ELEVATIONAL AND INTERNAL FLOOR PLAN CHANGES TO DWELLING PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 97/1708 AND ALL ASSOCIATED WORKSDecision record indexed
(1) DEMOLITION OF EXISTING TWO STOREY ANNEX TO EXISTING DWELLING, (2) REPLACEMENT WITH NEW TWO STOREY SAUNA AND YOGA ANNEX AND (3) CONSTRUCTION OF NEW COVERED LOG STORAGE/CARPORT TO EXISTING BOATHOUSE AND ALL ANCILLARY SITE WORKSDecision record indexed
COMPLETION OF DWELLING WITH EFFLUENT TREATMENT PLANT, ACCESS VIA EXISTING SHARED PRIVATE ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 19/51321Decision record indexed
DEMOLITION OF AN EXISTING DETACHED 1 ½ STOREY DWELLING (DEFECTIVE CONCRETE BLOCKWORK) AND CONSTRUCTION OF A NEW DETACHED 2 STOREY REPLACEMENT DWELLING ALONG WITH CONNECTION TO EXISTING SERVICESDecision record indexed
(A) DEMOLITION OF EXISTING SINGLE STOREY OUTBUILDINGS SITUATED TO THE REAR AND SIDE OF EXISTING DWELLING HOUSE, (B) RENOVATION AND RE-ROOFING OF EXISTING TWO STOREY SEMI DETACHED DWELLING HOUSE, (C) CONSTRUCTION OF A TWO STOREY SIDE EXTENSION TO THE NORTH-EAST SIDE OF DWELLING HOUSE TO PROVIDE KITCHEN, DINING ROOM AND FIRST FLOOR BEDROOM ACCOMMODATION TOGETHER WITH SINGLE STOREY FAMILY ROOM, AND (D) SITE DEVELOPMENT WORKS TO FACILITATE THE EXTENSIONDecision record indexed
(1) DEMOLITION OF DERELICT ATTACHED SHED TO SIDE AND KITCHEN EXTENSION TO REAR (2) RENOVATION AND ERECTION OF EXTENSION TO EXISTING DWELLING WITH INSTALLATION OF NEW EFFLUENT TREATMENT PLANT WITH ACCESS VIA ESTABLISHED COMMON ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
RENOVATION WORKS TO FRONT ELEVATION OF 2 NO. SEMI-DETACHED 2 STOREY DWELLING WITH ACCESS VIA ESTABLISHED COMMON ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ERECTION OF AN EXTENSION TO THE REAR OF EXISTING DWELLING WITH NEW EFFLUENT TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) EXISTING AGRICULTURAL MACHINERY STORE (2) FIRST FLOOR OFFICE AND STORAGE ACCOMMODATION TO EXISTING REFRIDGERATION UNIT AND PERMISSION FOR ERECTION OF (1) NEW AGRICULTURAL MACHINERY STORE (2) PHOTOVOLTAIC SOLAR PANELS TO ROOFS OF EXISTING REFRIGERATION UNIT, EXISTING AGRICULTURAL MACHINERY STORE AND PROPOSED NEW AGRICULTURAL MACHINERY STORE AND ALL ASSOCIATED SITE WORKSDecision record indexed
DEMOLITION OF EXISTING DEFECTIVE CONCRETE BLOCK DWELLING HOUSE AND CONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE WORKSDecision record indexed
CHANGE OF USE OF PART OF EXISTING FARM MACHINERY SHED/WORKSHOP TO CREATE A PET CREMATORIUM WITH INCINERATOR AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
EXISTING GARAGE AND PERMISSION FOR (1) DEMOLITION OF EXISTING DWELLING PLANNING REFERENCE: 02/4868 (2) ERECTION OF (A) A REPLACEMENT DWELLING WITH CHANGE OF HOUSE TYPE (B) A GARDEN ROOM (3) CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
