Planning records
Showing 401-450 of 23,874 public recordsChange of use from Montessori to residential use with associated alterations to front elevation
Second floor extension containing additional communal day space and related internal works to the front of the existing building
Construction of a single storey extension (46m2) to the front, side and rear of existing dwelling together with a all associated and ancillary site works
To complete the proposed dwelling, an effluent disposal system and associated site works, (currently constructed up to wall plate level), under plan ref no 07/1116
Alterations to the permitted single-storey security cabin (c.22 sq.m.)(currently under construction) permitted under WCC Reg. Ref. 19/1208. Permission for provision of signage (c.1 sq.m.). Permission is also sought to retain the 2 no. original piers (associated with Ardmore House) at the entrance to the studios, which were permitted to be removed under WCC Reg. Ref. 19/1208. All associated works and services provision
Retention of changes to fenestration and permission for change of use (removal of condition 2 of Planning Register Reference 06/6230) from restricted use as a dwelling to use by all classes of persons
Proposed 75sqm two storey extension to rear of 41sqm single storey dwelling, demolition of existing front entrance porch and reconstruction of same, new waste water treatment system to EPA standards, revised entrance and all associated works.
The construction of a two storey extension to the side of their dwelling house and a single storey extension to the rear with a total additional floor area of 94.5 sq. m. added to the existing area of 102.3 sq. m. giving a total of 204.6 sq. m. The planning application also covers drainage, landscaping and ancillary works including the provision of a Velux roof light to the rear roof to provide natural light to the existing stairwell
Construction of new dwelling, new section of laneway, connection to mains water, upgrading of existing entrance, wastewater treatment system to EPA standards, change to redline boundary together with relocation and upgrade of existing septic tank to new wastewater treatment system to EPA standards from that approved under PRR 91/6616 and associated site works
Development of 12 residential units, permission for partial change of use to increase net retail floor area by 270sqm, retention permission for modifications to a mixed use (retail led) development (Ref. 17469), The development will consist of: I. The construction of two additional floors above the permitted Lidl supermarket to accommodate 12 residential apartments, associated private and communal open space, waste storage areas and 16 resident cycle parking spaces. II. The partial change of use of the permitted first office floor space to accommodate an additional net retail sales floor area of 270sqm and ancillary retail operations. III. Retention permission for the reconfiguration of the permitted ground-floor level, including reconfiguration of the ancillary office space, ancillary supermarket floor space and undercroft car park area. IV. Retention of changes to external elevations, to include modifications to render, glazing, realignment and alterations to windows and doors. V. Retention of changes to the layout of the permitted surface car parking area to include: a) The provision of one single ingress/egress access point along the southern boundary and the removal of the previously permitted egress point b) Reconfiguration of permitted landscaped area, resulting in an additional 11 car parking spaces c) The provision of an existing bin cage and bicycle storage area constructed in place of permitted landscaped area along the northern boundary. VI. Proposed replacement of existing Lidl flagpole of signage with a new mild steel support currently located on the southern frontage. VII. Drainage, landscaping and all associated site development works required to facilitate the proposed development.
The construction of a sheep shed ( floor area 353 msq) in the existing farmyard
Ground floor extension (25 sqm) to eastern side of existing dwelling (57 sqm) including relocation of existing front door to southern elevation of extension, new patio door to northern elevation and alterations to other existing windows and doors, proposed first floor extension (40 sqm) to existing roof of dwelling, all ancillary site works
Change of Use of part of Unit 14, (82.68 m²) from Retail to Dental Clinic comprising the subdivision of the existing Unit 14 by erecting a cross wall at 14 m from the front elevation and for the replacement of the existing entrance doors with new doors in matching style and colour, replacement signage and the erection of internal partitions to form 2 no. dental booths supported by ancillary accommodation
Alterations and extension during construction to a fully serviced split-level detached dwelling house to include extension to lower-level plan, alterations to window and door locations on elevations and roof light to flat roof over kitchen/dining area. Together with all associated site works and connection to public mains services.Previous Planning Reg. No.18/1311
Alterations and extensions to existing dwelling, with ground floor extensions of 32sqm., to include front porch, side and rear extensions, and also first floor extension to rear of 48sqm. with high level clerestory southwest facing windows over existing ridge level including adjustments to chimney. New detached garden-room to side-rear of 13 sqm. Replacement of existing septic tank with new twin chamber septic tank and intermittent soil polishing filer, and all associated site works.
