Permission for a) the erection of a fully serviced part two-storey, part single storey dwelling house linked to the existing single-storey family flat, and b) the demolition of the existing single-storey store/office outbuilding, storage container, shed, canopy, and gate to the side of the existing dwelling house. All with associated and ancillary site works
Two storey extension to the side and rear; single storey extension to the rear and all ancillary works necessary to facilitate the development.
Single storey extension to side & rear of existing dwelling with internal alterations and all associated site works.
Demolition of existing single storey side extension and permission to sub-divide existing house to construct a two storey, semi-detached (end of terrace) house to side; connection to public foul sewer, shared parking space to front and all associated site works.
Change of use of the first floor from offices in No. 43 and restaurant in No. 44 to 3 two bedroom apartments and 1 one bedroom apartment and an interconnecting doorway between the two existing ground floor shop at No. 43 and the takeaway food shop at No. 44 Tower Road; new stone-clad shopfront with an aluminium glazing system and signage in the fascia over each unit.
(i) provision of a single-story extension (2.4m x 8.92m) to the front of the structure; (ii) internal works as follows: (a) plastering of internal walls with insulated lime plaster, (b) build-up of existing front window opes internally only on 1st floor level (maintaining window slats), and (c) internal layout revisions including the omission of existing partition walls/doors and provision of new partition walls at ground and first floor levels; (iii) restoration of roof slates with replacement where required. (iv) change of use of the structure from an ancillary storage building to guesthouse use to provide for 2 no. additional guesthouse suites, each inclusive of 1 no. bedroom, 1 no. living area and 1 no. bathroom; (v) The development includes all ancillary site works, inclusive of landscaping, tree-removal and drainage, necessary to facilitate the development. The proposed guesthouse will form part of the existing guesthouse use within Towerville and will result in a total of 9 no. guesthouse bedrooms provided on site. The subject building is within the curtilage of Towerville, a protected structure.
Planning permission for a proposed change of use of 3,875 sq.m. floorspace from office-based industry to office use. The proposed development also includes reconfiguration of car parking area resulting in replacement of 4 no. existing car parking spaces with 40 no. bicycle parking spaces, along with all associated site works to facilitate the development.
Retention Planning Permission for (a) an existing side pedestrian entrance/access gate leading onto Treepark Road, and (b) an existing high-level boundary wall to the front of the existing dwelling house.
Replacement pitched roof over garage and courtyard; single storey utility, toilet and lobby extension to courtyard; single storey sunroom to the rear; single storey glazed porch to the front, at the Old Rectory, Belgard Road, Dublin 24
Permission to (a) construct extension to front of existing building & (b) convert existing Laundry room to bedroom with en-suite associated with Guest House / B&B.
(i) a change of use from existing residential dwelling to guest house, (H) the provision of 1 no. accessible bathroom at ground floor level, (Hi) changes to the external elevations inclusive of the widening and lowering of existing door ope to 0.8m on the south elevation, widening of gate into courtyard to (from O.8m to 1m wide) and subdivision of an existing window opening on the north elevation of the building, (iv) internal layout revisions including the omission of existing partition walls/doors at ground and first floor levels and provision of new partition walls to facilitate new internal layouts, and (v) provision of 1 no. accessible car parking bay. The development includes all ancillary site works, inclusive of boundary treatments, landscaping and SuDS drainage, necessary to facilitate the development, at Towerville, Tower Road, Dublin 22, D22 XTS1 (a protected structure: RPS Ref: 419).
Change of use of portion of the ground floor (29.48 sq m) from office to residential accommodation and retention permission for the incorporation of the internal courtyard (7.16 Sq m) as part of the residential accommodation.
The development will consist of 1) a side garage conversion and second storey side extension, 2) a single storey lean to extension to the rear, 3) the widening of the vehicular front entrance, 4) a front porch extension 5) a roof light on the south facing hipped roof and 6) all site ancillary works.
A front porch, rear extension, pitched front dormer roof and a flat rear dormer roof.
Modifications to the Primary Healthcare Centre as permitted under Reg. SD11A/0135 (An Bord Pleanala Ref. PL06S.239890) and SD20A/0054 comprising of relocation of existing bus shelter on Boot Road (Bus Stop No. 3465) by c.75m northwards and construction of a new stainless steel and glass bus shelter including a double-sized internally illuminated advertising panel; Construction of an external stair core from the basement car park to surface level with associated changes to car parking layout.
