Change of roof profile from hip end profile to full gable end profile to accommodate attic conversion with dormer extension to rear. All associated site works.
Tá cead pleanála á lorg ag Coláiste Cols Life do chomharta saorsheasaimh ag an mbealach isteach chuig Coláiste Cois Life, Gleann an Ghrifín, Co Atha Cliath. Permission sought for a free standing sign at entrance to Coláiste Cois Life, Griffeen Glen Lucan Co Dublin
Two-storey commercial building providing two new units and ancillary accommodation (1,574sq.m gross floor area); Unit 1 will be used as a shop (1,057sq.m), Unit 2 will be used for professional services or health centre or office or gymnasium ( 517sq.m); the development will also consist of roof plant and PV panels; Lucan advertising signage (50sq.m) and other indicative illuminated signage zones; extended service yard and new access gates; new pedestrian linkage to adjoining Somerton site; reconfigured customer car park and new vehicle charging infrastructure; standalone substation/switch room (30sq.m); hard and soft landscaping, and pedestrian canopy; connection to services; all associated site and development works.
The installation of 3 roof top support platform poles to support telecommunications equipment including panal antennas, RRU's and transmission dishes together with associated exchange cabinets and all associated development there to provide mobile electronic communications services.
Single storey 23sq.m extension to the rear and side of the existing residential dwelling to extend the existing kitchen/dining area and to provide a new office space and wc. To the front elevation, alterations will consist of a single storey extension to meet the property boundary, with a zinc clad parapet roof.; drainage alterations and associated ground works; brick boundary wall to northern boundary.
Installation of 3 pole/ballast structures on the rooftop carrying telecommunications equipment including antennas, RRUs and a dish, together with associated exchange cabinets and all associated site development works; the development will provide for wireless data and broadband services.
Amendments to the permitted development as approved by South Dublin County Council under Register Reference SDZ20A/0020 to provide for the replacement of 50 no. permitted 2 storey, 3 bedroom dwellings with 50 no. 2 storey, 4 bedroom dwellings with attic and dormer window on front elevation. The overall road layout and services will remain as per the approved parent permission. The proposed amendments will not result in any change to the total number of units to be provided on site.
Demolition of 3 existing dwelling houses in addition to 9 farm structures and outbuildings and the construction of 113 residential units comprising 70 two storey dwelling houses (comprising 61 three bed units and 9 four bed units ranging in size from 109sq.m to 148sq.m); 30 duplex units (comprising 16 two bed units and 14 three bed units ranging in size from 94sq.m to 110sq.m) and 13 apartments (comprising 8 one bed units and 5 two bed units ranging in size from 50sq.m to 73sq.m); duplexes and apartments will be accommodated in 3 four storey blocks which will include balconies/terraces facing north-west and south-east; the development will consist of the demolition of 4,701sq.m of existing gross floor area (730sq.m habitable and 3,971sq.m non-habitable) and the construction of 11,917sq.m gross floor area; vehicular access from the subject lands to Adamstown Way to the south and to Tandy's Lane to the north; a vehicular connection will also be provided to the north-western boundary of the site to allow for a future vehicular connection to Adamstown Park (pending the future development of adjacent third party lands to the north-west); internal routes including new north-south avenues linking Tandy's Lane with Adamstown Way and an east-west avenue which will link to Adamstown Park (pending the future development of adjacent lands); pedestrian connections from the subject lands to Adamstown Park along Tandy's Lane and to Adamstown Way; 145 car parking spaces including on-curtilage and on-street spaces; bicycle parking; bin storage; plant; sedum roofs; solar/photovoltaic panels; boundary treatments; lighting; hard and soft landscaping including 833sq.m public open space and 737sq.m communal open space; changes in levels and all other associated site works above and below ground on lands on a 2.41 Ha site at Tandy's Lane incorporating the dwelling's Carrig (Eircode K78 D348), Coolmore (Eircode K78 XH33) and an unnamed dwelling (Eircode K78 X780) all at Tandy's Lane and are bounded generally to the north-east by Tandy's Lane (with Tandy's Lane Park beyond) to the south-east by Finnstown House Hotel (Protected Structure) and to the south-west and north-west by undeveloped lands; Adamstown Way is located further to the south and Adamstown Park is located further to the west; the application is made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to a proposed development with the Adamstown Strategic Development Zone with lands located within the St. Helen's Development Area.