Construction of a concrete skate park, including installation of associated skate features/furniture and the relocation of existing bring facility (bottle banks)
New two-storey, three bedroom house to the rear of the existing house and the widening of the existing vehicular entrance to the west side boundary of the site
1. proposed change of use of 1 of 4 No. existing astro football pitches to 1 No. padel court complete with proposed covered all weather enclosure. 3 No. astro football pitches retained. 2. all ancillary site works
Modification to a previous permission Reg. Ref. 17/469 comprising the installation of a roof-mounted array of solar photovoltaic (PV) panels measuring 470sq. m together with inverters and electrical cabling on the permitted retail outlet to provide renewable energy during the operational phase
Proposed 45m2 domestic garage / home gym building to the rear garden of the detached dwelling
Extension / elevational changes to existing 94 sqm detached bungalow, proposed works include: front extension comprising 41.3 sqm of floor area, rear extension comprising 13.7 sqm of floor area, the raising of existing roof to provide 56 sqm of habitable dormer accommodation at first floor level. All of the above works, together with ancillary site works necessary to complete the development
For the existing as constructed boundary walls / fences, to the front of the detached dwelling
43 sqm extension to side of existing 108 sqm house, internal alterations to existing house including change to fenestration on west elevation, replace existing septic tank with effluent disposal system to EPA guidelines 2009 and associated site works
Change of use from butchers to coffee shop with new signage and associated works
(1) Proposed first floor extension (19.11 sq. metres) and (2) Retention, completion & minor alterations to previously approved partially constructed ground floor extension (29.50 sq. metres) to the front & side of existing 2-storey semi-detached house (Ref. PL39.239909 & 17/357)
1. Proposed 130 no. solar array panels to southern roof and 70 no. solar array panels to northern roof of existing shoreline leisure 2. all ancillary site works to facilitate proposal at Shoreline Leisure
Proposed change of use from retail to medical centre; internal alterations to existing kitchen/staff area, to include partial demolition of existing wall structure and construction of new wall structure; demolition of internal wall structures of existing toilet; construction of 1 no. toilet, store room and reception/seating area; construction of 6 no. consulting rooms; new fire exit door to rear elevation and all associated site works
Dwelling as constructed and upgrade of existing septic tank to new effluent disposal system to current EPA standards
74sqm greenhouse structure in lower section of existing site. Planting of different type of fruit trees on higher section of the site. New steps to connect lower and higher sections of the site, all together with ancillary works including drainage, landscaping and boundary treatment
Construction of a part single storey, part two storey dwelling, office/garage, wastewater treatment system to current EPA standards, accessed off new vehicular entrance to public road (L5014), omitting existing farm entrance, together with associated road alignment, landscaping and site works
74 sqm greenhouse structure in lower section of existing site, 61 sqm polytunnel in higher section of existing site, rubble stone retaining wall and steps to connect lower and higher sections of the site, all together with ancillary works including drainage, landscaping and boundary treatment
Provision of a single storey extension to side (consisting of 2no. mainstream classrooms - proposed floor area = 169sqm) of existing single storey school building (existing floor area = 1,273sqm) together with new basketball court and all associated site works
An amendment to update operational conditions described in the original planning permission (Ref PRR06/84) of 2006 to ensure conditions associated with the planning permission for the school comply with operational requirements set out in the Child Care Act 1991 (Early Years Services) Regulations 2016 and any future legislative amendments. Permission is sought to describe within the planning conditions that Deepdales Montessori will operate as a part-time school or a sessional school, with operational hours between 8am and 6pm. (Note: Per original planning permission (Ref: PRR06/84) the existing operational hours are between 8.30am and 6pm). In addition, a small arrow or flag will be placed in the front garden of the property to guide parents to the correct door of the school
A 30m multi-user lattice type telecommunications support structure with headframe, carrying antenna and dishes enclosed within a 2.4 metre high palisade fenced compound together with associated ground equipment cabinets and associated site works, including extension to an existing forest access track within Coillte forestry
Two storey extension to the side, single storey extension to the front and relocation and widening of the existing entrance pillars to the existing dwelling
