to
to

Planning records

Showing 401-450 of 2,129 public records
Page 9 of 20
  1. © OpenStreetMap
    25/4464Granted

    The Upper Deck Point Road Crosshaven Co Cork P43 HD28

    Permission to Retain: The existing roadside boundary walls, the lift building as constructed, the external steel stairs associated with the car deck and lift building, the change in ground levels at lift building, the external steel steps to west of site, the western cliffside deck; the western shed, and alterations to all elevations of the dwelling. Permission for development is sought for: fabric upgrades, modifications to fenestration and external finishes, internal modifications, and part change of use from storage to home gym/office of the lift building; fabric upgrades, modifications to fenestration and external finishes, and extension to the existing dwelling house; amendments to roadside boundary walls to accommodate sightlines, privacy screen at roadside, upgraded landscaping, PV covered carport at parking deck, new wastewater system and all associated site development works.Decision record indexed
    Decision07 May 2025View record
  2. © OpenStreetMap
    2560053Granted

    Eden Point Eden TD, Rossinver, Co.Leitrim

    A ground floor single storey glazed rear extension, enlarged window openings, internal alterations including partial raised floor level and new velux rooflights all to existing 1 & ½ storey detached dwelling. Site works to include new timber clad perimeter fence and hedge planting to a section of the roadside boundary.Decision record indexed
    Decision07 May 2025View record
  3. © OpenStreetMap
    2560044Granted

    Water Street, Castlepollard, Co. Westmeath

    Development and retention of the change of use from a former single dwelling house, domestic garage and garden area to a community facility. Permission is sought to extend the existing pedestrian footpath link to connect the property to the established pedestrian network, provide for 6 no. car parking spaces (of which 1 no. accessible space, 1 no. community car EV charging point) and 10 no. covered and secure cycle parking spaces and any other associated boundary, landscaping and associated above and below ground worksDecision record indexed
    Decision02 May 2025View record
  4. © OpenStreetMap
    2560111Granted

    Site Number 4, Lough Sheever Corporate Park Robinstown, Mullingar Co. Westmeath

    Retention Permission for Change of Use from an existing sub-divided, two storey office building, as previously granted permission under planning file 08/5020 to a Day Services Centre for people with intellectual disability. Permission is also sought to amalgamate both existing units to form one building with proposed internal ground floor and 1st floor connection points, a personnel lift and a 1st floor sensory room, and all associated site worksDecision record indexed
    Decision02 May 2025View record
  5. © OpenStreetMap
    2560251Granted

    Cullairbaun, Athenry L3105 Road, County Galway

    For a proposed Large-Scale Residential Development of 133 no. residential units located off the L3105 Road, in the townland of Cullairbaun, Athenry, County Galway. The proposed development will consist of the: i. Development of 133 no. residential units comprising: a. 12 no. 1 bed units b. 10 no. 2 bed units c. 109 no. 3 bed units d. 2 no. 4 bed units ii. Renovation of the existing building on site, Cullairbaun House (National Inventory of Architectural Heritage registration no. 30332001), for use as a pre-school crèche (254m2) with ancillary open space, refuse storage area and bike storage area. iii. Demolition of existing sheds and the development of a new building (308m2), comprising brick and painted render finish to the building and a standing seam metal roof, to be used as an after-school crèche, with ancillary open space. iv. 1 no. vehicular access point from the L3105 Road. v. 1 no. designated pedestrian and cyclist access point from the L3105 Road. vi. Provision of 185 no. total car parking spaces and 2 no. motorcycle parking spaces on site. vii. Provision of 374 no. total secure bicycle parking spaces on site, including 274 long term and 100 short term spaces. viii. Provision of communal open space including hard and soft landscaping such as planting and paving, and public lighting. ix. Central play areas with a mix of natural play features and climbing / agility equipment. x. Provision of drainage systems including SUDS rain garden areas. xi. 2 no. ESB substation kiosks located to the north and south of the site. xii. Potential for future connections to adjoining sites including An Cheathrú Bhán to the north-east of the site, and Raheen pitches / Gaelscoil Riada to the west of the site. xiii. All other associated and ancillary development and site works. The application contains a statement setting out how the proposal will be consistent with the objectives of the Galway County Development Plan 2022-2028Decision record indexed
    Decision02 May 2025View record
  6. © OpenStreetMap
    2560235Granted

    Ashbourne Business Park, Ashbourne, County Meath

    The proposed development will consist of the following: • The construction of 1 no. high-tech manufacturing facility (approx. 7,851 sqm total Gross Internal Area and 13.2m in height) including ancillary office space, reception area, lobby, circulation areas, canteen, plant, communication room, stores, WCs and showers. • The provision of 4 no. dock levellers and 4 no. doors on grade for loading and unloading of Heavy Goods Vehicles; • The provision of 147 no. car parking spaces (including 15 no. EV parking spaces and 8 no. accessible parking spaces) and 36 no. secure bicycle parking spaces; • 2 no. new vehicular access / egress points are proposed in the form of 1 no. HGV access point and 1 no. vehicular access points to the serve staff car parking areas separately via Ashbourne Business Park; • 2 no. pedestrian / cycle access points are proposed via the R135; • 1 no. bin store and 1 no. recycling store; • 11 no. Condensers and 1 no. Generator associated with the proposed facility; • An underground attenuation tank at the northern end of the site (407m3); and an attenuation basin (approx. 35m3) located at the southern boundary of the site; • 4 no. signage areas on the northern, southern, western and eastern elevations of the proposed facility; • 785 sqm PV solar panels on the southern-western facing roof surfaces; • All associated site development works including lighting, external plant, landscaping and engineering worksDecision record indexed
    Decision01 May 2025View record
  7. © OpenStreetMap
    2550040Granted

