundary, and site boundary fencing. The existing security hut at the main entrance to the site from Clarehill, the existing internal road network, and existing site utilities; including storm water network, water supply network, fire watermain, fire pump house and electrical transformers, will remain for the duration of the proposed development, to be removed upon completion of the proposed development. The phased demolition will require a fenced demolition contractor's compound, to include offices, welfare facilities, material storage areas, bunded storage, and all associated ancillary structures. The demolition contractor's compound will be accessed via the existing entrance from Clarehill, to include a wheelwash and weighbridge. The proposed development will also consist of the phased remediation of three Areas of Environmental Concern (AECs) within the site boundary namely AEC1, the main processing area; AEC2 in the vicinity of the WWTP and the landfill area. The phased remediation will include bulk excavation within temporary negative pressure enclosures, including decontamination units, backfilling of excavated areas, the use of vapour and groundwater extraction wells, and a modular vacuum plant. The proposed development will also include a fenced remediation contractor's compound, contractor's car park, and a container storage area. The remediation contractor's compound will be accessed via the existing access to the south of Clarehill, with new temporary security hut, wheelwash and weighbridge. The proposed development will also generally consist of: stockpiling areas within the site; the construction of internal temporary fencing; silt fencing, temporary extension to the existing stormwater drainage, water supply and firewater supply systems; existing medium voltage supply at 10kV; Please view Newspaper or Site Notice for the remainder of description
For development consisting of the construction of a domestic garage and associated site works
To erect a modular office building to facilitate workers during the site decommissioning and to carry out all associated ancillary works. This application refers to an Establishment which holds an Integrated Pollution Control Licence and to which the European Communities (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2006 applies
For development which will consist of the construction of dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For development which will consist of a variation to the garage location previously granted under planning Ref. P20-31
The development will consist of an extension to an existing stable / garage and to change the use to a home office
For the improvement works to Killoo Graveyard to comprise of, (a) construct new gravelled pedestrian walkway adjacent to south wall of existing entrance, (b) construct new gated entrance to west wall of graveyard, (c) provide three new agricultural gates, (d) construct new wrought iron fencing to north side of both existing entrance and proposed new pedestrian access, (e) to construct pedestrian access turnstiles at existing entranceway and self-closing gates at new pedestrian access (f) to create new legal right-of way over proposed new pedestrian access and extinguish existing right-of-way through centre of field including ancillary siteworks
To construct a single storey extension to the side of the existing dwelling house, including site services and all ancillary site works
For the construction of a new metal fence on top of part of the existing stone boundary wall along the Smithstown Road combined height of wall and fence will be 2.45m high, the construction of a 2.45m high metal fence within the site behind the stone wall adjacent to the site entrance, the construction of a new 2.45m high paladin fence along the west boundary from the Smithstown Road boundary wall to the existing site security fence, and associated site works
For alterations and extensions to the existing dwelling house including all ancillary site works
The development will consist of the construction of 22no. new car parking spaces with E-Chargers, and associated site works
For proposed development which will consist of the construction of a light industrial manufacturing facility with ancillary office space measuring circa 3,630m² comprising, A. a naturally lit high-bay workspace and a two-storey annex comprising administration and office spaces, sanitary and staff welfare facilities, B. The provision of external public lighting, a standalone ESB substation and switch room building, an enclosed external building services enclosure and an enclosed waste storage compound, C. Two new site entrances from the perimeter public roadways; a HGV entrance from the north off Smithstown Road to a dedicated goods yard and a second entrance from the east for all other vehicles, D. Parking for 76 cars, of which 17 are EV Charging spaces and 4 are Universal Access spaces, 38 bicycles under a covered shelter and a vehicular set-down zone, E. New ground level corporate signage to be placed at the south-west side of the adjacent roundabout on the Smithstown Road, F. Roof and ground mounted photovoltaic panels, building signage, ancillary soft and hard landscaping and all associated site works and services. The planning application is accompanied by a Natura Impact Statement
The development will consist of the construction of an ESB MV sub-station building together with ancillary site development works
To RETAIN detached private garage to side of dwelling house along with associated site works and services
To extend the appropriate Period of Planning Permission P10-595 for development of a four storey office building with a total gross floor area of 7438 sq metres including ESB sub-station and a Plant room at sub terrain level, and associated site works. The development includes roof mounted solar panels and plant areas at roof level, screened by a louvred enclosure. The site works include the provision of 195 car parking spaces and 137 bicycle spaces in a high quality landscape and amenity setting, a new entrance from the existing road off Smithstown roundabout, an extension of the existing roadway to form a second car park entrance/exit, a site perimeter stone clad wall, and a waste management enclosure of approximately 25 sq metres located within a service area. This application is seeking a 10 year planning permission
Of (a) stairs, 1st floor offices, stores, toilets and fenestration changes (b) change use of ground floor from indoor soft play centre including coffee bar and diner granted under P06/1224 to retail / showroom with offices, toilets and warehousing/storage to the rear together with all associated site development works
To construct a new agricultural entrance onto the public road including site works
For the construction of a new dwelling house and garage complete with a new entrance, wastewater treatment system and ancillary works.