ERECTION OF A SLATTED AGRICULTURAL SHED WITH UNDERGROUND STORAGE TANK TO ABUT EXISTING SLATTED AGRICULTURAL SHED WITH UNDERGROUND STORAGE TANK AND ASSOCIATED SITE DEVELOPMENT WORKS WITHIN EXISTING FARM YARDDecision record indexed
DEMOLITION OF AN EXISTING DWELLING AND SHED AND CONSTRUCTION OF A PURPOSE BUILT CHEMIST WITH CONNECTION TO EXISTING PUBLIC SEWER ALONG WITH ALL ASSOCIATED SITE WORKSDecision record indexed
PLACEMENT OF MOBILE HOME AS EMPLOYEE ACCOMMODATION ANCILLARY TO MUSHROOM GROWING BUSINESS WITH CONNECTION TO EXISTING EFFLUENT TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKSGrounds not yet categorised
(1) DEMOLITION OF ATTACHED SHED TO THE NORTHERN ELEVATION AND (2) CONSTRUCTION OF (A) SINGLE STOREY EXTENSION TO THE NORTHERN (REAR) ELEVATION OF EXISTING DWELLING HOUSE AND (B) DETACHED DOMESTIC GARAGE AND ALL ASSOCIATED WORKS AND SITE DEVELOPMENTS WORKSDecision record indexed
3 CARROWMULLIN HEIGHTS, CARROWMULLIN, FAHAN LIFFORD PO
(1) RETENTION OF SHED, (2) DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE BLOCKS (PLANNING REF. NO. 03/4347 REFERS) AND (3) ERECTION OF A REPLACEMENT DWELLING WITH CHANGE OF HOUSE TYPE, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
THE RED DOOR COUNTRY HOUSE, CARROWMULLIN, FAHAN LIFFORD PO
(1) EXTENSIONS TO KITCHEN, STORE AND DINING AREA, (2) OUTDOOR PATIO AREA, (3) ADDITIONAL CAR PARKING AREA AND (4) BYPASS SEPARATOR, CONNECTION TO EXISTING PUBLIC SERVICES AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A ONE AND A HALF STOREY DWELLING WITH DOMESTIC GARAGE, CONNECTION TO ON-SITE WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF A ONE AND A HALF STOREY DWELLING WITH DOMESTIC GARAGE, CONNECTION TO ON-SITE WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKSGrounds not yet categorised
(A) ERECTION OF DWELLING HOUSE WITH WASTE-WATER TREATMENT SYSTEM AND PERCOLATION AREA AND (B) DECOMMISSIONING OF NO.2 DISUSED WELLS, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
(1) ERECTION OF AN EXTENSION TO EXISTING DWELLING HOUSE (2) ALTERATIONS TO FENESTRATION TO FRONT AND SIDE ELEVATIONS OF THE ABOVE MENTIONED DWELLING (3) UPGRADING AND RE-ALIGNMENT OF EXISTING VEHICLE ENTRANCE TO PUBLIC ROAD L-2019-2 (4) CONNECTION TO WASTE WATER TREATMENT SYSTEM GRANTED UNDER PL REF: 19/51239 (5) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) DEMOLITION OF EXISTING SIDE AND REAR EXTENSION, (2) RENOVATIONS AND CONSTRUCTION OF EXTENSIONS TO THE REAR AND SIDE OF THE EXISTING DWELLING, (3) ERECTION OF A DETACHED SHED, (4) CONSTRUCTION OF A NEW FRONT ENTRANCE, (5) DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND (6) AND ALL ASSOCIATED WORKSDecision record indexed