    RAILWAY ROAD, DRUMROOSKE MIDDLE, DONEGAL TOWN

    (1) CONSTRUCTION OF 56 RESIDENTIAL UNITS CONSISTING OF (A) 26 NO. THREE-BEDROOM TWO-STOREY SEMI DETACHED DWELLINGS, (B) 16 NO. 2 BEDROOM TWO-STOREY TERRACED DWELLINGS, (C) 2 BLOCKS OF DUPLEX UNITS WITH DUPLEX BLOCK 1 CONSISTING OF 4 NO. 2 BEDROOM GROUND FLOOR APARTMENTS AND 4 NO. 3 BEDROOM DUPLEX DWELLINGS ABOVE AND DUPLEX BLOCK 2 CONSISTING OF 3 2 BEDROOM GROUND FLOOR APARTMENTS ON GROUND FLOOR LEVEL AND 3 NO. 3 BEDROOM DUPLEX DWELLINGS ABOVE; (2) CONSTRUCTION OF ALL ACCESS ROADS, PEDESTRIAN FOOTPATHS AND PEDESTRIAN CROSSINGS INCLUDING THE CREATION OF A NEW ACCESS OFF THE ADJOINING ACCESS ROAD; (3) PROVISION OF ON-SITE PUBLIC LIGHTING TO SERVE THE PROPOSED DEVELOPMENT; (4) CONSTRUCTION OF ALL PUBLIC OPEN SPACE AMENITIES INCLUDING CHILDREN'S PLAY AREAS AND LANDSCAPING FEATURES; (5) PROVISION OF 'HOMEZONE' AREAS TO THE RESIDENTIAL AREAS OF THE PROPOSED DEVELOPMENT; (6) ALL BOUNDARY TREATMENTS, INCLUDING ERECTION OF BOUNDARY FENCES AND WALLS TO THE SITE BOUNDARIES; (7) PROVISION OF CAR AND BICYCLE PARKING FACILITIES TO THE ENTIRE DEVELOPMENT AND WASTE COLLECTION POINTS; (8) INSTALLATION OF A FOUL SEWER NETWORK WHICH SHALL CONNECT TO ADJOINING FOUL SEWER NETWORK AND INSTALLATION OF A SURFACE WATER NETWORK INCLUDING UNDERGROUND ATTENUATION AREAS, INTERCEPTORS AND CONNECTION TO THE ADJOINING SURFACE WATER NETWORK; (9) CONNECTION TO THE ADJOINING PUBLIC WATERMAINS AND (10) ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision01 May 2025View record
  8. © OpenStreetMap
    WEB1473/25Granted

    Building P8, East Point Business Park, Alfie Byrne Road, Dublin 3, D03 E372

    The proposed development will consist of the change of use Building P8 from office use to medical use (GFA: 3534 sq.m) and is described on a level-by-level basis as follows: Ground Floor: 3no. Physiotherapy rooms, Office Reception, 3no. Offices, Entrance Lobby (incl. Waiting area and Reception), Staff Room, Storage room, First Aid room, 2no.Staff Showers, Kitchenette, and all ancillary accommodation; First Floor: 7no. Consulting rooms, Treatment room, 2no. Utility rooms, Interview room, 4 no. Stores, 2no. Offices, Staff Kitchen/Lounge, Reception/ Admin room, Breakout space, and all ancillary accommodation; Second Floor: 8no. Consulting rooms, Treatment room, Reception, 4no. Offices, Interview room, 2no. Utility rooms,3no. Stores, Comms/IT room, Hot desking, and all ancillary accommodation; Third Floor: 8no. Consulting rooms, Treatment room, Reception, 5 no. Offices, 2no. Utility rooms, 3no. Stores, Comms/IT room, Staff Kitchen Lounge, and all ancillary accommodation; Fourth Floor: 3no. Research Labs, 6no. Offices, IT Hub, Waiting area, Teaching space/Meeting room, 2no. Utility rooms, Staff Kitchen Lounge, and all ancillary accommodation; Fifth Floor: 3no. Research Labs, 2no. Utility rooms, 4no. Offices, Reception, Store, Waiting area, and all ancillary accommodation; The proposal involves modifications to the internal layout of the Building P8 building consisting of 6 floors, to facilitate this change of use from office space to medical use. Minor alterations to the external façade of the southern elevation of the building are proposed to facilitate the change of use. The proposed development involves the reconfiguration of the existing parking arrangements to facilitate an increase in the number of spaces available from 30no. to 34no. spaces (includes the provision of 2no. accessible parking spaces) and increase in bicycle parking spaces from 48no. to 60no. spaces. Planning permission is also sought for the creation of a pedestrian linkage on the western side of the building for accessibility to the car parking area, installation of new Perspex cover over the existing Bike racks and all ancillary site services and site development works.Decision record indexed
    Decision01 May 2025View record
  9. © OpenStreetMap
    2560097Granted

    Ahawilk, Feohanagh, Co. Limerick.

    (i) Construct a new milking complex. Proposed milking complex to incorporate dairy, plant room & ancillary rooms, drafting area including flow channel & covered collecting yard incorporating slatted tank with external agitation points & ancillary external concrete (ii) Erect a meal bin. The above development to be carried out with all associated ancillary site worksDecision record indexed
    Decision30 April 2025View record
  10. © OpenStreetMap
    2560225Granted

    Lands at City North Business Campus, Stamullen, Co Meath

    1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising 484.2sq.m and a second floor plant storage area comprising 525.4sq.m. The warehouse building will have an overall height of 14.65 metres. 2. Vehicular access will utilise the existing City North Campus Estate roads. 3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 4. The provision of façade signage along with provision of a totem sign. 5.The provision of an ESB substation. 6. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass hydrocarbon interceptor. 7. All ancillary site development, landscaping and construction works to facilitate foul, water and service network connections. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development and accompanies this application.Decision record indexed
    Decision29 April 2025View record
  11. © OpenStreetMap
    2461137Refused

