to
to

Planning records

Showing 401-450 of 1,861 public records
Page 9 of 20
  1. © OpenStreetMap
    23/4495Granted

    Shoulders Lane (to the rear of No. 6 Fair Street East) Mallow Co.Cork

    Permission for the construction of a 2-storey 2-bed town house with 3 no. roof lights to rear, and all associated site worksDecision record indexed
    Decision10 May 2023View record
  2. © OpenStreetMap
    22/4782Granted

    Shoulders Lane (to rear of no 6 Fair Street East) Mallow Co.Cork

    Retention permission for the partial demolition of existing derelict shed and Permission for the following: A) demolition of the remains of the existing derelict shed, and all associated site worksDecision record indexed
    Decision02 December 2022View record
  3. © OpenStreetMap
    20/5994Refused

    Shoulders Lane (to rear of No.6 Fair Street East) Mallow Co. Cork

    Retention permission for the partial demolition of existing derelict shed and permission for the following: a) demolition of the remains of an existing derelict shed, b) construction of a 2 storey building comprising of 1no. 1 bed apartment at ground floor and 1no. 1 bed apartment at first floor level, each with own private open area terrace/balcony and associated screening, 2 no. roof lights to rear, rear boundary wall and all associated site works.Grounds not yet categorised
    Decision06 November 2020View record
  4. © OpenStreetMap
    24/6169Granted

    St. Anthony's 41 Spa Glen Mallow Co.Cork

    Permission for the demolition of an existing front garden wall and entrance gateway and the erection of a new front garden wall with a repositioned entrance gateway and all associated site worksDecision record indexed
    Decision16 January 2025View record
  5. © OpenStreetMap
    21/5825Granted

    18 Hammond Place Newberry, Dromore Dromahane Mallow, Co. Cork

    To demolish existing garage and construct new single storey extension to dwelling house.Decision record indexed
    Decision05 August 2021View record
  6. © OpenStreetMap
    25/4498Granted

    Pepperhill Buttevant Co. Cork

    Permission to (a) construct a new dwelling house, (b) construct a new vehicular entrance, (c) install a new bored well and (d) install a new septic tank, percolation area and all associated site works.Decision record indexed
    Decision18 February 2026View record
  7. © OpenStreetMap
    21/6295Granted

    Ballyviniter Upper Mallow Co. Cork

    Permission for retention of a collecting yard and slatted channel, Construction of a milking parlour, dairy, slatted channel, plant room, cow return/animal handling area, silage slab, concrete apron and demolition of existing milking parlour, existing dairy, existing isolation pen and part of existing store and existing collecting yard, and associated works.Decision record indexed
    Decision12 October 2021View record
  8. © OpenStreetMap
    24/6457Granted

    Herlihy's Centra Main Street Mallow Co.Cork

    Permission for the following works: 1) alteration to shop front elevation, and all other associated site works.Decision record indexed
    Decision22 May 2025View record
  9. © OpenStreetMap
    20/5380Granted

    Fairgreen New Road Mallow Co. Cork

    Change of use from Bistro (Vacant Unit) and Retail (Vacant Unit), as previously approved under planning reference 55046/04 & 55020/09, to 1no. unit to be used as offices, where services will be provided to visiting members of the general public, being the ground floor of an existing 3-storey over basement mixed use building.Decision record indexed
    Decision25 November 2020View record
  10. © OpenStreetMap
    25/5413Granted

    Ballyviniter Upper Mallow Co Cork

    Permission for construction of a cubicle house, workshop, store and associated works.Decision record indexed
    Decision13 November 2025View record
  11. © OpenStreetMap
    20/6459Granted

    5 Cairn Woods Ballyviniter Lower Mallow Co. Cork

    Construction of a single storey extension to existing dwelling, along with associated site works.Decision record indexed
    Decision08 January 2021View record
  12. © OpenStreetMap
    24/5694Granted