Demolition of 3 existing dwelling houses in addition to 9 farm structures and outbuildings and the construction of 113 residential units comprising 70 two storey dwelling houses (comprising 61 three bed units and 9 four bed units ranging in size from 109sq.m to 148sq.m); 30 duplex units (comprising 16 two bed units and 14 three bed units ranging in size from 94sq.m to 110sq.m) and 13 apartments (comprising 8 one bed units and 5 two bed units ranging in size from 50sq.m to 73sq.m); duplexes and apartments will be accommodated in 3 four storey blocks which will include balconies/terraces facing north-west and south-east; the development will consist of the demolition of 4,701sq.m of existing gross floor area (730sq.m habitable and 3,971sq.m non-habitable) and the construction of 11,917sq.m gross floor area; vehicular access from the subject lands to Adamstown Way to the south and to Tandy's Lane to the north; a vehicular connection will also be provided to the north-western boundary of the site to allow for a future vehicular connection to Adamstown Park (pending the future development of adjacent third party lands to the north-west); internal routes including new north-south avenues linking Tandy's Lane with Adamstown Way and an east-west avenue which will link to Adamstown Park (pending the future development of adjacent lands); pedestrian connections from the subject lands to Adamstown Park along Tandy's Lane and to Adamstown Way; 145 car parking spaces including on-curtilage and on-street spaces; bicycle parking; bin storage; plant; sedum roofs; solar/photovoltaic panels; boundary treatments; lighting; hard and soft landscaping including 833sq.m public open space and 737sq.m communal open space; changes in levels and all other associated site works above and below ground on lands on a 2.41 Ha site at Tandy's Lane incorporating the dwelling's Carrig (Eircode K78 D348), Coolmore (Eircode K78 XH33) and an unnamed dwelling (Eircode K78 X780) all at Tandy's Lane and are bounded generally to the north-east by Tandy's Lane (with Tandy's Lane Park beyond) to the south-east by Finnstown House Hotel (Protected Structure) and to the south-west and north-west by undeveloped lands; Adamstown Way is located further to the south and Adamstown Park is located further to the west; the application is made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to a proposed development with the Adamstown Strategic Development Zone with lands located within the St. Helen's Development Area.
Installation of 6 telecommunications antenna together with supporting structures, RRU's equipment cabinet at roof top level to provide mobile electronic communications services and all associated site works.
237 dwellings (up to a maximum of c.24,911sq.m GFA) in a mixture of terraced, semi-detached and detached houses, duplexes and apartments as follows; 119 apartment units shall be accommodated in 4 blocks of 2-5 storeys; Block 01 (4 storey) to consist of 20 one bed apartments and 16 two bed apartments; Block 02 (4-5 storey) to consist of 22 one bed apartments and 41 two bed apartments; Block 04 (3-4 storey) to consist of 9 two bed apartments and 1 the bed apartment located within the 4 storey element of Block 4; Block 05 (2-3 storey) to consist of 1 one bed apartment, 5 two bed apartments and 4 the bed apartments, 20 duplexes shall be accommodate in 2 blocks of 3-4 storeys; Block 03 (3 storey) to contain 2 one storey one bed unit, 2 one storey two bed units and 4 three storey three bed units; Block 04 (3-4 storey) to contain 12 three storey three bed units located within the three storey element of Block 4; 98 houses shall consist of 67 two storey, three bedroom houses; 47 with the option of a single storey rear extension at ground floor level (House Types B1.1x and B1.2x); 15 two storey, four bedroom houses; 6 three storey, four bedroom houses and 10 part three storey, part two storey four bedroom houses; provision of 1367sq.m of public open space; provision of c. 318 car parking spaces; re-alignment of the northern section of Tandy's Lane from a point to the north of the entrance to Somerton House to its junction with Adamstown Drive (existing access arrangements will not be affected); all ancillary and associated site development and landscape works; vehicular access to the development is to be provided off Adamstown Drive, The Paddock's Way and the re-aligned Tandy's Lane on lands bounded generally to the northwest by the Hillcrest residential development, to the northeast by Supervalu Lucan, to the east by Westbury Drive, Westbury Avenue, the rear of houses fronting onto Westbury Grove, and Somerton (Phase 1) currently under construction pursuant to SDCC Reg. Ref. SDZ16A/0005, to the south by Somerton House (a Protected Structure), and Tandy's Lane Park Amenity Area (permitted under SDCC Reg. Ref. SDZ18A/0003, and to the west by Adamstown Park and The Paddock's Way with the site located on both sides of Adamstown Drive and also on either side of the northern portion of Tandy's Lane.