    Maxol Service Station N7 Naas Road, Kill, Co. Kildare

    For amendments to the previously permitted development (Kildare County Council Reg. Ref. 04/2631), at a site of approximately 0.43 hectares. The proposed development will consist of: the part-demolition of the single storey forecourt building (21 sq m) and the removal of external compounds, substation, car wash, storage shed, and totem signs; the construction of a 219 sq m extension to the forecourt building and revised facades resulting in a part-one/part-two storey building of 525 sq m to accommodate a retail unit (100 sq m net retail area, including a 9 sq m ancillary off licence), 3 No. restaurant/cafe areas (which will include the sale of hot and cold food for consumption on and off the premises) (1 No. to include a drive-thru facility), associated seating area, back of house areas, circulation spaces, and a substation/switch room (8 sq m); and the construction of an EV Charging Hub (consisting of 8 No. EV charging spaces, a canopy, ancillary plant, and substation). The development will also consist of revisions to the overall site layout resulting in: 23 No. car parking spaces (in addition to the EV Hub spaces); motorbike and bicycle parking spaces; revised vehicular circulation; relocated water and air services, offset fills and vents; external lighting; provision of an outdoor seating area; changes to levels, hard and soft landscaping, including revised boundary treatments; associated site servicing (water supply, foul and surface water drainage including surface water attenuation measures); all other associated site development works above and below ground. The development will also consist of 24 No. signs: 1 No. replacement 8.2 m high double-sided internally illuminated totem sign; 1 No. 4.8 m high double-sided internally illuminated freestanding sign; 8 No. charge point signs at the EV Hub; 9 No. signs fixed to the forecourt building (3 No. of which are illuminated); 2 No free-standing signs; 3 No. fixed signs. The proposed development also proposes to alter Condition No. 10 of KCC Reg. Ref. 04/2631, “The proposed café/ take – away hours of operation shall be 07.00 to 21.00. Reason: In the interests of the preservation of residential amenities and the proper planning and sustainable development of the area.”, to allow for the operation of the cafe/restaurants (including drive-thru) from 06.30-00.00 Monday to Thursday, and 24 hours Friday to Sunday. The development will also consist of a single storey temporary structure (72 sq m) to accommodatGrounds not yet categorised
    Decision28 April 2025View record
  12. © OpenStreetMap
    2460708Granted

    Mullafarry and Tawnaghmore Upper, Killala, Co. Mayo

    The construction of a single data centre building located to the north of the site, with an overall gross floor area of c. 29,076 sq.m across two levels and an overall maximum height of c. 22.764m at parapet level. The data centre building includes data halls and associated electrical and mechanical plant rooms (c. 23,908 sq.m), an administrative and staff services block (c. 5,052 sq.m) and circulation and stairs (c. 116 sq.m). 2 no. external terraces are proposed to the east of the building (c. 309 sq.m) and an external generator yard to the south of the building (c. 5,205 sq.m) accommodating 25. no. backup / dispatchable generators and associated flues (to a height of c. 21.164m) within an enclosed compound. The construction of a sprinkler tank and pump house to the northeast of the site, the sprinkler tank is an overall height of c. 7.2 m and the pump house is a single storey building with an overall height of c. 4.15m and area GFA of c. 40.23 sq.m. The construction of an entrance hut at the main access to the south of the site, the hut is an overall height of c. 3.225m and area GFA of c. 11.6 sq.m. Construction of 2 no. site access points from the south and internal road network and circulation areas, footpaths, cyclist infrastructure, the provision of 56 no. car parking spaces (including 12 EV charging spaces and 7 disabled spaces, 3 of them EV), 20 no. cycle parking spaces, hard and soft landscaping and planting, site lighting, PV panels and plant at roof level, foul water connection connecting to existing WWTP in Killala Business Park, boundary treatments, green walls and all associated and ancillary works including underground foul and storm water drainage network and utility cables and all ancillary works and services. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.Decision record indexed
    Decision25 April 2025View record
  13. © OpenStreetMap
    2560061Refused

    2 Munster Ave, Claddagh, Galway

    Permission for development which consists of: demolition of part of front boundary wall to widen access to dwelling and provision of one number car parking space with electric charging point with all associated siteworks.Grounds not yet categorised
    Decision25 April 2025View record
  14. © OpenStreetMap
    24/6216Granted

    Gortnahomna More Castlemartyr Co.Cork

    Permission for the following Large-scale Residential Developments (LRD) comprising of the construction of 150 no. residential units, 1 no. creche, 2 no. ESB substations and all associated development works including footpaths, cycle paths, car and bicycle parking, drainage, fencing, bicycle and bin stores, lighting and landscaping/amenity areas. Access to the site will be via a new vehicle access point and pedestrian/cycle connection from the existing N25 Killeagh Road. A Natura Impact Statement is submitted to the planning authority with this application. The application may be inspected online at the following website set up by the applicant: www.gortnahomnamorelrd.ieDecision record indexed
    Decision24 April 2025View record
  15. © OpenStreetMap
    2560165Granted

    Applegreen Clondrinagh Service Area, Clondrinagh Roundabout, Co. Limerick

    A high-power electric vehicle charging hub & associated infrastructure, consisting of the following: i) installation of 4no. electric vehicle bays, (ZEVI compliant) & 4no. charging points (powered by 100% renewable energy), (ii) new modular ESB substation & (iii) landscape renewalDecision record indexed
    Decision24 April 2025View record
  16. © OpenStreetMap
    WEB1397/25Refused