    Numbers 1 & 2 Landscape Terrace Mallow Co. Cork

    Permission for change of use from office space to residential use, to include a total of three apartments, consisting of one 3 bedroom apartment on the ground floor of number 1 Landscape Terrace, one 2 bedroom apartment on the first floor, which spans across numbers 1 & 2 Landscape Terrace and one 2 bedroom apartment on the second floor, which spans across Numbers 1 & 2 Landscape Terrace and to carry out associated alterations to elevations of both buildings, as well as alterations to a section of the ground floor of number 2 Landscape Terrace to allow for revised stairs design.Decision record indexed
    Decision22 May 2025View record
  13. © OpenStreetMap
    22/5057Granted

    Lackendarragh Lombardstown Mallow Co. Cork

    To construct a dwelling, install a septic tank and percolation area, construct a detached domestic garage / store for use ancillary to the dwelling and carry out all associated site works.Decision record indexed
    Decision30 June 2022View record
  14. © OpenStreetMap
    20/6790Granted

    Sean Moylan Park Ballydahin Mallow Co. Cork

    Construction of an extension to an existing roof plant enclosure of an industrial building. The height will increase by three metre. No additional floor area is proposed. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence (P0247-02) issued by the Environmental Protection Agency.Decision record indexed
    Decision09 February 2021View record
  15. © OpenStreetMap
    23/4647Granted

    Ballyviniter Upper Mallow Co.Cork

    Construction of a dwelling house, domestic garage, entrance, driveway, septic tank, percolation area and all associated site worksDecision record indexed
    Decision22 August 2023View record
  16. © OpenStreetMap
    23/6175Granted

    2nd Floor, Unit 1 Market Square, William O'Brien Street Mallow Co.Cork

    Permission on the 2nd floor of existing mixed use building for change of use of office space to residential to include 2 no. apartments and for permission on the 2nd floor for material alteration to existing internal stairway enclosure to accommodate same and all associated site worksDecision record indexed
    Decision21 December 2023View record
  17. © OpenStreetMap
    20/5906Granted

    Knockbarry Buttevant Co. Cork

    Construction of (a) cubicle house with slatted tanks, feeding passage and calving pens, (b) slatted soiled water storage tank.Decision record indexed
    Decision23 October 2020View record
  18. © OpenStreetMap
    21/4524Granted

    Unit 21, Market Square New Road Mallow Co. Cork

    The change of use of a former bank into a medical centre.Decision record indexed
    Decision26 April 2021View record
  19. © OpenStreetMap
    25/4912Granted

    Dromore Drommahane Co.Cork

    Permission to construct a cattle shed with slats over an existing open slurry tank, effluent tank and ancillary worksDecision record indexed
    Decision06 October 2025View record
  20. © OpenStreetMap
    20/4883Granted

    Unit No. 13 Market Square New Road Mallow, Co. Cork

    Change of use of the ground floor unit from the existing commercial/ retail use to office use. The proposed development consists of internal modifications to the ground floor unit and its incorporation into the existing principal office use of the building, signage and all ancillary site development works.Decision record indexed
    Decision15 July 2020View record
  21. © OpenStreetMap
    23/5828Granted

    116 Main Street Mallow Co. Cork P51FT04

    The development will consist of the indefinite retention permission of external works regarding the removal of the ATM, night safe and general blue Ulster Bank signage. Planning permission required for the following: 1) Permission to carry out works for the removal of the Ulster Bank projecting sign, raised letter signs (temporarily covered up) and blue shopfront signs. 2) Permission to carry out the removal of the panelling within the ATM window, and replace with glazing and framing to match existing. 3) Permission to carry out internal works for the removal of the ATM, Loose furniture, Ulster Bank signage and merchandise on all floors.Decision record indexed
    Decision01 November 2023View record
  22. © OpenStreetMap
    21/5322Granted

