Planning records
Showing 401-450 of 2,737 public recordsTo Extend the Appropriate Period of Planning Permission for P15-640 to restore, refurbish and extend existing farm dwelling house install waste water treatment system percolation area, and all associated site works.
To (a) construct front and side extensions, (b) convert attic space to accommodation including roof lights and rear dormer windows, (c) carry out internal renovations and external fenestration changes together with all site development works and services
Of a single storey kitchen extension and sheds to the rear of property
For refurbishment works to existing coastal defence embankments at Shannon Airport, Shannon, Rineanna South, Co Clare. The proposed works include different combinations of armouring, top-soiling and grassing along the embankments. A Natura Impact Statement has been prepared and is included in the application. An Environmental Impact Assessment screening report has been prepared and is included in the application. It concluded that an Environmental Impact Assessment is not required
To make alterations to the existing dwelling house to include the following; a) construction of front porch and covered canopy area, b) elevational alterations, c) construction of standalone private garage and d) associated site works
For the refurbishment of existing derelict dwelling and for the construction of an extension to same to comprise of kitchen/dining, bathroom and en-suite including ancillary site works
Of the following: 1 modifications to existing house. 2. construction of external shed to rear of property. 3. position of site entrance and associated works
The development consists of the erection of a 68m linear, glazed and covered passenger walkway from departure gates area 1-5 to aircraft parking stand 26B
For the demolition of existing metal framed cladded canopy within their lands at Shannon Airport and associated site clearance works along with all other site works to allow for future development on the site
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
The development consists of the construction of a slatted unit and associated site works
For the construction of a Dwelling House, wastewater treatment system and new entrance including ancillary site works
To A) RETAIN modifications to dwelling house, B) RETAIN site boundaries/site layout as constructed along with all associated site works and services. Original Planning Ref No. P90/309
For development which will consist of a single-storey extension to existing Gates 1 to 5 departures terminal, provision of external plant area and covered external circulation routes. Other works include minor elevational changes to adjacent areas and alterations to personnel access/egress locations and routes with all associated site works
For development which will consist of the demolition of existing single storey administration offices, consolidation/protection works to the western end of the shared services building, the removal and upgrade of the facade to the eastern end of the main terminal building over 2 no. stories, the reconfiguration of the existing Airside personnel and passenger entrance/egress locations, new security fencing, hard and soft landscaping, with the provision of wayfinding and branding signage, including all associated site works. Demolition works will be carried out within the curtilage of a Protected Structure (RPS No.: 328)
For development at both the Shannon College of Hotel Management Trust Building and the Shannon College of Hotel Management Food & Beverage buildings, located at Shannon Airport, Rineanna South, Shannon, Co. Clare, which will consist of the following: 1. Removal of all current signage on the exterior of both buildings. 2. Erection of 1 no. signage (5.89m x 2.745m) on the southeast elevation of the Shannon College of Hotel Management Food and Beverage Building. 3.Erection of 1 no. signage (14.505m x 1.86m) on the northeast elevation of the Shannon College of Hotel Management Trust Building. 4. Erection of 1 no signage (5.925m x 2.87m) on the southeast elevation of the Shannon College of Hotel Management Trust Building.
To construct a new dwelling house, private garage, site entrance, private wastewater treatment system and all associated site works and services
For the construction of a single storey extension to dwelling consisting of a family independent living unit, connection to existing waste water treatment system and all ancillary site works
To RETAIN the following: (a) to RETAIN separate Garage to rear of Dwelling House; (b) to RETAIN Sunroom to rear of Dwelling Housed) (c) to RETAIN Link between main House and converted Garage; (d) to RETAIN window which has replaced garage door to front
Of as constructed garage converted to foot clinic and all associated site works
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works. An Appropriate Assessment Screening Report and Natura Impact Statement have been prepared and included with the application
To fill the existing poor quality agricultural land with stone and soil in order to raise the level of the ground, including all ancillary site works
To construct a steel shed and all associated site works
For ground investigation (GI) works, to inform the option selection and design of the proposed Shannon Town and Environs Flood Relief Scheme at Rineanna South, Shannon, Co Clare. The objective of the GI works is to establish ground conditions within the study area and contribute towards the option selection process for the proposed FRS. The GI sites are primarily located within or adjacent to existing flood embankments on the edge of the River Shannon estuary in proximity to residential and industrial areas. The proposed preliminary GI works will consist of the following: a) 54 No Borehole Cable Percussion (BHCP) (shell and auger); b) 65 No. Rotary Cores; c) 62 No. Cone Penetration Tests (CPTS); and, d) 25 No. Groundwater Standpipes. This application is accompanied by a Natura Impact Statement (NIS)