    63, Palmerston Road, Dublin 6, D06 R6C2

    PROTECTED STRUCTURE: Permission for the development at 63 Palmerston Road, Dublin 6, D06 R6C2 (a Protected Structure). The development will consist of a new vehicular entrance (c. 3m wide) in the form of swing gates; 3 no. car parking spaces (5m x 3m each); an electric vehicle charging point, and associated site development works.Grounds not yet categorised
    Decision24 April 2025View record
  17. © OpenStreetMap
    2460205Granted

    In the townlands of Ballybar Lower Ballybar Upper, Ballycarney Ballyloo, Linkardstown Park and Tinryland

    A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application36 conditions indexed
    Decision24 April 2025View record
  18. © OpenStreetMap
    2460467Granted

    Braghan Point, Termonfeckin Road (R167), Baltray

    Permission for the construction of 14 no. detached 2-storey dwellings. 13 no. of the proposed dwellings are located in the eastern portion of the site with 1 no. dwelling located to the west. All proposed dwellings will be of a similar design and finish to existing dwellings within ‘Braghan Point’. The proposed development also provides for all associated site development works, in addition to public lighting, landscaping and boundary treatments. Vehicular access to the proposed development is via the existing access point off the Termonfeckin Road (R167). A new pedestrian and cyclist connection is also proposed along the eastern site boundary, providing access between the Braghan Point development and the public road to the east *Significant Further Information Received on 01/04/2025 - 13 Units Proposed*Decision record indexed
    Decision17 April 2025View record
  19. © OpenStreetMap
    2560075Granted

    South of the Kilkenny IDA Business and Technology Park Ring Road, Loughboy Kilkenny, Co. Kilkenny

    The site is situated to the west of the Bohernatounish Road (and of existing buildings within the Business and Technology Park), to the east of the Outrath Road and Loughboy Industrial Estate, and to the south of the Kilkenny Ring Road(N10) and an existing office development. Permission is sought for the following development: • Expansion of the existing Central Utilities Building compound to facilitate construction of 38kV substation (as required by the ESB) to accommodate 2 no. electrical transformers, a single storey client switchroom building (with a parapet height of c.5.8m), and a single storey control room building (with a parapet height of c. 5.8m).• The control room building will accommodate a gas insulated switchgear room, control room, battery room, storeroom and WC. • The development includes all associated landscaping and ancillary works, services, protection masts, and boundary treatments. Retention permission is sought for the following alterations to the development permitted under Reg. Ref.: 22/662:• Amendments to the permitted industrial building including to the building footprint and the area of the ancillary office space and reception / dining areas (resulting in a decrease of c. 593 sq.m. in gross floor area (GFA) in total).• Associated amendments to the internal layout of the industrial building, to the building facades (including alterations to entrance / exit doors and fenestration), and roof plan (including rooflights), and the location of ancillary structures and landscaping in the vicinity of the ancillary office area, to reflect the altered building layout. • Relocation of one stair core along the northern building façade southward to sit within the massing of the building. • Construction of a of pump house, tanks for rainwater harvesting, smoking shelter, provision of a gabion wall around the outdoor dining area, omission of waste storage structure, relocation of pallet storage to the northeastern corner of the service yard, and relocation and alterations to permitted signage (including the omission of building signage on the southern elevation, provision of signage to the northern, western, and eastern elevation, campus and directional signage, and 3 no. flagpoles adjacent to the southern site entrance). • Amendments to the northern access point to the site, to remove the permitted vehicular access and provide for pedestrian and cycle access • Amendments to the Central Utilities Yard including relocation of 2 no. sprinklerDecision record indexed
    Decision17 April 2025View record
  20. © OpenStreetMap
    2560136Granted

    Poppyfield Retail Park, Cahir Rd Ballingarrane, Clonmel Co. Tipperary

    An Electric Vehicle (EV) Charging Station, a site of ca. 0.017ha. The development will consist of 4 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 8 no. charging points. The charging bays will be located in the existing car park replacing 10 no. standard parking bays with 8 no. EV charging bays. It is proposed to erect an ancillary building to house an ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary worksDecision record indexed
    Decision16 April 2025View record
  21. © OpenStreetMap
    SD19A/0346/EPGranted

    Airton House, Airton Road, Tallaght, Dublin 24

    Change of use and conversion of an existing vacant two storey office building to provide 38 residential accommodation units to be used as a family hub; 16 units at ground floor level and 22 units at first floor level; with communal kitchen facilities, storage space, family rooms, internal play spaces, staff and ancillary rooms at ground and first floor level; external playground; 19 bicycle spaces and 45 car parking spaces located at ground level; associated site works, services, paving, planting, landscaping, lighting and new boundary walls and fencing; revisions to the existing foul and surface water drainage networks and new tree pit attenuation zones; new boundary treatment; construction of 3 outbuildings and modifications to the existing elevations including the addition of new windows on the rear elevation and rear block; vehicular, pedestrian and cycle access to the development will be maintained via the existing access point on Airton Road. Retention is sought for minor new and altered window arrangements to the north (front) and west (side) elevations.Decision record indexed
    Decision16 April 2025View record
  22. © OpenStreetMap
    D24A/0892/WEBGranted

    Point Lobis, Henley Court, Churchtown, Dublin 14

    The development will consist of the demolition of an existing two storey apartmDecision record indexed
    Decision16 April 2025View record
  23. © OpenStreetMap
    2560057Granted