    106 Cairn Woods Ballyviniter Lower Mallow Co. Cork

    A two storey extension to the side of the existing dwelling house and all associated site works.Decision record indexed
    Decision29 July 2021View record
  23. © OpenStreetMap
    24/4735Granted

    3 Gooldshill Ballydahin Mallow Co.Cork

    Permission (change of plan from that granted under planning reference no. 23/4252) for a two-storey extension to the side of dwelling, replace existing septic tank with a secondary wastewater treatment system and polishing filter and all associated site works.Decision record indexed
    Decision16 July 2024View record
  24. © OpenStreetMap
    23/4252Granted

    3 Gooldshill Ballydahin Mallow Co.Cork

    Two-storey extension to rear of dwelling, replace existing septic tank with secondary wastewater treatment and polishing filter and all associated site worksDecision record indexed
    Decision21 July 2023View record
  25. © OpenStreetMap
    21/6949Granted

    Castlecor Demesne Kilbrin Mallow

    1. Permission to demolish the existing rear extension and to construct a new extension to the rear of the existing dwelling house, 2. Retention of the existing domestic garage as constructed, 3. Retention of the existing partially constructed storage shed and completion of sameDecision record indexed
    Decision11 July 2022View record
  26. © OpenStreetMap
    21/6532Granted

    Ballybeg West Buttevant Co. Cork

    Retention of existing telecommunications support structure (previously granted permission under Pl. Ref. 06/9098) together with antennas, dishes, equipment cabinets, fencing and all associated site development works. The development will continue to provide high speed wireless broadband and data services.Decision record indexed
    Decision05 November 2021View record
  27. © OpenStreetMap
    23/4469Granted

    20 Russell Place Drommahane Mallow Co.Cork

    2 no. two storey semi-detached dwellings and all associated site development works, and the demolition of two existing shedsDecision record indexed
    Decision21 August 2023View record
  28. © OpenStreetMap
    20/5141Refused

    The corner of William O'Brien Street and Muddy Hil Mallow Co. Cork

    The development is located within the ACA (ACA-1) area and consists of the retention of works to include: 1) The change of use of the ground floor public bar, lounge and toilets into a retail unit and 2 No. apartments. 2) The change of use of the first-floor kitchen and lounge area into 3 No. apartments. 3) The change of use of second floor toilets and store into 1 No. apartment. The development also consists retention to the alteration to front/west elevation including an additional door serving the retail unit, alteration to decorative timber facade and signage and the replacement of ground floor windows and doors to aluminium.Grounds not yet categorised
    Decision30 July 2020View record
  29. © OpenStreetMap
    24/4795Granted

    25 Dromore Drive Ballydahin Mallow Co.Cork

    Permission for alterations to front and side of existing dwelling and for the construction of a single storey extension to the rear of same dwelling and all associated site worksDecision record indexed
    Decision17 January 2025View record
  30. © OpenStreetMap
    21/6413Granted

    Unit No. 17, Market Square Mallow Town Mallow Co. Cork

    Development comprising of change of use of the ground floor unit of No. 17 Market Square from the existing commercial/retail use to use as active community day service/meeting hub. The proposed development will also consist of internal modifications to the ground floor unit, new signage and all associated site worksDecision record indexed
    Decision07 December 2021View record
  31. © OpenStreetMap
    21/6061Granted

    66 and 67 Thomas Davis Street Mallow Co. Cork

    To alter and extend their existing butcher shop and to convert 1st. and 2nd floors into living accommodation. The development will consist of (1) the change of use of existing ground floor public house/late bar at 67 Thomas Davis Street to a retail butcher, commercial kitchen, delicatessen with associated staff facilities and storage, (2) the merging of ground floors at 66 and 67 Thomas Davis Street, (3) the installation of cold rooms and raw meat preparation areas, (4) alterations to elevations of 66 and 67 Thomas Davis Street to form a new shop front, (5) conversion and change of use of existing 1st and 2nd floor office and toilet spaces into 2no. 2 bedroom apartments with access to Thomas Davis Street, (6) removal of existing public house/late bar smoking room to rear of unit 67 Thomas Davis Street to include space in commercial kitchen and (7) all associated site works.Decision record indexed
    Decision28 June 2022View record
  32. © OpenStreetMap
    24/6244Refused