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ23A/0018 comprising the Clonburris Development Areas CSW-S1 and CSW-S2 of the Clonburris SDZ Planning Scheme 2019 as follows: Site A (to the north of the permitted CSLS) the proposed amendments to the permitted layout and external elevations of Apartment Block B1 to include: i. A change to the location of window / terrace door at ground floor level; ii. The swapping of a terrace door / window at ground and upper floor levels; iii. Amendment to the stair core and omission of a step-out of the external wall at ground and upper floor levels; iv. Proposed relocation of a plant room door at ground floor level on the western elevation; v. Proposed change of doorway to bicycle store at ground floor level on the western elevation; vi. Provision of 1 no. Cleaner's Store at ground floor level (c.12.4 sq.m); vii. Proposed increase in area for PV panels from c.15 sq.m to c.175 sq.m and provision of 7 no. additional Automatic Opening Vents (AOVs) at roof level; viii. Provision of 2 no. additional internal fire doors at ground floor level; ix. Amendment to 6 no. units at ground floor level to provide for Universal Access; x. The amalgamation of 2 no. Plant Rooms, as approved under the parent permission, to provide for 1 no. single Plant Room (c.86.32sq.m) and a Meter Room (c.14.19 sq.m) located to the north of the Plant Room; xi. A proposed change from green roof, as approved under the parent permission, to brown roof; xii. The lowering of the higher roof parapet level from 74.47 AOD to 73.42 AOD on the western elevation; xiii. Proposed change of finish from render to buff brick on western elevation and provision of protruded buff brick detail on upper floor levels of northern, southern, eastern and western elevations; xiv. Provision of wall mounted feature panel (3.45 sq.m) at ground floor level on the western elevation; xv. Proposed change from brick finish to render at ground and upper floor level of the western elevation; and, xvi. The omission of dark render detail at upper floor levels on the western elevation. Site B (to the south of the permitted CSLS) the proposed amendments to the permitted layout and external elevations of Apartment Block B2 to include: i. A change in window location at ground and upper floors on western elevation due to a change in apartment layout; ii. Relocation of plant room door on ground floor level on eastern elevation; iii. the provision of a new window ope at ground and upper floor levels on the northern elevation; iv. Provision of Cleaner's Store (4.79 sq.m) at ground floor level; v. Proposed change to fenestration arrangement on northern, southern, eastern and western elevations due to change in apartment layout; vi. Amendment to arrangement of stairway; vii. Provision of 2 no. additional Automatic Opening Vents and increase in area for PV panels from 30 sq.m to 132 sq.m at roof level; viii. The lowering of the higher roof parapet level from 75.32 AOD to 74.47 AOD on the western elevation; ix. The amalgamation of 2 no. Plant Rooms, as approved under the parent permission, to provide for 1 no. single Plant Room (c.59.55 sq.m) and a Meter Panel Room (c.13.82 sq.m) located to the south of the Plant Room; x. Proposed change from green roof to brown roof; xi. The omission of dark render detail on the upper floors of the eastern elevation; xii. The provision of a wall-mounted feature panel (3.91 sq.m) at ground floor level on the western elevation; xiii The lowering of brick finish to window head height on the northern, southern and eastern elevations; xiv. The omission of a canopy above the permitted entrance on the eastern elevation; xv. The provision of protruded brick details at upper floor levels on the western elevation; and, xvi. The provision of alternative render panels on upper floor levels of the northern and eastern elevations. The proposed amendments will result in an overall increase in Gross Floor Area by 35.4 sq.m to 7,722.2 sqm and will also include the relocation of an ESB substation and associated switch room to the gable end of Apartment Block 2, the reconfiguration of the existing bin, bicycle and ESB room to provide for bin and bicycle storage only and a minor amendment to car parking spaces to provide for access to the relocated ESB substation and all associated/ancillary amendments.