    Lands at Billis and Drumalee Townlands, Cootehill Road, Cavan Town

    The development will consist of the provision of a total of 134no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 109no. residential dwellings which will consist of 6no. 1bed units, 39no. 2 bed units, 59no. 3 bed units and 5no. 4 bed units. The residential dwellings range in height from one to two storeys. (c) The provision of a total of 25no. duplex apartment units consisting of 15no.1 bed units and 10no. 2bed units. The duplex apartment units range in height from two to three storeys. (d) Provision of a single storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h)The provision of an internal culvert along with decommissioning of existing drainage channel within the site. Culvert works to include for provision of a headwall at the outfall to the watercourse. (i) Creation of a new access point from the public road with associated works to include for a connections to the existing public footpath along with a pedestrian crossing point. (j) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required. (k) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (l) Internal site works and attenuation systems which will include for provision of a hydrocarbon and silt interceptor prior to discharge. (m) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul via a rising main and provision of a foul pumping station, water connections and ESB network connection to include for provision of a substation. A Natura Impact Statement (NIS) has been preparedDecision record indexed
    Decision16 April 2025View record
  24. © OpenStreetMap
    2560152Granted

    Applegreen Motorway Service Area, Junction 7 (M7), Lackanavea Birdhill Co. Tipperary

    A high-power electric vehicle charging hub & associated infrastructure, consisting of the following: (i) installation of 8 no. electric vehicle bays & 4 no. charging points (powered by 100% renewable energy), (ii) installation of new canopy with associated illuminated signage, (iii) new modular esb substation, (iv) landscape renewal & (v) revised parking bay markings (zevi compliant).Decision record indexed
    Decision15 April 2025View record
  25. © OpenStreetMap
    2560067Granted

    Ballyweelin, Rosses Point, Sligo

    Retention of existing dwelling house and all associated works which differs in plan and elevation from that permitted under PL 74/4703. The development consists of an existing structure to be retain which serves as a residential single family dwelling with all associated worksDecision record indexed
    Decision15 April 2025View record
  26. © OpenStreetMap
    4278/24Granted

    5 and 6 Malahide Road, Newtown Cottages, Priorswood, Dublin 17 D17ND25 and D17N634

    The proposed development will consist of the demolition of 2 no. single storey existing bungalow dwellings on the site (c.203.3 sq.m. GFA total) and the construction of a new apartment building ranging in height from 5-6 storeys comprising of 32 no. 'Housing for Older People' one bedroom apartment units. The development also proposes c.578 sq.m of communal amenity space (c.555 sq.m landscaped communal open space and c.23 sq.m internal communal amenity area), photovoltaic panels at roof level, balconies/terraces associated with individual apartment units, secure bicycle parking serving the apartments (32 no. spaces), bicycle parking for visitors (16 no spaces), surface level car parking (9 no. spaces 1 no. of which is a mobility-impaired car parking space), bin storage, ESB substation and switch room, boundary treatments, hard and soft landscaping and all other associated site works above and below ground on an overall site area of c.1,910 sq.m. Vehicular and pedestrian access to the development is proposed from new access points along Malahide Road.Decision record indexed
    Decision14 April 2025View record
  27. © OpenStreetMap
    2560232Granted

    CABRY, QUIGLEY'S POINT, LIFFORD PO

    DETACHED GARAGE GRANTED PERMISSION UNDER PLANNING REF. NO. 02/4042 AND PERMISSION FOR (1) DEMOLITION OF EXISTING DETACHED DORMER BUNGALOW DWELLING HOUSE, DAMAGED DUE TO DEFECTIVE (MICA) PRECAST CONCRETE BLOCKS AND (2) CONSTRUCTION OF A REPLACEMENT DETACHED, TWO STOREY DWELLING AND ALL EXISTING ASSOCIATED SITE SERVICES AND SITE BOUNDARY TREATMENTS TO BE RETAINED FOR THE PROPOSED REPLACEMENT DWELLINGDecision record indexed
    Decision10 April 2025View record
  28. © OpenStreetMap
    2460829Granted

    Land at Slievenamon Road and Thurles Relief Road, Thurles, Co. Tipperary

    The development of a single storey drive-thru restaurant including the ancillary sale of hot food for consumption off the premises with an associated corral area, elevational signage, modifications to existing vehicular access off the Thurles Relief Road, car parking including accessible parking spaces, grill bays, EV charging spaces, bicycle parking, a height restrictor, customer order points with associated canopies, totem signage, free-standing signage, banner frames and digital menu boards, ESB substation and kiosk, landscaping including outdoor furniture/seating area with parasols, boundary treatments, lighting, and all associated site and engineering works necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and is submitted to the planning authority with the applicationDecision record indexed
    Decision09 April 2025View record
  29. © OpenStreetMap
    2560131Refused

    Barrack Road, Castledermot, Co. Kildare

    For a residential development at Barrack Road, Castledermot, Co. Kildare, on a site area of c.1.24Ha, consisting of 45 no. dwellings. The proposed development is comprised of 12 no. 2 & 3 storey, 3 & 4 bed detached, semi-detached & terraced houses, 22 no. 2 and 3 bed apartments and duplex units accommodated in 2 no. 3 storey buildings and 11 no. 1 and 2 bed apartments accommodated in 1 no. 3 storey building. The proposed development also provides for 2 no. vehicular access points off Barrack Road, and all associated site development works, open spaces, including hard & soft landscaping & boundary treatments, car parking, bin & bicycle storage, etc. A Natura Impact Statement (NIS) has been prepared in respect of the development proposal and accompanies the applicationGrounds not yet categorised
    Decision09 April 2025View record
  30. © OpenStreetMap
    2538Granted

    Potters Point, Brittas Bay, Co. Wicklow

    Erection of 108.80m² side extension to existing 261.12m² shed, along with all associated site development worksDecision record indexed
    Decision08 April 2025View record
  31. © OpenStreetMap
    D24A/0999/WEBGranted

    The Pottery, Baker’s Point, Pottery Road, Dun Laoghaire, Co. Dublin

    Works to the existing four-storey over basement level mixed-use block comprisinDecision record indexed
    Decision07 April 2025View record
  32. © OpenStreetMap
    24399Granted

