Works to be retained consist of - 1) Waste Water Treatment System as constructed, 2) External Hot Tub as installed, 3) Retaining walls as constructed and associated adjusted levels and 4) Entrance Gate, Walls and Pillar as constructedGrounds not yet categorised
Development works as constructed including the main entrance, driveway and associated retaining walls, adjusted internal site levels, a domestic garage, installation of the existing WWTS, existing landscaping and boundary treatments and all associated site development worksDecision record indexed
EXTENSION OF DURATION of pl. file 19/341 - to construct new family home, septic tank, percolation bed, recessed entrance and all associated site works on landsDecision record indexed
Alterations made to a previously permitted dwelling (original planning ref. no. 98842). Alterations include provision of a first floor, increase of the overall ground floor area, and general alterations to the elevations to facilitate changes to the internal layout. To be done together with all associated site development worksDecision record indexed
SUICAVOUCH LANE, KNOCKROE, PASSAGE EAST CO. WATERFORD
Build a single storey, detached house and a detached garage. Together with all associated site development works, including the building of an entrance from the adjoining road (Suicavouch Lane) and also the installation of all necessary services, including the on-site disposal of foul drainage and also on-site provision of water through a deepwell pump and pressure setGrounds not yet categorised
To build a single storey, detached house and a detached garage. Together with all associated site development works, including the building of an entrance from the adjoining road (Suicavouch Lane) and also the installation of all necessary services, including the on-site disposal of foul drainage and also on-site provision of water through a deepwell pump and pressure set. All on their site atDecision record indexed
The construction of a new storey and a half dwelling house, new double garage area, new bored well, new waste water treatment system and percolation area, together with all ancillary and associated site worksDecision record indexed
INDEFINITE RETENTION of single storey outbuilding for ancillary uses to main dwelling, including office, playroom and fitness room, shower room and utility spaceDecision record indexed
Demolition of partially constructed two storey dwelling previously granted under planning reference 02/48 (An Bord Pleanala Ref. 24.129503), for the construction of a new two storey dwelling with attached single storey garage and a new treatment system with associated percolation area, all with associated site development worksDecision record indexed