7 year Planning Permission for development at site of c. 13.75 hectares (on 2 parcels of land consisting of construction of 565 dwellings (mixture of apartments, duplex apartments and houses) in the Clonburris Development Areas CSW-S1 & CSW-S2 of the Clonburris SDZ Planning Scheme 2019 as follows a) 230 houses comprising 1 two bedroom house, 217 three bedroom houses and 12 four bedroom houses, all 2 storey (house types H3, H4, H4S, H5, H6 - 3 no. storeys) comprising semi-detached, terraced, end terrace units (with parking, solar panels and private open space); b) 216 duplex apartments/apartments comprising 108 two bedroom units and 108 three bedroom units, in 20 no. 3 no. storey buildings (in a series of 4, 6, 7, 8 & 9 terraced blocks); c) 119 apartments as follows: Block 81 (4 storeys) consists of 72 apartments (33 one bedroom & 39 two bedroom apartments); Block 82 (4 storeys) consists of 47 apartments (17 one bedroom apartments & 30 two bedroom apartments (all apartments to have terrace or balcony); d) Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 to the east; e) Public Open Space/landscaping of c. 3 hectares (to include Grand Canal Park along the southern boundary of the site to connect to existing Grand Canal towpath) as well as a series of communal open spaces to serve apartments and duplex units; f) The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (675 spaces) and bicycle parking (998 spaces), single storey ESB substations/bike/bin stores, green roofs and solar panels at roof level of apartments, and all ancillary site development / construction works; g) Permission is also sought for provision of and connection to water supply foul drainage infrastructure; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 all on wider lands bounded generally by the Dublin-Cork railway line to the north, the Grand Canal to the south, and undeveloped lands to the east and west and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.
Development consisting of change of permitted rear boundary treatment of 8 permitted residential units in 'Somerton Woods' (1 House Type A1.1, 4 House Type A1.2, 2no. House Type B1.2/B1.2X and 1 House Type A1.1h) from permitted 1.3m high timber post and hit and miss board fence with 800mm high pergola above (2.3m total height) to a 2m high capped brick wall with 2.15m high brick piers and timber access gates to private gardens; The overall length of boundary treatment subject to the development being proposed is approximately 49.6m, as permitted, the development proposed is a minor amendment to development permitted under Reg. Ref.SDZ19A/0004, no other alterations are proposed to development permitted under Reg. Ref. SDZ19A/0004 on lands bounded generally to the northwest by the Hillcrest residential development, to the northeast by Supervalu Lucan, to the east by Westbury Drive, Westbury Avenue, the rear of houses fronting onto Westbury Grove, and Somerton (Phase 1) permitted and constructed under SDCC Ref. Reg. SDZ16A/0005, to the south by Somerton House (a Protected Structure), and Tandy's Lane Park Amenity Area (permitted under SDCC Ref. Reg. SDZ18A/0003, and to the west by Adamstown Park and The Paddocks Way. The site is located on both sides of Adamstown Drive and on either side of the northern portion of Tandy's Lane.
Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.