    Breaffy South, Spanish Point, Co Clare

    Of the following a) the alterations to the rear extension granted under P07/513 b) the front boundary wall and site entrance as constructed along with associated site worksDecision record indexed
    Decision04 April 2025View record
  33. © OpenStreetMap
    2560055Granted

    Applegreen Motorway Service Area, Jordanstown, Paulstown

    For development of a high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle bays & 4no. charging points powered by 100% renewable energy, (ii) installation of new canopy with associated illuminated signage, (iii) new modular ESB substation, (iv) associated revisions to existing parking bays including relocation of lighting columns, landscape renewal with native tree species and revised parking bay markings (ZEVI compliant)Decision record indexed
    Decision02 April 2025View record
  34. © OpenStreetMap
    25/4148Granted

    Watergrasshill Business Park Meenane Watergrasshill Co. Cork

    The construction of four number strategic logistical, storage and distribution warehousing / light industrial units in four number buildings on 4no. serviced sites, incorporating office accommodation within, ESB sub-station, 2no. sprinkler tanks, 3no. security kiosks, 4no. bicycle shelters, associated site signage (12no. 1.5m high totem signs to serviced sites and 2no. curved entrance signs), at existing site entrance to the existing public road, 7no, access points off existing internal site roads, site levelling and contouring and the site will be filled with a suitable material in order to achieve the required levels. The material in question will be sourced from suitable locations, and will be regularised by way of a waste permit application or certificate of registration to the local authority as required, 4no waste compactors, truck loading, hard standing and truck parking bay areas, 162no. parking spaces to include 146 regular and 8no. disabled spaces, 8no, electric car charging points and all other ancillary and associated site development works including landscaping. Extension of Duration to Permission granted under Planning Ref. No. 19/06770.Decision record indexed
    Decision01 April 2025View record
  35. © OpenStreetMap
    2460085Granted

    No. 13 Granby Terrace, Granby Row, Carlow

    The sub-division of an existing property, the construction of a new vehicular entrance, the construction of a two storey dwelling, connection to services and all associated site works12 conditions indexed
    Decision01 April 2025View record
  36. © OpenStreetMap
    WEB2214/24Granted

    Site of approx. 0.09 ha on lands at Fegan's, 13-18, Chancery Street and 1-1a St. Michan's Place, Dublin 7, D07 A275

    The site is generally bounded by a Dublin City Council car park and multi-use games area to the north; Chancery Street to the south; 19-20 Chancery Street and St. Michan's Place to the west; and 8-12 St. Michan's Street and St. Michan's Street to the east. The development will consist of: a) The demolition of all existing buildings and structures on site (1-4 storeys) including reconfiguration of part basement level (total GFA approx. 1,794 sq m) and the construction of a 7 - 8 storey (approx. 26.4 m overall height) over part basement level building (total GFA approx. 5,635 sqm) accommodating 12 no. residential apartment units (approx. 1,180 sq m) and a 96 no. bedroom tourist hostel (approx. 4,455 sq m) with additional plant, tank room and ESB substation. b) The 12 no. residential apartment units will consist of 6 no. 1-bed units and 6 no. 2-bed units located across first to sixth floor level, each with an associated private open space area in the form of a balcony. Pedestrian access to the residential apartment units is proposed via St. Michan's Street. Communal open space (approx. 76 sqm) for the residential units is provided at seventh floor level in the form of a roof terrace. A total of 28 no. bicycle parking spaces are proposed for the residential units (22 no. at basement level and 6 no. at ground floor). c) Provision of a 96 no. bedroom tourist hostel accommodating 599 no. bedspaces in a mixture of accessible, twin and 4 - 10 no. person bedrooms from first to seventh floor level. The hostel development will comprise a reception / lobby amenity area with ancillary café / bar / co-working space (with a main entrance via Chancery Street and secondary service entrance points at Chancery Street, St. Michan's Place and St. Michan's Street) (approx. 196 sq m), a gym (approx. 54 sq m), staff office (approx. 9 sq m) and a WC, luggage area (approx. 8 sq m), a kitchen (approx. 32 sq m), food and beverage area (approx. 12 sq m), laundry store (approx. 12 sq m), comms room (approx. 1o sq m), bicycle store (approx. 14 sq m) providing for 20 no. bicycle spaces, refuse store (approx. 35 sq m), plant level (approx. 38 sq m) with generator, tank room (62 sq m) all at ground floor level. The first floor level will accommodate a guest kitchen / dining area (approx. 79 sq m), cinema room (approx. 33.5 sq m), guest laundry room (approx. 35 sq m), staff lounge (approx. 24 sq m), staff room (approx. 22 sq m) and linen store (approx. 7 sq m). Additional linen stores are proposed from second to seventh floor levels. d) Reconfiguration of the existing basement level (approx. 115 sq m) is proposed to accommodate a new tank / plant room and a bicycle store (approx. 54 sq m). The development will also provide for all associated site development works and infrastructure including ESB substation and switch room (approx. 30 sq m), green roofs, roof plant, PV panels, site services and connections for foul drainage, surface water infrastructure and water supply.Decision record indexed
    Decision31 March 2025View record
  37. © OpenStreetMap
    2527Granted

    Newcastle Garage & Filling Station, Greenogue Blackditch, Newcastle

    Extension of existing retail outlet including retail space, café and seating area. New toilet facilities. Outdoor seating areas. Alterations to front elevation of service station. Revised car parking including the provision of a service area and electric vehicle charging points. New electric access gates. New security fence. Alterations to roadside boundariesDecision record indexed
    Decision31 March 2025View record
  38. © OpenStreetMap
    2560033Granted