To RETAIN a new entrance, construction of a stoned entrance and the alteration of land levels
To construct a storage yard at Smithstown, Shannon, Co Clare. The purpose of the yard is to provide for material such as gravel and also to provide a display area for Walling and Patio materials
Of opening an entrance and hanging a farm gate
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
Of (a) a detached domestic garage to the rear of the property, (b) a timber clad shed to the rear of the property (c) conversion of the existing attached garage to habitable accommodation, and (d) a single-storey conservatory extension to the rear of the dwelling, together with all associated site works and services
To construct a new warehouse building which will house mixed use industrial units with office accommodation for industrial light industrial, storage, warehouse and logistic usage including ancillary site works and a stormwater attenuation tank
Of a domestic garage and retention of alterations to existing dwelling house's front elevation and roof.
For the construction of a dwelling house, garage, wastewater treatment system and new entrance including ancillary site works
For development of a bulk milk silo with associated ancillary site works
To build an extension to the rear of the existing dwelling house and all associated site and ancillary works
For the construction of a commercial unit to comprise of a retail area, storage area, offices, toilets with connection to public services. We also intend to apply for car parking, vehicular access and a 2.4metre high security fence to sides and rear of proposed unit, including ancillary site works
(Phase 2 south-east and north-east of development applied for under planning Ref. P21-372). For development which will consist of (a) the construction of 51 no. two storey dwelling houses, (b) 4 no. 2 storey dwelling houses with optional additional attic space accommodation (c) two storey Childcare facility building (d) all ancillary site works (e) connection to previously applied for roads, paths and services - Planning Ref. P21-372. A Natura Impact Statement (NIS) has been prepared and accompanies this application
For the construction of a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
For development which will consist of (a) the construction of 13 no. two storey dwelling houses, (b) 15 no. two storey dwelling houses with optional additional attic bedroom accommodation. Total no. of 28 houses (c) all ancillary site works (d) connection to previously applied for roads, paths and services- Planning Ref. P21-372 and Planning Ref. P21-1397. A Natura Impact Statement (NIS) has been prepared and accompanies this application
For development which will consist of alterations, rear extension and change of use of existing domestic garage to a granny flat accommodation, along with ancillary works
For change of planning of an existing ground floor vacant office space to gymnasium and health centre
For development, which will consist of (a) the construction of 34 no. two storey dwelling houses, 6 no. 2 storey dwelling houses with optional additional attic space accommodation and 8 no. single storey dwelling houses (b) all ancillary site works and connection to public services. A Natura Impact Statement (NIS) has been prepared and accompanies this application
For change of use of an existing commercial building and yard to a commercial vehicle/container parking depot, maintenance repair workshop, incorporation of a wash bay and Class 1 interceptor and installation of full retention interceptor for parking yard along with all necessary ancillary works
For development which will consist of (a) the construction of two no. single storey dwelling houses to replace two no 2 storey dwelling houses on sites 21 and 22 (b) Minor adjustment to adjacent open space (c) services connections and site works, all to that previously granted under Planning Ref. 24-60182
For the construction of a new slatted shed with calf creep area as well as all associated site works and ancillary services
For development consisting of the construction of an extension to the front of existing dwelling house and associated site works.
To construct a detached garage to side of existing dwelling house, with all associated site works
Of garage and car port attached to the rear of the dwelling house and RETENTION of an additional chimney
For development of a scheme of 14 no. 2-storey dwellings and all ancillary works including an estate road, foul sewer (with pumping station) and other connections to public services. A Natura Impact Statement (NIS) has been prepared and accompanies this application
To construct a new site entrance to the previously permitted NCT centre under Planning Application Reference No. P20/700