Construction of ground floor extension to North end of existing "Sintra" dwelling to form new granny flat. Construction of ground floor extension to East facing elevation to create new living space/bedroom. Relocation of existing "Sintra" dwelling's front door to East facing elevation. Alterations to front boundary of existing "Riverdale" dwelling to create wider vehicular entrance. Alterations to boundary wall separating existing "Riverdale " and "Sintra" dwellings to allow for new car parking area/driveway. Retention of some existing windows and external finishes of existing " Sintra" dwelling. All together with associated works including drainage, landscaping and private open space areas
The development consists/will consist of: (1) Retention of permitted development granted planning permission under Ref. 06/5615 with modifications to site boundaries, vehicular entrance, driveway, detached garage, conversion of attic for storage area with roof lights & effluent treatment system with proposed upgraded soil polishing filter to current EPA standards (2) Proposed change of use (removal of condition No. 2 Ref 06/5615) relating to restrictions on use of the existing dwelling to use by all classes of persons
Proposed two separate single storey extensions to rear of dwelling, elevational changes to window openings and conversion & cladding of existing stables to home gym
A single storey extension to replace existing flat roof portion with larger addition as phase one and for single storey extension as phase two all to rear of existing dwelling and with connection to all services and associated site works
Construction of a single storey extension to the rear of our property
Construction of upgraded farm yard entrance gate including natural stone faced wing walls and pillars, and improvements to sightlines along road boundary
1) Construction of a 64sqm storey and a half side extension to existing dwelling along with internal alterations to the existing, increasing the dwelling from a three bedroom to a four bedroom house 2)Alterations to the existing vehicular entrance to accommodate the new side extension 3) All associated site development and drainage works to facilitate the development
14 no apartments and all associated works. The accommodation will consist of 4 storey development of the following: 8 no one bed apartments, 3 no 2 bed apartments, 3 no 3 bed apartments
Removal of existing septic tank, installation of new wastewater treatment unit and soil polishing filter to current regulations and associate works
Removal of existing single-storey joinery workshop building and adjacent yard, and construction in its place of new nine meter high single-storey storage/processing building, on site at former home of Wicklow Timber and Joinery Ltd, Wurtzburg Avenue, Boghall Road, Bray, Co Wicklow (Eircode A98WD37). This site is immediately adjacent and adjoining the existing home of the applicant company, Packaging Laundry Ltd, at Unit C, Oldcourt Business Park, Wurtzburg Avenue, Boghall Road, Bray, Co Wicklow, (Eircode A98P6N3), and the application includes retention of an external cylindrical water storage tank, and minor items of external plant. It also includes for retention of an existing lean-to building which houses a chipping machine, and retention of an existing wall-mounted wash-area canopy. Other minor associated works will include the provision of markings for car parking, markings for a turning circle, and markings for loading areas, and gates to the external storage areas. Signage, too, is included as illustrated. While the proposed building is intended for storage and display purposes only, it should be noted that Packaging Laundry Ltd do hold a Waste Licence (EPA Waste Licence under the Waste Management Act 1996, as amended) on the existing Packaging Laundry site immediately adjacent. Finally, it should be noted that the existing Wicklow Joinery road-entrance from Wurtzburg Avenue will be closed-over, and the proposed building will be accessed via the existing Packaging Laundry apron within Oldcourt Business Park
(1) The provision of a new single storey extension to the rear of the existing house. (2) Alteration to the front boundary wall to provide a new vehicular entrance
(A) installation of a new front-facing window in lieu of the existing door & window to the existing utility room (former garage), (B) upgrading of the existing flat roof and installation of 3 no. rooflights and (C) construction of a new first floor extension to the side and a two-storey extension to the rear of the existing dwelling and all associated site works
Ground floor extension to side together with connection to all services and associated site works
Flat roof dormer at roof level to the rear
(A) conversion of the existing garage into habitable accommodation, (B) construction of a new pitched roof over the existing garage including the addition of 4no. rooflights and (C) construction of a new two-storey extension to the rear of the existing dwelling and all associated site works