    108 Thomas Davis Street Mallow Co Cork

    Permission for retention of the change of use of the existing ground floor access hallway, access stairwell, 3 number first floor apartments and external common areas, 3 number second floor apartments and external common areas and 3 number third floor apartments and common areas (9 number apartments in total) from residential apartments to its current use as emergency accommodation for displaced person or persons seeking international protection along with all associated works.Grounds not yet categorised
    Decision24 March 2025View record
  33. © OpenStreetMap
    21/4521Granted

    No. 141 Cairn Woods Ballyviniter Lower Mallow Co. Cork

    Construction of extension to side of dwelling and alterations to the rear of dwelling and all associated site works.Decision record indexed
    Decision22 April 2021View record
  34. © OpenStreetMap
    23/4516Granted

    16 Avondale Park Ballydahin Mallow Co. Cork

    Permission for an extension and alterations to the existing dwelling and all associated site worksDecision record indexed
    Decision15 May 2023View record
  35. © OpenStreetMap
    21/4679Granted

    Ballyviniter Upper Mallow Co. Cork

    Construction of a livestock underpass, effluent holding tank and all associated siteworksDecision record indexed
    Decision10 May 2021View record
  36. © OpenStreetMap
    25/6582Granted

    No. 1A, Rosecourt, Muddy Hill, Mallow, Co. Cork.

    Permission for a change of use of existing ground floor retail unit for use as an extension to existing dental surgery practice and all associated site works and services.Decision record indexed
    Decision28 January 2026View record
  37. © OpenStreetMap
    24/5052Granted

    The Arches Bar & Restaurant Bellevue Ballydahin Mallow Co Cork P51 A386

    Permission for Retention of a single storey pavilion structure (floor area 203 sq.m) and will consist of two proposed acoustic lobbies (floor area 16.2 sq.m) which are located in the existing car park at the rear of The Arches Bar and Restaurant premises. The use of the pavilion structure is ancillary to the existing bar and restaurant use on the site. Permanent permission is being sought for the pavilion structure.Decision record indexed
    Decision31 March 2025View record
  38. © OpenStreetMap
    22/6384Refused

    The Arches Bar & Restaurant Bellevue, Ballydahin Mallow Co. Cork

    Retention of single storey pavilion structure (floor area 203sq.m) which is located in the existing carpark at the rear of the Arches Bar & Restaurant premises. The use of the pavilion structure as an events venue is ancillary to the existing bar & restaurant use on the site. Temporary permission is being sought for a period of 5 years for the pavilion structure.Grounds not yet categorised
    Decision13 December 2022View record
  39. © OpenStreetMap
    19/6229Granted

    Teagasc Offices Bellvue Ballydahin Mallow, Co. Cork

    Construction of single storey side office extension to existing Teagasc office building, removal/demolition of existing temporary office accommodation (including link corridor) and alterations to rear elevation of existing building and all associated site works.Decision record indexed
    Decision17 January 2020View record
  40. © OpenStreetMap
    24/4243Granted

    Spa Glen Mallow Co.Cork

    Permission for following Large Scale Residential Development (LRD) comprising the demolition of the existing farmhouse/buildings and the construction of 186 no. residential units, 1 no creche and all associated ancillary development works including the signalisation of the N72/L5331 junction to provide improved sightline visibility, amendments to part of the existing hedgerow along the N72 to improve sightline visibility, 2 no. vehicular access points, 1 no. toucan and 3 no. uncontrolled pedestrian and cycle crossing points on the L5331, footpaths, parking, drainage, landscaping/amenity areas and the undergrounding of existing 38KV overhead electricity lines. A Natura Impact Statement is submitted to the planning authority with this application.Decision record indexed
    Decision19 July 2024View record
  41. © OpenStreetMap
    21/7201Granted