The development will consist of the amendment of Condition no. 3 (ii) and 3 (iii) of the permission granted under Reg. Ref. SO21A/0042 that related to the Gas Plant of the overall permitted development only, so that these aspects of the new condition shall read as follows: Condition no. 3(ii) Within four (4) years from the date the first Gas Plant commences operation, the applicant or operator shall undertake a review with GNI of the ability to serve the Gas Plant with green gas and / or hydrogen (or similar fuels) shall be Investigated and reported to the Planning Authority. Any ability for the Gas Plant to be operated with green gas and/ or hydrogen (or similar fuels) shall be implemented within an agreed timeline agreed with GNI. Condition no. 3(iii) If the applicant receives a firm offer from Eirgrid under which the Gas Plant is not required, and the connection has been realized with capacity onsite from Eirgrid, then the Gas Plants shall be removed from the entire site within a year of the ceasing of operation. The nature and extent of the permitted Gas Plants, or any other element of the parent permission granted under Reg. Ref. SD21A/0042 will otherwise not be amended by this application. An EPAIndustrial Emissions (IE) licence will be applied for to facilitate the operation of the Gas Plant that Is subject of this amendment application.
Change of use of one 59sq.m polyvalent community room into a sessional Montessori preschool, running daily Monday - Friday, from 9am to 12noon, as well as 2 display signs, internally mounted on a south window during operating hours and all related arrangements.
Erect a 24 meter high lattice telecommunications support structure together with antennae, dishes and associated telecommunications equipment, all enclosed in security fencing; The proposed development is located within the curtilage of a Protected Structure.
Planning permission for 1.) the conversion of an existing side garage to a playroom space, 2.) a single storey rear extension incorporating internal modifications, 3.) the conversion of the existing attic space to a new study/storage room which incorporates the change of existing roof profile from hipped roof to a half hipped gable ended profile, with new access stairs and rear dormer roof extension, plus all associated site works.
Construction of a first-floor side extension over the existing ground floor side structure incorporating internal ground and first floor modifications; a single storey rear extension; conversion of existing attic space into a store room with access stairs and 3 rooflights to the rear elevation; all associated site works.
Conversion of attic to storage and a bathroom including a dormer window to the rear all at roof level.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
2 four bedroom, semi-detached dormer bungalows.
Proposed Build-up of existing Hip in roof to side of Roof into Dutch hip at attic level. Extension of existing Attic Conversation & use as Habitable space
Change of use of existing creche to a single family dwelling with some minor internal alterations, no external alterations to the existing building are proposed.
Proposed build-up of existing hip roof to side of roof into dutch hip with window in proposed gable wall at attic level. Proposed attic conversion to habitable space with dormer roof window on rear slope of roof and roof light on front slope of roof all attic level.
Single storey extension to the side of existing dwelling with all associated site works.
Permission for amendments to previously permitted development at a site of approximately 0.53 Ha in the townland of Doddsborough, south-west of Lucan, Co. Dublin. The site is generally bound: to the north by Somerton Rise and Somerton Row; to the east by Somerton Row, Somerton Drive and Somerton View; to the south by the L1030; and to the west by The Paddocks Way. The proposed amendments are to development previously permitted under Reg. Ref. SDZ19A/0004 (amended under Reg. Ref. SDZ21A/0016 and Reg. Ref. SDZ23A/0039), as extended under Reg. Ref. SDZ19A/0004/EP. This Application is being made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to development within the 'Airlie Stud' and 'Somerton' Development Areas of the Adamstown Strategic Development Zone. The amendments principally propose the omission