To Extend the Appropriate Period of Planning Permission for P16-575 to construct a dwelling house, entrance, wastewater treatment system and all ancillary site works
Of an existing telecommunications support structure (previously granted under Plan Ref No. 06/2782 and ABP Ref PL03.224539) together with associated equipment cabinets and fencing
For a proposed development (planning permission for removal of existing signage and provision of new wayfinding and associated site works) to be located on lands at Shannon Airport, Rineanna South, Shannon, Co Clare. The development will consist of the removal of existing signage, provision of 4 No. new gantry signs, the provision of 5 No. new directional totem signs, new road directional signage and refurbishment works to existing gantries, directional signs, and all associated ancillary works
For a change of use from equine livery to dog kennelling
To construct a new two storey four bedroom dwelling house, together with a detached garage, new site entrance and on-site wastewater treatment system along with all other associated site works and services
Proposes to carry out the following development. The construction of a new housing estate development consisting of: a. 18 no. residential units comprising of: (1) 4 no. 1-bedroom apartments, i.e. Type A (2) 12 no. 2-bedroom apartments, i.e. Type B (3) 2 no. 3-bedroom apartments, i.e. Type C b. 27 ancillary car parking spaces within the development. c. The construction of pedestrian access point to the site. d. New Vehicular access point to the site. e. Connection to main sewer and watermain. f. Alterations to ground levels to accommodate the development. g. Surface water management will include attenuation and discharge to surface water network. h. All ancillary site works to include boundary and landscaping works. In accordance with the Habits Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development.
For development which consists of the construction of a slatted unit and associated site works
For the installation of a Fire and Rescue Training unit for the purpose of training fire fighting personnel. Also included in the development shall be a water network, controlled/initiated gas, drainage network, concrete hardstanding areas and all other associated site works.
For an extension of an existing car park at Shannon Airport, Rineanna South, Shannon, Co Clare. The proposed development will consist of the extension of an existing car park providing an additional 1051 parking spaces including a dedicated surface water drainage network, the re-alignment of airside /landside boundary security fence, the re-alignment of the internal perimeter road located airside, the relocation of the access to the wastewater treatment plant for maintenance purposes, the demolition of 10 industrial units and all ancillary associated site works. We note the protected structure NIAH reference 20406201 is located nearby to the proposed works and a Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the Planning Application.
For an Electric Vehicle (EV) charging hub. The development will consist of EV charging facilities for public and staff use, an ESB Substation, a pedestrian crossing, signage and all associated site works
For the construction of an extension to existing dwelling to comprise of kitchen/ dining room with internal modifications. We also intend to apply for permission to extend existing living room with changes to the facade including ancillary site works
Of (a) conversion of former garage to accommodation (b) construction of attached garage & (c) fenestration changes to the front & rear elevations, together with all associated site development works and services
On the grant of outline permission (Ref no P23-60235) the development will consist of a dwelling house with proprietary wastewater treatment system and percolation area together with ancillary site works
For the construction of a dwellinghouse, new vehicular entrance & proprietary waste water treatment plant including all ancillary site works
For the construction of a replacement Dwelling House to replace existing habitable but substandard dwelling and RETAIN existing dwelling to be used as domestic store. Also PERMISSION for new wastewater treatment system and utilise existing entrance with improvements to same including ancillary site works
For development, the development consists of the construction of a slatted cubicle unit and associated site works
For the construction of a domestic home fuel store and also RETENTION permission for existing portacabin to be used as an office to the north side of existing garage forecourt including ancillary site works
For development at Carrigoran Nursing Home, Newmarket-on-Fergus, Co Clare. The development will consist of 3 no. extensions to the existing Nursing Home to accommodate additional washroom, staff and storage facilities and all associated site works
For completion of construction of dwelling previously granted permission under planning application P03-1691 with all ancillary site development works and services
To alter finishes on the northern (front) elevation
To construct an extension to the side of the existing dwelling house
For development which will consist of (1) The demolition of existing on site storage buildings (2) The construction of a new single storey dwelling house, temporary septic tank, ancillary site works and connection to public services
For the construction of bay window, sunroom, kitchen, dining room, study, and garage as built including ancillary site works
Of extension constructed to existing dwelling consisting of kitchen, bathroom and bedrooms including ancillary site works and shed to the rear
For alterations to the elevations, site boundaries and site layout plan granted full planning permission under planning reference number P21/905
For the change of use of residential Chalet No. 1 to medical G.P. Clinic together with associated alterations