    No. 134 Cairn Woods Ballyviniter Lower Mallow Co. Cork

    Permission for retention of adjoining canopy to rear of shed.Decision record indexed
    Decision27 January 2022View record
  42. © OpenStreetMap
    21/6442Granted

    St Gobnait's Park Ballydahin Mallow Co. Cork

    Permission for retention of foundations as constructed and permission for the erection of a single storey toilet block and storage building and associated site works.Decision record indexed
    Decision26 October 2021View record
  43. © OpenStreetMap
    22/5857Granted

    Knocknamona Glantane Mallow Co.Cork

    Construct a dwellinghouseDecision record indexed
    Decision03 October 2022View record
  44. © OpenStreetMap
    21/6950Granted

    Dromore Dromahane Mallow

    Construct a single-storey extension to the front, side and rear of the existing two-storey dwellinghouse, carry out internal and external alterations to the existing two-storey dwellinghouse, demolish 2 no. disused single-storey outhouses and carryout all associated siteworksDecision record indexed
    Decision14 December 2021View record
  45. © OpenStreetMap
    22/4806Granted

    77 Thomas Davis Street Mallow Co.Cork

    Permission for the re-construction and alterations of an existing mid terraced derelict building; with the works comprising of a ground floor retail unit and 2 no residential units ( 1 no. 1 bedroom apartment to the rear ground floor along with 1 no. 3 bedroom duplex apartment set out over the 1st and 2nd floors), Partial demolition of rear side section to allow for new 1st floor rear balcony and provision of bin store along with associated site worksDecision record indexed
    Decision03 April 2023View record
  46. © OpenStreetMap
    21/7173Granted

    Knocknamona Dromahane Co. Cork

    The demolition of existing derelict dwelling and construction of new dwelling house, domestic garage, entrance, driveway, septic tank, percolation area and all associated site works.Decision record indexed
    Decision25 May 2022View record
  47. © OpenStreetMap
    23/5904Granted

    Gooldshill Mallow Co.Cork

    Permission for dwelling, entrance, wastewater treatment plant, and all associated site worksDecision record indexed
    Decision31 May 2024View record
  48. © OpenStreetMap
    25/6157Granted

    Tesla EV Charging Hub, The Arches Bar & Restaurant, Bellevue, Ballydahin, Mallow, Co.Cork, P51 A386

    Permission for the development will consist of high-power electric vehicle charging points and associated infrastructure consisting of the following: 1) installation of 8 no. electric vehicle charging bays with 8 no. Tesla illuminated charging units and associated signage, 2) installation of proposed Tesla supercharger power cabinet equipment, 3) installation of proposed modular substation, 4) erection of associated EV signage, 5) all associated site development works including lighting & line marking.Decision record indexed
    Decision02 March 2026View record
  49. © OpenStreetMap
    22/5737Granted

    Hazel Brooke Spa Glen Mallow Co. Cork

    Installation of a 0.50m x 0.87m x 1.62m (LxWxH) above ground enclosure, to house a new natural gas District Regulating Installation including a 3m high ‘lamp post’ style relief vent stack with all ancillary services and associated site works to alter the network pressure.Decision record indexed
    Decision19 October 2022View record
  50. © OpenStreetMap
    21/5090Granted

    Muddy Hill Mallow Co. Cork

    Permission for retention of ground floor rear extension to existing two-storey store and office building. Also, permission for change of use of entire building from store and office to retail, including 1no. off-license retail and 1no. general retail on part of ground floor, and 1no. 3-bedroom apartment on part of ground and entire first floor. The proposed development also includes new first floor extension to proposed apartment, and elevational changes on all elevations including new access door to proposed apartment on side elevation and associated site works.Decision record indexed
    Decision31 August 2021View record
Showing 401-450 of 1,861
Page 9 of 20