    Galway Clinic, Doughiska, Galway

    Permission for development which consists of; we, to upgrade the entrance / access serving Galway Clinic, an adjacent section of Local Road 5038 and all associated works The proposed development comprises the following: • Alteration and upgrade of the entrance / access to Galway Clinic to include a section of road realignment with the incorporation of a mini-roundabout, comprising a total development area of 1869 sq. m; • Alterations and upgrade of the existing pedestrian pathway network to accommodate improved pedestrian access; • Provision of pedestrian crossing points, tactile paving, dropped kerbs, bollards, landscaping, road markings and road signage ancillary to the upgrades to the entrance and section of Local Road 5038; • All associated site development works necessary to facilitate the proposed development.Decision record indexed
    Decision28 March 2025View record
  39. © OpenStreetMap
    2560045Granted

    Island Point Tralee Road Industrial Estate, Tralee Road Moanmore, Castleisland Co.Kerry

    (A) Retention permission to retain existing temporary storage containers on site during construction period. (B) Permission to construct an external storage building ancillary to existing on site building with all associated site works and landscaping..Decision record indexed
    Decision27 March 2025View record
  40. © OpenStreetMap
    2460414Granted

    Ballymurtagh, Shannon Free Zone West, Shannon Co. Clare

    For development which consists of the construction of two light industrial facilities with ancillary office space, yard spaces, refuse stores with carparking, bicycle parking, ESB substations, switch room and associated site works. Permission is sought for Building 01 the industrial and office facility to have the flexibility to be subdivided as follows: Option A: One No. Unit (Area: 3905m²) with Ancillary Yard and Refuse/Plant Store. Option B: Two No. Units (Units 01 Area: 1953 m²) (Unit 02 Area: 1952m²) with Ancillary Yards and Two No. Refuse/Plant Stores. Permission is sought for Building 02 the industrial and office facility to have the flexibility to be subdivided as follows: Option A: One No. Unit (Area: 6010m²) with Ancillary Yard and Refuse Store. Option B: Two No. Units (Units 01 Area: 3985m²) (Unit 02 Area: 2025m²) with Two No. Ancillary Yards and Two No. Refuse Stores. Option C: Three No. Units (Area Unit 01: 2025m² / Area Unit 02: 1960m² / Area Unit 03: 2025m²) with Three No. Ancillary Yards and Three No. Refuse Stores. Other works include the provision of 286 No. carparking spaces which include accessible spaces, EV charging areas and set-down areas with vehicular and HGV access points to the perimeter of site. Secure bicycle parking spaces, refuse stores with roof level and site level external service areas, roof and ground mounted photo voltaic panels, building signage with all ancillary landscaping and associated site works and services. The planning application is accompanied by a Natura Impact Statement.Decision record indexed
    Decision27 March 2025View record
  41. © OpenStreetMap
    2560096Granted

    Cloonascragh, Tuam, Co. Galway

    For a ten-year planning permission for an electrical transformer compound comprising (i) a hardcore surfaced compound with a footprint of approximately 1300m2 enclosed by a 2.6m high palisade security fence and security gates, (ii) a control room with a gross floor area of approximately 140m2, (iii) a 110kV electricity transformer, with associated equipment including cable sealing end, surge arrestor, earth disconnect, current/voltage transformer, house transformer, circuit breaker and lightning mast, (iv) a diesel generator for emergency lighting, (v) the upgrade of an existing access point from the L6141 and the construction of approximately 130m of access track, (vi) underground electrical and communications cabling, (vii) underground electrical cable connecting the transformer compound to the electrical cable permitted as part of the Tuam Energy Park (Galway County Council Planning Register Reference 20/1387) and (viii) all associated and ancillary site development, landscaping and reinstatement works. A Natura Impact Statement will be submitted to the Planning Authority with the applicationDecision record indexed
    Decision26 March 2025View record
  42. © OpenStreetMap
    2560040Granted

    Washington House, Cregg Rosses Point, Co. Sligo

    Re-construction of an outdoor pergola area to include glazing, replacement of existing front door and entrance gate, and all associated worksDecision record indexed
    Decision25 March 2025View record
  43. © OpenStreetMap
    3040/25Granted

    7 Belgrave Square East, Rathmines, Dublin 6, D06DY90

    PROTECTED STRUCTURE: Creation of two new window opes and two new windows to front, conversion of window ope to doorway ope to rear and new door and frame, solar panels on two roof slopes, repointing of front elevation using lime mortars in place of existing non-original cementious pointing and all associated site development works.Decision record indexed
    Decision25 March 2025View record
  44. © OpenStreetMap
    WEB2248/24Granted