(A) DEMOLITION OF EXISTING DWELLING (B) CONSTRUCTION OF A REPLACEMENT DWELLING WITH ATTACHED GARAGE AND CARPORT WITH CONNECTION TO AN ON SITE EFFLUENT TREATMENT PLANT AND (C) UNDERGROUND STORAGE AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF AN EXISTING DWELLING AND CONSTRUCTION OF A REPLACEMENT DWELLING WITH ATTACHED GARAGE AND CONNECTION TO AN ON-SITE EFFLUENT TREATMENT PLANT AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) CONSTRUCTION OF (A) A NEW UNDERGROUND SLURRY RUN-OFF TANK AND (B) EXTENSION TO AN EXISTING SLATTED SHED TO PROVIDE COVER TO THE PROPOSED TANK AND (2) ALL ASSOCIATED SITE WORKSDecision record indexed
(1) ADDITIONAL FOOTPRINT PROVIDED TO AN EXISTING AGRICULTURAL EQUIPMENT SHED (2) A NEW ENTRANCE TO THE PUBLIC ROAD (3) THE CLOSURE OF AN EXISTING ENTRANCE TO THE PUBLIC ROAD (4) AN ENLARGED SURFACE WATER DRAINAGE PIPE DISCHARGING INTO THE EXISTING STREAM AND PERMISSION FOR (1) CONSTRUCTION OF (A) A NEW SLATTED SHED, EFFLUENT TANK AND ALL ASSOCIATED SITE-WORKS INCLUDING THE LOCAL RAISING OF GROUND LEVEL TO TIE INTO THE EXISTING CONCRETE YARD (B) A NEW LEAN-TO STORAGE SHED TO THE EAST OF AN EXISTING AGRICULTURAL SHEDDecision record indexed
ERECTION OF A DWELLING WITH WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA, DETACHED DOMESTIC GARAGE, CONNECTION TO PUBLIC SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
CONSTRUCTION OF 2 SMALL DWELLINGS WITH CONNECTION TO MAIN SEWER VIA A HOLDING TANK AND PUMP SYSTEM, ALONG WITH ALL ASSOCIATED SITE WORKSGrounds not yet categorised
(1) 2 NO. GLAMPING PODS, 2 NO. HOT TUBS, DECKING AREAS AND CAR PARKING (2) CHANGE OF USE OF OUTBUILDING TO TOILETS AND A SHOWER BLOCK (3) EXTENSION TO EXISTING OUTBUILDING FOR DOMESTIC USE AND CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKSGrounds not yet categorised
(A) 2 NO. GLAMPING PODS, 2 NO. HOT TUBS, DECKING AREAS AND CAR PARKING, (B) CHANGE OF USE OF OUTBUILDING TO TOILETS AND A SHOWER BLOCK, AND (C) EXTENSION TO EXISTING OUTBUILDING FOR DOMESTIC USE AND PERMISSION FOR (A) DECOMMISSIONING OF EXISTING SEPTIC TANK AND (B) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKSDecision record indexed
(1) TWO ECO PODS, (2) EXTENSION TO OUTBUILDING FOR A GUEST TOILET AND WASHROOM, (3) EXTENSION TO OUTBUILDING FOR A DOMESTIC TOOL SHED, (4) CHANGE OF USE OF AN OUTBUILDING LOUNGE FROM DOMESTIC TO GUEST USE, (5) CHANGE OF USE OF OUTBUILDING UTILITY ROOM TO KITCHENETTE FOR GUEST USE, (6) COVERED CANOPY GUEST SEATING AREA, (7) PARTIAL REINSTATEMENT OF SHED ROOF IN DOMESTIC YARD AND (8) PATHWAY, DECKING AND SIGNAGE AND PERMISSION FOR (1) DECOMMISSIONING OF EXISTING SEPTIC TANK, (2) INSTALLATION OF NEW WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS, (3) GUEST PARKING FOR THREE CARS, (4) CONSTRUCTION OF BIKE SHED AND (5) RAINWATER HARVESTING INFRASTRUCTURE AND TANKSDecision record indexed
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK/SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING SINGLE STOREY DWELLING AND CONSTRUCTION OF A NEW TWO STOREY DETACHED DWELLING TOGETHER WITH ASSOCIATED SITE WORKSDecision record indexed