Retention permission sought for 4 external signs at HSE Primary Healthcare Centre; sign 1 located on right hand side of main entrance pillar from Ninth Lock Road (0.348sq.m); sign 2 located at the left hand side of south-west facade at under-croft archway (1.32sq.m); sign 3 located on the right hand side of the south-west facade at under-croft archway (2.4sq.m); sign 4 located on north-east facade on right hand side of the building (1.109sq.m); total area (5.1773sq.m).
Installation of telecommunications equipment including a pole mounted tri-sector antenna and dish, remote radio units (RRU's), GPS, latchways system, cabinet, steelwork and all associated site development works on the rooftop; The development will provide for high speed wireless data and broadband services.
Alterations to previously approved, but not yet constructed development under planning Ref. Ref. (SD11A/0135 - Block A was approved as a primary health care building and will remain so; Block B was approved as a nursing home building and permission is now sought to use that building as a primary health care us; Permission is also sought for an external café and relocation of sub-station from entrance area to a position on Fonthill Road); alterations to Block A of 3,249sq.m consist of minor internal reconfiguration to stair No. 1 cores, position of lift shafts and circulation areas; alterations to Block B of 3,521sq.m (previously approved use as a nursing home) to facilitate the use as a primary healthcare centre include internal reconfiguration to provide 10 consultation rooms; 37 offices; 7 clinic rooms; 4 administration/reception; 4 large group rooms and associated ancillary uses including a new external lift and stair to car park; a total of 149 car parking spaces are to be provided for the proposed development; this includes 125 spaces at basement level including 6 accessible car parking spaces and 24 spaces at surface level including 3 accessible car parking spaces; alterations to the previously approved permission also include for 20 new bicycle parking spaces; new plant space and storage; the previously approved entrance from Boot Road/Convent Road providing pedestrian, cycle and vehicular access including previously approved landscaping, remain as approved.
1. Construction of a two storey side extension with a gable ended roof to consist of a living room, WC and utility at ground floor and master bedroom with a walk-in wardrobe and a bathroom on the first floor. 2. Modifications to the existing side boundary wall for provision of a new pedestrian access exiting onto Kingswood Heights Grove. 3. Modifications to the existing front and side walls boundary treatments for provision of a new vehicular access including dished public footpath exiting on The Grove, Kingswood Heights. General remodel and partial upgrade of the existing dwelling to suit the proposed layouts. 5. All drainage, structural and associated site works to be implemented.
Erect 525sq.m. of photovoltaic panels on the roof of existing unit with all associated site works.
Demolition of existing light industrial building (formerly known as Acoustic House) totalling 1,742sq.m; provision of new hardstanding areas and use of the former Acoustic House site as part of the adjacent Frank Keane Motors site to provide for used vehicle display; compound parking; customer parking; service parking; demo parking; construction of a 6 bay car wash and valet facility (244sq.m) located at the western boundary of the site; all associated boundary treatments and all associated site and development works on a site (1.3889ha) at Frank Keane Motors and adjacent premises formerly known as Acoustic House (vacant).
Extension of 352sqm to the existing car workshop located to the rear of the existing car showroom to provide additional car servicing, valet and wash bays. Reconfiguration of the adjoining external compound car storage area, including the removal of 16 storage car parking spaces to accommodate the proposed extension, revised and extended building elevations and all associated site development works.
27sq.m first floor extension over an existing ground floor to the front, rear and gable.
(i) A change of use from existing residential dwelling to guest house, and (ii) the provision of 1 no. accessible bathroom at ground floor level. The development includes drainage, landscaping, boundary treatments and all ancillary works needed to facilitate the development.
The development will consist of: 1) The demolition of all existing buildings, structures and yard on site; 2) Construction of a part 4-storey and part 5-storey apartment building to accommodate 13 no. apartments, comprising 10 no. 1-bed units and 3 no. 2-bed units with associated terraces; 3) Vehicular and pedestrian access from Killeen Road; 4) 8 no. car parking spaces at surface level; 5) Landscaping, bicycle parking, refuse storage, boundary treatments and all associated site development works and services.