of 40 No. apartment and duplex units (3 No. 1-bed, 16 No. 2-bed and 21 No. 3-bed) and the provision of 39 No. units (15 No. 1-bed, 3 No. 2-bed, 20 No. 3-bed and 1 No. 4-bed) in their stead. The 39 No. proposed units include 3 No. 2-storey houses (2 No. 3-bed and 1 No. 4-bed) and 36 No. duplex units in buildings of 3 No. storeys (15 No. 1-bed, 3 No. 2-bed and 18 No. 3-bed). The total number of units in the amended and extended Reg. Ref. SDZ19A/0004 permission will decrease by 1 No. to 241 No. The proposal and amendments also relate to: the location and number of car parking (reducing from 48 No. spaces to 46 No. spaces); cycle parking; communal amenity space; private amenity space (as gardens, balconies and terraces); hard and soft landscaping; boundary treatments; bin stores; and all associated works above and below ground.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
205 Residential Units overall (20,977 sqm GFA), consisting of; - St. Helens Development Area - 153 no. units comprising 1 no. 2 storey 3 bedroom detached house, a total of 108 no. duplex units, all in 3 storey buildings and terraced in a mix of 54 no. 3 bedroom units, 42 no. 2 bedroom units and 12 no. 1 bedroom units and a 5 storey (with undercroft parking) apartment block containing 44 no. units a mix of 13 no. 1 bedroom, 4 no. 2 bedroom (3 person) and 27 no. 2 bedroom (4 person) apartment units. - Adamstown Castle Development Area - 16 no. units comprising 3 no. 2 storey 3 bedroom terraced houses, 1 no. 3 storey 4 bedroom end terrace house, a total of 12 no. duplex units, in a range of 3 - 4 storey buildings in a mix of 8 no. 3 bedroom units and 4 no. 2 bedroom units. - Adamstown Square Development Area - 36 no. units comprising 20 no. 2 storey 3 bedroom terraced houses, 4 no. 2 storey 4 bedroom terraced houses, a total of 12 no. duplex units, all in 3 storey buildings and terraced in a mix of 6 no. 3 bedroom units, 4 no. 2 bedroom units and 2 no. 1 bed units. The development proposes the relocation of an existing ESB substation within and otherwise undeveloped part of the Adamstown Square Development Area and all other ancillary site development and landscape works; including new vehicular access points off Castlegate Grove, Adamstown Park, Adamstown Way, Tandy's Lane and Stratton Heath; public and communal open space; car parking and bicycle parking. The lands are generally bounded by Adamstown Park to the West, Stratton Walk residential units and Adamstown Avenue to the South, Stratton Heath, Finnstown House (a Protected Structure), development permitted under Reg. Ref. SDZ20A/0020 and also Castlegate Grove/Castlegate Close to the east and Adamstown Park and Tandy's Lane (road) and Tandy's Lane Park to the North. Adamstown Way passes between the application site All within the Adamstown Strategic Development Zone.
Provision of an establishment to which to European Communities (Major Accident Hazards involving Dangerous Substances) Regulations 2006 as amended by Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 apply, constituting a change of use; The new establishment will include all the existing and permitted buildings (SD13A/0143 as amended by SD13A/0265, SD14A/0194 as amended by SD15A/0343, SD16A/0088 as amended by AD17A/0318 & SD20A/0283, SD21A/0203 & SD21A/0288, all within an existing campus; The proposal relates to the total quantum of fuel oil to be stored within existing and permitted tanks across the existing and permitted buildings; For the avoidance of doubt no works or physical development is proposed and the application relates to an existing development which comprises or is for the purpose of an activity requiring an integrated pollution prevention and control (IE) licence.
Demolition of existing single storey extension to rear and construction of new part single and part two storey extension to front, rear and side; new roof light to south plane of roof; new pedestrian entrance in existing side boundary wall and all associated site works.
Retention and completion of amendments of previously granted planning permission (Reg. SD19B/0452) comprising of: revision to proposed drainage layout; new first floor extension of 10sq.m to south-east including new pitched roof with new 'Velux' rooflight to south-west plane and all site works associated with all of the foregoing.