    Saint Assam's Community Hall, Saint Assam's Church, Howth Road, Dublin 5

    PROTECTED STRUCTURE The development will consist of: The renovation, refurbishment and extension of the existing Protected Structure to provide for an upgraded Sports Club facility. Proposed works to the existing Protected Structure are inclusive of: (1) demolition of the existing non-original 20th century single-storey toilet block extension to the south of the main building; (2) removal of existing internal staircase from ground to first floor levels including false ceiling over, and infilling of the stair void with a new timber floor to match existing; (3) removal of non-original stud partition walls at ground and first floor levels and removal of existing internal door openings at ground and first floor levels; (4) removal of existing fire escape stair at the southwestern corner of the building and the provision of a new fire escape stair in its place; (5) internal reconfiguration at ground and first floor levels of the existing building, including the addition of new stud partition walls and internal door openings to accommodate a Gym, a Club Social Hub, and a Club Office all at ground floor level; and a Sports Hall and Club Meeting Room at first floor level. Internal works at first floor level are also inclusive of: (6) remedial works to existing timber floor where required; remodelling of timber floor projecting into window bays along the north elevation, cutting back the floor to form a void and installation of aluminium fire-rated glazing; and remodelling of existing non-original fire escape door to the south elevation. External works to the existing Protected Structure include: (7) removal of modern brickwork to allow for a new window in the existing oculus opening over the arch on the western elevation; (8) remodelling of 3 no. existing window openings to the southern elevation at ground floor level to form 2 no. arched door openings and 1 no. arched window opening; (9) remodelling of 3 no. existing window openings to the southern elevation at first floor level, with one opening to be removed and 2 no. arched door openings being created; (10) repointing of stone work using lime pointing where required; (11) removal of existing aluminium gutters and replacement with new cast aluminium gutters; (12) at roof level, removal and replacement of slates and felt covering to roof over entrances on the southern and northern elevations; and removal of a number of slates to the main roof to allow for inspection and replacement of wall plate and rafter ends where necessary. The proposed development will also provide for: (13) the construction of a 2-storey flat roofed extension to the south of the existing Protected Structure, with an enclosed plant area at roof level. Internally the extension will comprise an entrance lobby, commercial unit, storage space and bathroom facilities (including an accessible W.C), all at ground floor level. Access to the first-floor level is available via a new internal platform lift and stairs, with the first floor level comprising wellness/treatment rooms for club use, shower facilities, a plant room and circulation space; (14) the proposed extension will be connected to the Protected Structure via 3 no. inter-connecting doorways at ground floor level and 2 no. inter-connecting doorways at first floor level. These linkages will comprise frameless structural glazing with internal glass fins; (15) the main pedestrian access to the premises is proposed off Main Street to the east via the existing double gates, a new stair access and platform lift are proposed inside this access. A bicycle parking entrance and fire escape are available along the north-western site boundary, and a secondary entrance and fire escape to the Protected Structure is available along the northern site boundary. The following works are also proposed: (16) provision of outdoor seating; (17) provision 16 no. bicycle parking spaces to the north of the Protected Structure in the form of Sheffield stands; (18) provision of new club signage on the eastern elevation of the proposed extension; and, (19) associated site and infrastructural works which include; foul and surface water drainage, hard and soft landscaping, boundary treatments, provision of solar PV panels at roof level, internal mechanical and electrical works, lighting, bin storage and all associated site works necessary to facilitate the development. The subject property, Saint Assam's Community Hall, Saint Assam's Church, is a Protected Structure.Decision record indexed
    Decision25 March 2025View record
  45. © OpenStreetMap
    2460341Granted

    1.163 hectare site at the junction of N10 Waterford road and Waterford Road, Kilkenny Business Park, Springhill Kilkenny

    The provision of a motor sales and service facility comprising; Building ‘A’, single storey motor sales showroom and service workshop facility with associated ancillary spaces, with a total gross floor area of 1,713 sq.m. (maximum height of c. 8m) and Building ‘B’, single storey motor valeting and wash facility, solely for use as part of the vehicle serving business, with a total gross floor area of 350 sq.m. (maximum height of c. 5m). The development will also include: illuminated signage on the building facades; 2no. free-standing double-sided illuminated pylon sign; 3 no. flag poles with double-sided flags; realignment of the existing site entrance, customer and staff car parking; bicycle parking; new and used vehicle display parking; vehicle storage area and service parking; electric vehicle charging points; associated lighting; hard and soft landscaping including the provision of boundary treatments; SUDs measures; associated site servicing (foul and surface water drainage and water supply); and all other site excavation and development works above and below ground.Decision record indexed
    Decision21 March 2025View record
  46. © OpenStreetMap
    SD25A/0013WGranted

    Belgard Retail Park, Belgard Road, Tallaght, Dublin 24

    Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.Decision record indexed
    Decision21 March 2025View record
  47. © OpenStreetMap
    2560029Granted

    Manor West Retail Park, Tralee, Co. Kerry

    Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at the Manor West Retail Park, Tralee, Co. Kerry, a site of ca. 644 sqm (ca. 0.06 ha). The development will consist of 6 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 12 no. charging points / bays, and 1 no. 10 bay canopy structure with integrated roof level solar panels of 120 sqm. The proposed development also incorporates 1 no. ESB substation, the use of an existing point of access / egress and all associated above and below ground ancillary works.Decision record indexed
    Decision20 March 2025View record
  48. © OpenStreetMap
    2462074Granted

    TROMATY, QUIGLEY'S POINT, LIFFORD PO

    INSTALLATION OF A 21 METRE LATTICE TELECOMMUNICATIONS ANTENNAE SUPPORT STRUCTURE CARRYING ANTENNAS SUPPORTED BY CRUCIFIX SOLUTION, DISH, REMOTE RADIO UNITS (RRU'S), TOGETHER WITH GROUND BASED EQUIPMENT CABINETS, MINI PILLAR, GANTRY POLES, GPS BEACON, PALISADE FENCING, CONCRETE FOUNDATION AND ALL ASSOCIATED SITE DEVELOPMENT WORKS TO PROVIDE FOR HIGH-SPEED WIRELESS DATA AND BROADBAND SERVICESDecision record indexed
    Decision20 March 2025View record
  49. © OpenStreetMap
    2460091Refused

    Dunleckney Maltings, Dunleckney Bagenalstown, Co. Carlow

    See public notices for full description of works
    Other
    Decision20 March 2025View record
  50. © OpenStreetMap
    3033/25Granted

    The Presbytery, 54-72 Gardiner Street Upper, Dublin 1

    PROTECTED STRUCTURE: (RPS. 3138) - The site is located at the junction of Gardiner Street Upper and Sherrard Street Upper, Mountjoy, Dublin 1. The proposed development will consist of the raking out and repointing of the brickwork to the front, rear and side facades of the building, including the three-storey structure to the rear and all chimneys using traditional tuck-pointing detail; cleaning of granite coping, cornice, cills and string course to all facades, cleaning of granite plinth to front railings, cleaning and re-pointing of limestone to rear facades and cleaning of lined plaster render to front and side elevation to the lower ground floor.Decision record indexed
    Decision19 March 2025View record
Showing 401-450 of 2,129
Page 9 of 20