Planning Permission for Retention sought for the construction of a tarmac finish off-road parking area in front of the property on the open space lands owned by the Local Authority, and Planning Permission sought for the replacement of the tarmac finish with a grass paving system, and all necessary ancillary site development works to facilitate this development
The construction of a tarmac finish off-road parking area in front of the property on the open space lands owned by the local authority, and all the necessary ancillary site development works to facilitate development.
Retention of partial change of use from warehouse to office space to include Retention of additional first floor, second floor offices and meeting rooms also to include all associated site works to facilitate the development.
Development of a ground floor extension (approx. 104 sqm GFA and 4.4m in height) and all other associated site development works above and below ground.
370sqm side and rear extension, new entrance, and new facade to front elevation.
Change of use from motor storage to motor retail showrooms (total area 629sq.m), to include new car showroom and ancillary offices at ground and first floor levels and a motor servicing workshop (total area 483sq.m). New showroom glazing to the northern elevation. Carparking and associated site works. New building signage and a free standing totem sign to the northern boundary and ancillary site development works.
RETENTION: Retention of the existing office space at second floor level resulting in an overall office floorspace increase of 125 sqm approximately, Creation of 2no. openings to the south elevation and associated site development works.
PERMISSION & RETENTION: The development will consist of extension of the existing office space at second floor level resulting in an overall office floorspace increase of 125 sqm approximately, construction of a new mezzanine level in the warehouse area (circa 257 sqm) and a new stairwell. Creation of 2no. openings to the south elevation and 1no. opening to the west elevation and associated site development works. The development will also include the retention of the existing office space at ground and first floor level of 250 sqm approximately.
A storey and a half extension to the side and a single-storey extension to the rear. The addition will include a new porch, games room, utility room, kitchen/ dining room and two additional bedrooms. Moreover, the proposal includes widening of the vehicular site access including all associated site works.
Alterations to an existing two storey dwelling including construction of a two storey extension to the front, side and rear elevations and all associated site development works.
Single storey CNG (compressed natural gas) compressor installation with a floor area of 19sq.m; covered shelter with a floor area of 30sq.m and a 2.6m high boundary wall around the site with all ancillary services and associated site works.
Construction of a single storey extension to the side & rear of the existing two storey dwelling and all associated site works.
Change of use of 147sq.m of existing ground floor warehouse area to a food production area including new extract duct taken through the roof from proposed cookline canopy and new grease trap together with all associated site works.
The installation of a new external door to the rear facade & internal alterations at ground floor.
Erection of 2 two storey industrial units adjacent to existing S1 unit comprising of warehouse, office and toilet at ground floor level and proposed storage to mezzanine floor level; alterations to external area/existing car park and all associated site works.
Erection of a marquee type structure with a floor area of 618sq.m as an extension to the side and rear of existing warehouse buildings.
(i) change of use of existing premises from car dealership to warehousing/distribution facility with associated internal alterations to facilitate use; (ii) provision of new fascia signage on the front/north-west elevation; and (iii) all associated ancillary works necessary to facilitate the development.
(i) partial change of use of existing building, which comprises a warehouse with ancillary offices and archive storage, at ground floor level only to provide a product display showroom (66sq.m), 2 no. service repair rooms (104sq.m total) and the reconfiguration of the ancillary office space with associated internal alterations to facilitate; (ii) reconfiguration of internal layout at first floor level with no change to ancillary office space at this level; (iii) provision of new fascia signage on the front/north-west elevation; and (iv) all associated ancillary works necessary to facilitate the development. The revised building will provide 528sq.m of warehouse space (reduced from 745sq.m) and 366sq.m of ancillary office space (increased from 319sq.m).
The development will consist of the construction of a roofed extension (approx. 450 sqm), to incorporate forklift movements to the packaging area of the existing factory and associated site works to include access doors to existing buildings and demolition of existing storage sheds.
Residential development consisting of the construction of a four to six storey building accommodating 44 apartments comprised of 22 one bedroom apartments and 22 two bedroom apartments; vehicular access to the proposed development will be via St. John's Road with 10 car parking spaces and 24 bicycle parking spaces and ancillary services all on a site of 0.31 hectares to the rear of St. John's Road with frontage onto Fonthill Road.