68 no. apartment units (49 no. 1 beds and 19 no. 2 beds) in a single block ranging in height from 4 to 5 storeys (Block 2); All associated and ancillary site development, infrastructural and landscape works, including:- reconfiguration of car parking along part of Somerton Gate and provision of new road and car parking layout to south and east of Block 2 resulting in an increase of 12 no. car parking spaces (77 no. in total); Provision of a secure bicycle parking facility (93 no. spaces) to the east of Block 2 and additional visitor bicycle parking (36 no. spaces) to the west of Block 2 (129 no. in total); Reconfiguration of permitted bin store adjoining Block 1 to provide a smaller bin store and new plant room; Revised landscaping layout to east of Block 2; Provision of plant at ground floor and roof level (including provision for PV panels). The proposed development is an amendment to Apartment Block 2 permitted under SDCC Reg. Ref. SDZ19A/0004, as amended by SDCC Reg. Reg. SDZ21A/0016. The overall number of residential units under SDCC Reg. Ref. SDZ19A/0004, as amended increases from 237 no. to 242 no. dwellings as a result of this development. The lands are bounded generally to the northwest by the Hillcrest residential development, to the northeast by Supervalu Lucan, to the south by permitted public open space and Somerton View and north by the completed Apartment Block 1.
The development will consist of a fuel tank set down area and canopy (approx. c.279sqm and c.4.8m in height) at Microsoft Grange Castle Campus. All other site development and ancillary works.
Change of Use from Retail unit to unit for Day Care Centre Use.
Planning Permission is sought for alteration/extension of the existing two-storey end of terrace house, comprising demolition of the existing rear bay window, and construction of a new single storey flat roof rear extension, with rooflights, and a new two-storey side extension, with Dutch-hipped pitched roof, modifications to the existing fenestration, plus associated internal alterations and site development, including provision of a new vehicular access gate from the roadway to the rear garden.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Demolition of the existing side concrete shed and chimney stack; Construction of a double storey side extension & a single storey extension at rear and a dormer extension for storage; and rooflights at the front; widening the existing vehicular access; internal alterations & all associated site works.
To convert attic to storage room, with dormer roof to rear of dwelling and new roof windows to front and rear of existing roof and all associated site works.
The retention of 1 No. roof window to front of existing roof.
Planning permission from the permitted class 2 (Professional Services) use to use as a medical surgery (Class 8)
A new two storey extension linked to the existing primary school consisting of a new 2 Classbase Special Educational Needs facility with ancillary accommodation on ground floor and additional teaching rooms to first floor. (total area 842sq.m); Associated ancillary siteworks to include revised carparking layout (total no. 31), the demolition of existing external & bin store with new external & bin store to be located near main entrance gate (total area 25.5sq.m), existing bicycle shelter to be relocated next to new external store with provision for additional bicycle spaces to be included and any accompanying landscaping works; The provision of 12sq.m of photovoltaic panels to extension roof.
2 bedroom dormer type bungalow to side and front of existing family home, existing entrance used for car parking and all associated site works.
Construction of a three bedroom, dormer type bungalow to side of existing family home; new entrance for car parking to existing house and all associated site works.
Two storey extension (floor area 199sq.m) containing 1 classroom at ground floor level; 1 classroom and an assisted shower room at first floor level to the rear of existing two storey school building (floor area 2,767sq.m); new roof window to existing roof surface of adjacent stairwell, together with all associated site works.
Substantial alterations to previously approved planning application (Reg Ref No. SD22A/0294) for a new dwelling to the side of the existing house. Alterations include changes to the footprint, slight raising of the ridge height & dormer windows to the front & rear to allow for the habitable accommodation of the 2 bedrooms at 1st floor level, internal alterations & all associated works.
Single storey extension to the side with pitched roof over and 2 roof windows. single storey extension to the rear with lean to roof over and 4 roof windows; front porch extension with apex roof; solar panel array to the rear roof profile; relocation of front driver pier; demolition of existing rear extension.
New 3 storey Community Family Centre building, size 955 sq m, containing early learning centre, therapy & consultation rooms, parenting rooms, computer classrooms, stores, offices, meeting rooms and ancillary accommodation. Externally external play areas, car parking, bike parking and shelters, bin storage, new vehicular and pedestrian access and gates off St. Cuthbert's Road, perimeter fencing and associated groundworks and signage at a site off St. Cuthbert's Road.
Demolish existing shed in rear garden; construct a two storey, three bedroom detached dwelling in side garden; construct a new driveway for the proposed dwelling including permission from Council to extend the existing dished area of outside footpath; all ancillary site works.