Permission for residential development comprising 9 dwellings. The proposed development is comprised of: (1) 2 Type A, 2 bed two storey semi-detached houses; (2) 1 Type B, 3 bed two storey detached house with attic conversion; (3) 2 Type C, 3 bed two storey end terrace houses with attic conversions; (4) 2 Type D, 2 bed two storey mid terrace houses with attic conversions; (5) 2 Type E, 3 bed two storey end terrace houses with attic conversions; (6) proposed new vehicular access road from St. Johns Road (located on lands owned by South Dublin County Council); (7) connections to all services and all ancillary site development works and (8) a pedestrian access gate at the intersection of Commons Road and Fonthill Road (located on lands owned by South Dublin County Council).
Installation of a new external door in the Northwest Elevation to access a new ESB meter enclosure at ground floor of Unit 26C Fashion City, Ballymount Road Upper, Dublin 24
Permission and retention permission is sought for the following development: Permission for an ancillary generator structure with a total height of c. 22m located between ICT Facility 2 and ICT Facility 3 including 13 no. double-stacked back-up generators with flues of c. 25m, fuel storage, transformers, and associated electrical equipment and plant. Permission for 13 no. ancillary generators within a fenced compound, with a total height of c. 8.1m located to the north of ICT Facility 3, including 13 no. back-up generators with flues of c. 25m, fuel storage tanks and fuel pump room building, transformers, and associated electrical equipment and plant. The primary fuel for the proposed back-up generators will be Hydrogenated Vegetable Oil (HVO). Permission for associated works including services connections, boundary treatments, lighting, and all ancillary works. Permission for reconfiguration of car parking spaces and the retention of 10 no. car parking spaces to the west of ICT Facility 3, resulting in an overall reduction of 8 no. car parking spaces. Retention permission for 4 no. existing water tanks with a total height of c.9.2m and an existing water processing building with a total height of c. 5.1m, located between ICT Facility 2 and ICT Facility 3. Retention permission for 1 no. sprinkler tank with an overall height of c. 8.1m and a single storey pump room with a total height of c. 3.2m to the north of ICT Facility 3. An EPA-Industrial Emissions Directive (IE) license is required to facilitate the operation of the proposed development.
Removal of two existing prefabricated classrooms and construction of a four classroom, two storey extension to the west of the existing school buildings, together with connections to services and all associated site works.
The development will comprise the following: Demolition of existing commercial/industrial buildings on site (c.6,711 sq.m in total). Provision of a mixed use, residential and commercial/employment development (c.49,275 sq.m GFA excluding undercroft) within 4 no. blocks ranging in height from 6 to 10 storeys. The development will provide 436 no. apartments (all with individual private open spaces) consisting of: 2 no. studios, 180 no. 1-beds, 158 no. 2-beds and 96 no. 3-beds. The development will also include: internal residential amenity spaces (c.375.3 sq.m in total); community library (c.352.1 sq.m); creche (c.359.1 sq.m), and 4 no. commercial/employment units (c.1,226.6 sq.m) comprising 2 office/co-working units (c.435.8 sq.m in total), medical centre (with ancillary pharmacy)(c.674.1 sq.m) and café (c.116.7 sq.m). • Block A - 9 to 10 storeys in height and will provide 81 no. residential units. • Block B - 9 to 10 storeys in height and will provide 137 no. residential units • Block C - 8 to 10 storeys in height and will provide 85 no. residential units • Block D - 6 storeys in height and will provide 133 no. residential units. Upgrades to the western side of the Parkmore Estate Road and along the Long Mile Road and Robinhood Road to provide a variety of pedestrian/ cyclist access points to the development and with vehicular access provided from the Estate Road with associated upgrades to the Estate entrance. The development will also include 173 no. car parking spaces within 2 no. undercroft car parks on site and including 12 no. parking spaces (for the commercial units) along the Long Mile Road frontage. Provision of 1,040 cycle parking spaces. Provision of public and communal open spaces, landscaping, boundary treatments, plant areas, waste management areas, and services provision (including ESB substations), and all associated works required to enable this development including connection to the Uisce Eireann network. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.